Bid Details

← More Construction bids

Z1DA--Project # 528A6-26-607 Replace Flooring for Rm. 140 B76 | Bath VAMC

Dept. of Veterans Affairs · 242-NETWORK Contract Office 02 (36C242)  |  Not listed  |  Posted Nov 10, 2026
ConstructionSolicitation
Closes Nov 24, 2026 · 11:00 AM ET

Key requirements

  • What the notice asks for: Presolicitation Notice Presolicitation Notice Page 3 of 3 Solicitation *=Required Field Presolicitation Notice Page 1 of 3 DESCRIPTION Presolicitation Notice Presolicitation Notice Page 4 of 4 *=Required Field Presolicitation Notice Page 1 of 4 Page 1 of Page 1 of This solicitation notice is to…
  • Response deadline: Nov 24, 2026 · 11:00 AM ET — see the official posting for submission instructions and format.

Full details

Solicitation number
36C24227B0004
Notice type
Solicitation
NAICS code
236220
PSC code
Z1DA
Posted
Nov 10, 2026
Response deadline
Nov 24, 2026 · 11:00 AM ET

Description

Presolicitation Notice Presolicitation Notice Page 3 of 3 Solicitation *=Required Field Presolicitation Notice Page 1 of 3 DESCRIPTION Presolicitation Notice Presolicitation Notice Page 4 of 4 *=Required Field Presolicitation Notice Page 1 of 4 Page 1 of Page 1 of This solicitation notice is to inform potential offerors that Bath, NY VA Medical Center will be posting a solicitation (36C24227B0004) on or about October 28, 2026, for Replace Flooring RM140 B76. All work is to be performed at the Bath, NY VA Medical Center. General scope of work includes: The general scope of this project is to the replace the existing flooring in Building 76, Rooms 140 and 140A, based on the design documents provided. Additionally, the project encompasses electrical modifications to support the X-ray equipment, including extending power conduits and cables, installing new power switches, providing equipment structural support, and other related work as indicated in the design drawings. As Building 76 operates as a fully functional medical center, work hours may be restricted, and off-hours work may be necessary to ensure uninterrupted hospital operations, as directed by the Contracting Officer s Representative (COR). The contractor shall complete all work within 60 days of receiving the Notice to Proceed. The Bath VAMC requires a Contractor to perform the construction work necessary to accomplish this goal. The Contractor shall provide all supervision, labor, services, tools, equipment, and materials required to perform work. Work under this effort is fully described in the project drawings and specifications. Additional administrative and management related requirements are described throughout this document. A brief overview of the construction work will be included with SOW in the solicitation.

Buyer contact

Primary contact:
Idalia Algarin — Contracting Officer
Email: Idalia.Algarin@va.gov

Source: SAM.gov, the U.S. government's official contract-opportunities system. Details above are reproduced from the official notice — always verify on the official posting before bidding.

Scroll to Top