Bid Details

← More Construction bids

OK FW TSM 10(1) NFH Entrance Road and Parking Improvements

Dept. of Transportation · 6982AF Central Federal Lands Divisi  |  Tishomingo, Oklahoma  |  Posted Nov 10, 2026
ConstructionSolicitationSmall Business Set Aside - Total
Closes Nov 13, 2026 · 2:00 PM

Key requirements

  • Who may bid: Small Business Set Aside - Total
  • What the notice asks for: PROJECT NUMBER: OK FW TSM 10(1) PROJECT NAME: NFH Entrance Road and Parking Improvements PROJECT DESCRIPTION: The Tishomingo National Fish Hatchery (NFH) is in south-central Oklahoma off SH 7 on a 220-acre U.S.
  • Where: Tishomingo, OK, 73460, USA
  • Response deadline: Nov 13, 2026 · 2:00 PM — see the official posting for submission instructions and format.

Full details

Solicitation number
6982AF27B000003
Notice type
Solicitation
NAICS code
237310
PSC code
Y1LB
Set-aside
Small Business Set Aside - Total (SBA)
Place of performance
Tishomingo, OK, 73460, USA
Posted
Nov 10, 2026
Response deadline
Nov 13, 2026 · 2:00 PM

Description

PROJECT NUMBER: OK FW TSM 10(1) PROJECT NAME: NFH Entrance Road and Parking Improvements PROJECT DESCRIPTION: The Tishomingo National Fish Hatchery (NFH) is in south-central Oklahoma off SH 7 on a 220-acre U.S. Fish and Wildlife Service (FWS) facility approximately 8 miles northwest of the Town of Tishomingo. The project will address deteriorated pavement for the entrance loop, adding a small parking area at the northeast corner of the entrance loop, and pavement of the entrance road and parking area south of HWY 7. The 3R project will provide new driving surface, entrance gates, culverts, Architectural Barriers Act (ABA) compliant parking spot, and ABA compliant curb ramp. SCOPE OF THE WORK: The project will consist of full depth reclamation of the existing roads asphalt to a depth of 6-in, paving 3-in of asphalt, super elevation correction, and culvert replacement. New parking areas will be constructed with new aggregate base and asphalt pavement. A concrete ABA compliant curb ramp and ABA compliant parking spot. Concrete aprons will be placed around existing structures to match existing. Two new gates at the entrances to the NFH will also be installed. Entrance roads and parking areas will be closed during construction. PRINCIPAL WORK ITEMS: 30402-5300 Full Depth Reclamation Method 2, 6-inch depth: 6,800 SQYD 40301-0100 Asphalt Concrete Pavement, 1,250 TON 20401-0000 Roadway Excavation, 400 CUYD

Buyer contact

Primary contact:
Eric Grosskreuz
Email: cflcontracts@dot.gov

Secondary contact:
Jorey Deml
Email: cflcontracts@dot.gov

Source: SAM.gov, the U.S. government's official contract-opportunities system. Details above are reproduced from the official notice — always verify on the official posting before bidding.

Scroll to Top