Category Bids

Electrical & power systems — open bids

781 open bids, newest first. Full details live here — you only leave for the official posting when you bid.

GENERATOR,AIRCRAFT,

Department of Defense · DLA Aviation AT Philadelphia, PA  |  Not listed  |  Posted Nov 5, 2026
Electrical & power systemsPresolicitation

NSN 7R-6115-015817910-E7, TDP VER 001, QTY 6 EA, DELIVERY FOB ORIGIN. This part must be acquired from/repaired by a source(s)specified on a source control or selected item drawing as defined by thecurrent version of DoD-STD-100. Suitable technical data, Government data rights, or manufacturing/repair knowledge are not available to permit acquisition from/repair by other sources, nor qualification testing of another part, nor use of a second source part in the intended application. Although, by DoD-STD-100 definition, altered and selected items shall have an adequate technical data package, data review discloses that required data or data rights are not in Government possession and cannot be economically obtained. The subject item requires Government source approval prior to contract award, as the item is flight critical and/or the technical data available has not been determined adequate to support acquisition via full and open competition. Only the source(s) previously approved by the Government for this item have been solicited. The time required for approval of a new source is normally such that an award cannot be delayed pending approval of a new source. If you are not an approved source you must submit, together with your proposal, the information detailed in one of the NAVSUP Weapon Systems Support (NAVSUP WSS) Source Approval Information Brochures listed below. Spares: https://www.navsup.navy.mil/NAVSUP-Enterprise/NAVSUP-Weapon-Systems-Sup port/Business-Opps/ Repair: https://www.navsup.navy.mil/NAVSUP-Enterprise/NAVSUP -Weapon-Systems-Support/Business-Opps/ technical data required to be submitted based on your company's experience in production of the same or similar item, or if this is an item you have never made. If your request for source approval is currently being evaluated at NAVSUP WSS submit with your offer a copy of the cover letter which forwarded your request for source approval. Offers received which fail to provide all data required by the Source Approval Brochure or document previous submission of all data required by the Source Approval Brochure will not be considered for award under this solicitation. Please note, if evaluation of a source approval request submitted hereunder cannot be processed in time and/or approval requirements preclude the ability to obtain subject items in time to meet Government requirements, award of the subject requirement may continue based on Fleet support needs. The NAVSUP WSS Commercial Item Identification Brochure is now available at: "https://www.navsup.navy.mil/NAVSUP-Enterprise/NAVSUP-Weapon-Systems-Support/Bus iness-Opps/" Interested parties may obtain copies of Military and Federal Specificationsand Standards, Qualified Products Lists (QPLs), Qualified Product Databases(QPDs), Military Handbooks, and other standardized documents from the DoDSingle Stock Point (DODSSP) at Document Automation and Production Service(DAPS) in Philadelphia, PA. NOTE: Patterns, Drawings, Deviation Lists, Purchase Descriptions, etc. are NOT stocked at DODSSP. Most documents are available in Adobe PDF format from ASSIST-Online at: http://quicksearch.dla.mil/. Users may use ASSIST-Quick Search to search for and download available documents directly using standard browser software. Documents that are not available for downloading from ASSIST-Quick Search can be ordered from the DODSSP website using the ASSIST Shopping Wizard after obtaining a DODSSP Customer Account by following the registration procedures. Users who do not have access to the internet may contact the DODSSP ASSISTHelp Desk at 215-697-2667 or 215-697-2179 (DSN: 442-2667), or mail their request to DLADocument Services, Bldg. 4/D, 700 Robbins Avenue, Philadelphia PA 19111-5094. The proposed contract action is for supplies or services for which the Government intends to solicit and negotiate with only one source under the authority of FAR 6.302-1. All responsible sources may identify their interest and capability to respond to the requirement or submit proposals, quotationsor capability statements. This notice of intent is not a request forcompetitive proposals. However, all proposals received within 45 days (30days if award is issued under an existing Basic Ordering Agreement (BOA) afterdate of publication of this synopsis will be considered by the Government. A determination by the Government not to compete with this proposed contract based upon responses to this notice is solely within the discretion of the Government. Information received will normally be considered solely for the purpose of determining whether to conduct a competitive procurement. Based upon market research, the Government is not using the policies contained in FAR Part 12, Acquisition of Commercial Items, in its solicitation for the described supplies or services. However, interested persons may identify tothe contracting officer their interest and capability to satisfy theGovernment's requirement with a commercial item within 15 days of this notice.

Closes Dec 21, 2026 · 12:00 AM ET
Read more →

NSN 5995-01-599-3052 - Cable Assembly, Special Purpose, Electrical

Department of Defense · DLA Aviation  |  Richmond, Virginia  |  Posted Nov 5, 2026
Electrical & power systemsPresolicitation

PR 1000248270 5995-01-599-3052 INDEFINITE QUANTITY CABLE ASSEMBLY, SPECIAL PURPOSE ELECTRICAL QUANTITY: 774 END ITEM APPLICATION: F-16 Aircraft APPROVED SOURCES: WINCHESTER INTERCONNECT CM CA, INC. 55944 P/N 176643-2 NORTHROP GRUMMAN SYSTEMS CORPORATION 0J198 P/N 176643-2 DRS NETWORK & IMAGING SYSTEMS, LLC 1RWE7 P/N 176643-2 ACE ELECTRONICS DEFENSE SYSTEMS, LLC 5TWH2 P/N 176643-2 Solicitation will be other than full and open competition. This item is critical application. Pricing will be evaluated on the Estimated Annual Demand (EAD): 774 each The Guaranteed Minimum will be cited in the solicitation. There will be a 5-year base period without an option. DELIVERY: FOB Origin; I/A Destination Stock delivery locations will be to any facility in the Continental United States as cited on each delivery. IT IS NOT ESTIMATED THAT THE TOTAL VALUE WILL EXCEED THE TINA THRESHOLD. HOWEVER PLEASE BE PREPARED TO SUBMIT CERTIFIFIED COST/PRICING DATA WITH YOUR OFFER IF NECESSARY. NUMBER NOTE 26 APPLIES ELECTRONIC OFFERS ARE NOT ACCEPTABLE. OFFERORS MUST SUBMIT A COMPLETED SOLICITATION PACKAGE. A COPY OF THE SOLICITATION WILL BE AVAILABLE VIA DIBBS AT https//www.dibbs.bsm.mil.RFP ON THE ISSUE DATE CITED IN THE RFP. RFP'S ARE IN PORTABLE DOCUMENT FORMAT (PDF). TO DOWNLOAD AND VIEW THESE DOCUMENTS YOU WILL NEED THE LATEST VERSION OF ADOBE ACROBAT. THIS SOFTWARE IS AVAILABLE FREE AT http://www.adobe.com. A PAPER COPY OF THIS SOLICITATION WILL BE AVAILABLE TO REQUESTERS. THE SOLICITATION ISSUE DATE IS OR ABOUT NOVEMBER 23, 2026.

Closes Dec 23, 2026 · 3:00 PM ET
Read more →

NSN 5995-01-599-3052 - Cable Assembly, Special Purpose, Electrical

Department of Defense · DLA Aviation  |  Richmond, Virginia  |  Posted Nov 5, 2026
Electrical & power systemsPresolicitation

PR 1000248270 5995-01-599-3052 INDEFINITE QUANTITY CABLE ASSEMBLY, SPECIAL PURPOSE ELECTRICAL QUANTITY: 774 END ITEM APPLICATION: F-16 Aircraft APPROVED SOURCES: WINCHESTER INTERCONNECT CM CA, INC. 55944 P/N 176643-2 NORTHROP GRUMMAN SYSTEMS CORPORATION 0J198 P/N 176643-2 DRS NETWORK & IMAGING SYSTEMS, LLC 1RWE7 P/N 176643-2 ACE ELECTRONICS DEFENSE SYSTEMS, LLC 5TWH2 P/N 176643-2 Solicitation will be other than full and open competition. This item is critical application. Pricing will be evaluated on the Estimated Annual Demand (EAD): 774 each The Guaranteed Minimum will be cited in the solicitation. There will be a 5-year base period without an option. DELIVERY: FOB Origin; I/A Destination Stock delivery locations will be to any facility in the Continental United States as cited on each delivery. IT IS NOT ESTIMATED THAT THE TOTAL VALUE WILL EXCEED THE TINA THRESHOLD. HOWEVER PLEASE BE PREPARED TO SUBMIT CERTIFIFIED COST/PRICING DATA WITH YOUR OFFER IF NECESSARY. NUMBER NOTE 26 APPLIES ELECTRONIC OFFERS ARE NOT ACCEPTABLE. OFFERORS MUST SUBMIT A COMPLETED SOLICITATION PACKAGE. A COPY OF THE SOLICITATION WILL BE AVAILABLE VIA DIBBS AT https//www.dibbs.bsm.mil.RFP ON THE ISSUE DATE CITED IN THE RFP. RFP'S ARE IN PORTABLE DOCUMENT FORMAT (PDF). TO DOWNLOAD AND VIEW THESE DOCUMENTS YOU WILL NEED THE LATEST VERSION OF ADOBE ACROBAT. THIS SOFTWARE IS AVAILABLE FREE AT http://www.adobe.com. A PAPER COPY OF THIS SOLICITATION WILL BE AVAILABLE TO REQUESTERS. THE SOLICITATION ISSUE DATE IS OR ABOUT NOVEMBER 23, 2026.

Closes Dec 23, 2026 · 3:00 PM ET
Read more →

CIRCUIT CARD ASSEMB

Department of Defense · Navsup Weapon Systems Support MECH  |  Not listed  |  Posted Nov 5, 2026
Electrical & power systemsSolicitation

CONTACT INFORMATION|4|N741.14|CP4|N/A|AMELIA.E.HARPER.CIV@US.NAVY.MIL| ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19|||||||||||||||||||| HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT (DEC 2014)|1|See specifications Section C and Section E.| INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)|2||| INSPECTION AND ACCEPTANCE - SHORT VERSION|8||||||||| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|Stand-Alone Receiving Report - Certifications; COMBO - Receiving Report & Invoice - Material |N/A|TBD|N00104|TBD|TBD|SW3117-1|TBD|N/A|N/A|N/A|N/A|N/A|N/A|N /A|| NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|WSS| MANDATORY USE OF WORKFLOW PRO (WFP) MOD ASSIST MODULE|1|CS| EQUAL OPPORTUNITY FOR VETERANS (DEV 2026-O0040)(FEB 2026)|4||||| WARRANTY OF SUPPLIES OF A NONCOMPLEX NATURE (JUNE 2003)|6|One year from date of delivery.|One year from date of delivery.||||| EQUAL OPPORTUNITY FOR WORKERS WITH DISABILITIES (DEV 2026-O0040)(FEB 2026)|4||||| TRANSPORTATION OF SUPPLIES BY SEA (OCT 2024)|2||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM-BASIC (FEB 2024)|11|||||||||||| SMALL BUSINESS SUBCONTRACTING PLAN (DOD CONTRACTS)-BASIC (DEV 2026-O0037)(JUL 2026))|2||| OPTION FOR INCREASED QUANTITY (MAR 1989)|1|365 DAYS| CONTRACTOR PURCHASING SYSTEM ADMINISTRATION-BASIC (DEV 2026-O0015)(JUL 2026)|1|| SECURITY PROHIBITIONS AND EXCLUSIONS (CLASS DEVIATION 2026-O0025)(FEB 2026)|7|||||||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024))|5|||||| BUY AMERICAN-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024)|1|| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (DEVIATION 2026-O0043)(FEB 2026))|13|||||||||||||| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PERPARDENESS, AND ENRGY PROGAM USE (APRIL 2008))|2||X| 1. This requirement is pursuant to Emergency Acquisition Flexibilities (EAF). 2. The resultant award of this solicitation will be issued bilaterally, requiring the contractor's written acceptance prior to execution. 3. All contractual documents (i.e. contracts, purchase orders, task orders, delivery orders, and modifications) related to the instant procurement are considered to be "issued" by the Government when copies are either deposited in the mail, transmitted by facsimile, or sent by other electronic commerce methods such as email. The Government's acceptance of the contractor's proposal constitutes bilateral agreement to "issue" contractual documents as detailed herein. 4. If the offeror is not the Original End Manufacturer (OEM) of the material called out in the requirement, the OEM must be stated (Company Name and CAGE) and the offeror must provide a signed letter of authorization as a distributor on the OEM's letterhead. 5. If the requirement will be packaged at a location different from the offeror's address, the offeror shall provide the name, street address, and CAGE of the facility. 6. Any contract awarded as a result of this solicitation will be DO certified for national defense under the Defense Priorities and Allocations System (DPAS). Provision 52.211-14, Notice of Priority Rating for National Defense, Emergency Preparedness, and Energy Program Use, shall be inserted in solicitations when the contract to be awarded shall be a rated order. 7. The Government retains the option to order an additional quantity up to 100% of this order for 365 days ARO at the same price. The Government may choose to exercise this option or not. \ 1. SCOPE 1.1 This contract/purchase order contains the requirements for manufacture and the contract quality requirements for the CIRCUIT CARD ASSEMB . 2. APPLICABLE DOCUMENTS 2.1 Applicable Documents - The document(s) listed below form a part of this contract/purchase order including modifications or exclusions. 2.1.1 "Document References" listed below must be obtained by the Contractor. Ordering information is included as an attachment to this contract/purchase order. 2.2 Order of Precedence - In the event of a conflict between the text of this contract/purchase order and the references and/or drawings cited herein, the text of this contract/purchase order shall take precedence. Nothing in this contract/purchase order, however, shall supersede applicable laws and regulations unless a specific exemption has been obtained. DOCUMENT REF DATA=MIL-STD-129 | | |P |041029|A| |03| DOCUMENT REF DATA=ISO9001 | | | |010417|A| | | 3. REQUIREMENTS 3.1 Cage Code/Reference Number Items - The CIRCUIT CARD ASSEMB furnished under this contract/purchase order shall be the design represented by Cage Code(s) reference number(s). Cage _______ ref. no. ;03538 77C733423G001 03538 77C733423G1; 3.2 Marking - This item shall be physically identified in accordance with ;MIL-STD-129; . 3.3 Changes in Design, Material Servicing, or Part Number - Except for a Code 1 change, which shall be processed as provided in the code statement shown below, no substitution of items shall be made until the SPCC Contracting Officer has been notified and approval has been given by issuance of a written change order. When any change in design, material, servicing or part number is made to replace or substitute any item to be furnished on this contract/purchase order, the Contractor shall furnish, for the substituting/replacement item, a drawing and an explanation of the reason for the change, or a detailed description of the change, explaining the reason therefore. If finished detail drawings are not available, shop drawings inthe form used by the manufacturer will be acceptable for Government evaluation. When notifying the Contracting Officer of the reasons for making substitutions, the type of change shall be indicated by code number in accordance with one of the following statements: Code 1: PART NUMBER CHANGE/MINOR DESIGN CHANGE - If the Manufacturer's Part Number or item design indicated thereon has changed, but form, fit and function of the item is not affected thereby, and the design change meets the criteria for minor, by not effecting form, fit, function, reliability or safety , supply the item and advise SPCC immediately of the new part number, furnishing a detail drawing and/or a detailed description of the change, as applicable. Code 2: Assembly (or set or kit) not furnished - Used following detail parts. Code 3: Part not furnished separately - Use assembly. Code 4: Part redesigned - Old and new parts are completely interchangeable. Code 5: Part redesigned - New part replaces old. Old part cannot replace new. Code 6: Part redesigned - Parts not interchangeable. 3.4 Mercury Free - The material supplied under this contract/purchase order is intended for use on submarines/surface ships and therefore shall contain no metallic mercury and shall be free from mercury contamination. Mercury contamination of the material will be cause for rejection. If the inclusion of metallic mercury is required as a functional part of the material furnished under this contract, the Contractor shall obtain written approval from the Procurement Contracting Officer before proceeding with manufacture. The contractor's request shall explain in detail the requirements for mercury, identify specifically the parts to contain mercury, and explain the method of protection against mercury escape. Such a request will be forwarded directly to the Procurement Contracting Officer with a copy to the applicable Government Inspector. Upon approval by the Contracting Officer, the vendor will provide a "Warning Plate" stating that metallic mercury is a functional part of the item and will include name and location of that part. The use of mercury, mercury compounds, or mercury-bearing instruments and/or equipment in a manner which might cause contamination in the manufacture, assembly, or test of material on this contract is prohibited. The most probable causes of contamination are direct-connected manometers, mercury vacuum pumps, mercury seals, or the handling of mercury in the immediate vicinity. Mercury switches, mercury in glass thermometers, standard cells and other items containing mercury may be used if they are located so as not to constitute a contamination hazard. If external contamination by metallic mercury occurs or is suspected, the following test may be used to determine whether contamination by metallic mercury exists or whether corrective cleaning measures have been effective. Enclose the equipment in a polyethylene bag or close-fitting airtight container for eight hours at room temperature (70 degrees F minimum).Sample the trapped air and if mercury vapor concentration is 0.01 mg/cu meter or more, the material is mercury contaminated insofar as the requirements of this contract are concerned. These requirements shall be included in any subcontract or purchase order hereunder and the Contractor shall insure SubContractor compliance with these requirements. Technical questions pertaining to these requirements shall be referred to the Procurement Contracting Officer via the cognizant Administrative Contracting Officer. For background, the following information is provided: Mercury is corrosive to gold, silver, nickel, stainless steels, aluminum and copper alloys. Stainless steels, nickel, and copper alloys are widely used in reactor plants and other submarine/surface ship systems. Accidental trapping of mercury in a component could cause serious damage to vital parts. Mercury is also toxic if inhaled, ingested, or absorbed through the skin. It is evident that grave consequences could result from small amounts of mercury vapor present in an unreplenished submarine/surface ship atmosphere. 4. QUALITY ASSURANCE 4.1 Responsibility for Inspection - Unless otherwise specified in the contract/purchase order, the Contractor is responsible for the performance of all inspection requirements as specified herein. Except as otherwise specified in the contract/purchase order, the Contractor may use his own or any other facilities suitable for the performance of the inspection requirements specified herein, unless disapproved by the Government. The Government reserves the right to perform any of the inspections set forth in the specification where such inspections are deemed necessary to assure supplies and services conform to prescribed requirements. 4.2 Quality System Requirements - The supplier shall provide and maintain a quality system acceptable to the Government. The quality system requirements shall be in accordance with ISO 9001. 4.2.1 ;Suppliers currently using and maintaining Inspection System Requirements to MIL-I-45208 are granted permission to utilize MIL-I-45208 if desired.; 4.3 Responsibility for Compliance - All items must meet all requirements of this contract/purchase order. The inspection set forth in this specification shall become a part of the Contractor's overall inspection system or quality program. The absence of any inspection requirements shall not relieve the Contractor of the responsibility of assuring that all products or supplies submitted to the Government for acceptance comply with all requirements of the contract/purchase order. Sampling in quality conformance does not authorize submission of known defective material, either indicated or actual, not does it commit the Government to acceptance of defective material. 4.4 Records of Inspection - (This requirement is not applicable to Government Purchase Orders) Records of all inspection work performed by the Contractor, as referenced elsewhere in this contract, shall be kept complete and available to the Government during the performance of the contract and for a period of four years after final delivery of supplies. 5. PACKAGING 5.1 Preservation, Packaging, Packing and Marking - Preservation, Packaging, Packing and Marking shall be in accordance with the Contract/Purchase Order Schedule and as specified below. MIL-STD 2073 PACKAGING APPLIES AS FOUND ELSEWHERE IN THE SCHEDULE 6. NOTES 6.1 Ordering Information for Document References - The Department of Defense Single Stock Point (DODSSP), Website http://www.dsp.dla.mil/, provides product information for the Department Of Defense Index Of Specifications and Standards (DODISS) (i.e.Military/Federal Specifications and Standards), Data Item Descriptions (DIDs), and other DODSSP Products. A. Availability of Cancelled Documents - The DODSSP offers cancelled documents that are required by private industry in fulfillment of contractual obligations in paper format. Documents can be requested by phoning the Subscription Services Desk. B. Commercial Specifications, Standards, and Descriptions - These specifications, standards and descriptions are not available from Government sources. They may be obtained from the publishers of the applicable societies. C. Ordnance Standards (OS), Weapons Specifications (WS), and NAVORD OSTD 600 Pages - These type publications may be obtained by submitting a request to: Commander, Indian Head Division, Naval Surface Warfare Center Code 8410P, 101 Strauss Avenue Indian Head, MD 20640-5035 D. On post-award actions, requests for "Official Use Only" and "NOFORN" (Not Releasable To Foreign Nationals) documents must identify the Government Contract Number, and must be submitted via the cognizant Defense Contract Management Command (DCMC) for certification of need for the document. On pre-award actions such requests must be submitted to the PCO for certification of need for the document. E. NOFORN Military Specifications and Standards (including Amendments, Change Notices and Supplements, but NOT interim Changes) to be ordered from: Contracting Officer NAVICP-MECH Code 87321 5450 Carlisle Pike P.O. Box 2020 Mechanicsburg, Pa. 17055-0788 F. Nuclear Reactor Publications Assigned NAVSEA Documents and Identification Numbers (i.e. NAVSEA Welding Standard, NAVSEA 250-1500-1) are to be ordered from: Commanding Officer NAVICP-MECH Code 009 5450 Carlisle Pike P.O. Box 2020 Mechanicsburg, Pa. 17055-0788 G. Technical Manuals Assigned NAVSEA Identification Numbers (i.e. NAVSEA Welding And Brazing Procedure, NAVSEA S9074-AQ-GIB-010/248) are to be ordered from: Naval Inventory Control Point Code 1 Support Branch 700 Robbins Avenue Phildelphia, Pa. 19111-5094 H. Interim Changes and Classified Specifications shall be obtained by submitting a request on DD Form 1425 to NAVICP-MECH. 6.2 Notice To Distributors/Offerors - Consideration for award of contract shall be given only to authorized distributors of the original manufacturer's item represented in this solicitation. If you desire to be considered as a potential source for award of this contract, proof of being an authorized distributor shall be provided on company letterhead signed by a responsible company official and sent with your offer to the Procurement Contracting Officer.

Closes Jan 28, 2027 · 4:30 PM ET
Read more →

CIRCUIT CARD ASSEMB, IN REPAIR/MODIFICATION OF

Department of Defense · Navsup Weapon Systems Support MECH  |  Not listed  |  Posted Nov 5, 2026
Electrical & power systemsSolicitation

CONTACT INFORMATION|4|N741.14|CP4|N/A|AMELIA.E.HARPER.CIV@US.NAVY.MIL| ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19|||||||||||||||||||| INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)|2||| INSPECTION AND ACCEPTANCE - SHORT VERSION|8||||||||| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|Stand-Alone Receiving Report - Certifications; COMBO - Receiving Report & Invoice - Material |N/A|TBD|N00104|TBD|TBD|SW3117-1|TBD|N/A|N/A|N/A|N/A|N/A|N/A|N /A|| NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|WSS| MANDATORY USE OF WORKFLOW PRO (WFP) MOD ASSIST MODULE|1|CS| EQUAL OPPORTUNITY FOR VETERANS (DEV 2026-O0040)(FEB 2026)|4||||| WARRANTY OF SUPPLIES OF A NONCOMPLEX NATURE (JUNE 2003)|6|One year from date of delivery.|One year from date of delivery.||||| EQUAL OPPORTUNITY FOR WORKERS WITH DISABILITIES (DEV 2026-O0040)(FEB 2026)|4||||| TRANSPORTATION OF SUPPLIES BY SEA (OCT 2024)|2||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM-BASIC (FEB 2024)|11|||||||||||| NOTICE OF CYBERSECURITY MATURITY MODEL CERTIFICATION LEVEL REQUIREMENTS (NOV 2025))|1|| OPTION FOR INCREASED QUANTITY (MAR 1989)|1|365 DAYS| CONTRACTOR PURCHASING SYSTEM ADMINISTRATION-BASIC (DEV 2026-O0015)(JUL 2026)|1|| SECURITY PROHIBITIONS AND EXCLUSIONS (CLASS DEVIATION 2026-O0025)(FEB 2026)|7|||||||| SMALL BUSINESS PROGRAM REPRESENTATIONS (DEV 2026-O0037)(FEB 2026)|20|334412|750 EMPLOYEES||||||||||||||||||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024))|5|||||| BUY AMERICAN-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024)|1|| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (DEVIATION 2026-O0043)(FEB 2026))|13|||||||||||||| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PERPARDENESS, AND ENRGY PROGAM USE (APRIL 2008))|2||X| 1. This requirement is pursuant to Emergency Acquisition Flexibilities (EAF). 2. The resultant award of this solicitation will be issued bilaterally, requiring the contractor's written acceptance prior to execution. 3. All contractual documents (i.e. contracts, purchase orders, task orders, delivery orders, and modifications) related to the instant procurement are considered to be "issued" by the Government when copies are either deposited in the mail, transmitted by facsimile, or set be other electronic commerce methods such as email. The Government's acceptance of the contractor's proposal constitutes bilateral agreement to "issue" contractual documents as detailed herein. 4. If the offeror is not the Original End Manufacturer (OEM) of the material called out in the requirement, the OEM must be stated (Company Name and CAGE) and the offeror must provide a signed letter of authorization as a distributor on the OEM's letterhead. 5. If requirement will be packaged at a location different from the Offeror's address, the Offeror shall provide the Name, Street Address and CAGE of the Packaging Facility. 6. Any contract awarded as a result of this solicitation will be DO certified for national defense under the Defense Priorities and Allocations System (DPAS). Provision 52.211-14, Notice of Priority Rating for National Defense, Emergency Preparedness, and Energy Program Use, shall be inserted in solicitations when the contract to be awarded will be a rated order. 7. Please provide repair price as Estimated (EST) for the full repair effort of the requirement. 8. Vendor shall have 90 days after receipt of carcass(es) to complete a teardown & evaluation (TD&E) of the carcass(es) and submit a Firm-Fixed Price (FFP) quote for the full repair effort of the carcass(es). 9. When submitting a quote, please include the cost of new (actual or estimated) for evaluation purposes. 10. Quote shall specify any exceptions including but not limited to MIL-STD Packaging, MIL-STD Labeling, Inspection & Acceptance locations, Packaging House, surplus materials, etc. If no exceptions are indicated or received, award shall be based upon solicitation requirements. Changes or requests for changes after award shall be subject to consideration costs deducted from the unit price. 11. In repair price, include all costs associated with receipt and complete repair of material that may be in unwhole condition, missing hardware, damaged, handling damage, missing parts, wear damage, and CAV Reporting. Also provide the following information: a. Teardown & Evaluation Rate: b. Repair Turn Around Time (RTAT): c. Throughput Constraint: d. Induction Expiration Date: 12. PRICE REDUCTIONS a. Any asset for which the contractor does not meet the required RTAT will incur a price reduction of XXXX per unit. This adjustment will be implemented via a Reduction Modification at the end of contract performance. Price reductions made pursuant to this section shall not limit other remedies available to the Government for failure to meet required RTATs, including but not limited to the Government's right to terminate for default. 13. The Contractor must obtain final inspection and acceptance by the Government for all assets within the RTAT established in the resulting contract. a. Requested RTAT: 039 Days 14. Quotes shall reference the proposed RTAT and any capacity constraints. 15. The Contracting Officer (KO) reserves the right to exercise the option SubCLIN with 365 days of the effective date of this award. The contractor will provide the same delivery time and price listed in the schedule. A modification shall be completed at the time the option is exercised and all current contract terms and conditions shall apply to the option quantity. \ 1. SCOPE 1.1 This contract/purchase order contains the requirements for repair and the contract quality requirements for the CIRCUIT CARD ASSEMB . 2. APPLICABLE DOCUMENTS 2.1 Applicable Documents - The document(s) listed below form a part of this contract/purchase order including modifications or exclusions. 2.1.1 "Document References" listed below must be obtained by the Contractor. Ordering information is included as an attachment to this contract/purchase order. DOCUMENT REF DATA=MIL-STD-129 | | |P |041029|A| |03| 3. REQUIREMENTS 3.1 Cage Code/Reference Number Items - The CIRCUIT CARD ASSEMB repaired under this contract/purchase order shall meet the operational and functional requirements as represented by the Cage Code(s) and reference number(s) listed below. All repair work shall be performed in accordance with the contractors repair/overhaul standard practices, manuals and directives including but not limited to drawings, technical orders, manufacturing operations, tooling instructions, approved repair standards and any other contractor or government approved documents developed to provide technical repair procedures. CAGE___Ref. No. ;03538 77C734234G001; 3.2 Marking - This item shall be physically identified in accordance with ;MIL-STD-129; . 3.3 Changes in Design, Material Servicing, or Part Number - Except for a Code 1 change, which shall be processed as provided in the code statement shown below, no substitution of items shall be made until the NAVICP-MECH Contracting Officer has notified and approval has been given by issuance of a written change order. When any change in design, material, servicing or part number is made to replace or substitute any item to be furnished on this contract/purchase order, the Contractor shall furnish, for the substituting/replacement item, a drawing and an explanation of the reason for the change, explaining the reason therefor. If finished detail drawings are not available, shop drawings in the form used by the manufacturer will be acceptable for Government evaluation. When notifying the Procurement Contracting Officer of the reasons for making substitutions, the type of change shall be indicated by code number in accordance with one of the following statements: Code 1: PART NUMBER CHANGE ONLY - If the Manufacturer's Part Number indicated thereon has changed, but the parts are identical in all respects, supply the item and advise NAVICP-MECH immediately of the new part number. Code 2: Assembly (or set or kit) not furnished - Used following detail parts. Code 3: Part not furnished separately - Use assembly. Code 4: Part redesigned - Old and new parts are completely interchangeable. Code 5: Part redesigned - New part replaces old. Old part cannot replace new. Code 6: Part redesigned - Parts not interchangeable. 3.4 Mercury Free - The material supplied under this contract/purchase order is intended for use on submarines/surface ships and therefore shall contain no metallic mercury and shall be free from mercury contamination. Mercury contamination of the material will be cause for rejection. If the inclusion of metallic mercury is required as a functional part of the material furnished under this contract, the Contractor shall obtain written approval from the Procurement Contracting Officer before proceeding with manufacture. The contractor's request shall explain in detail the requirements for mercury, identify specifically the parts to contain mercury, and explain the method of protection against mercury escape. Such a request will be forwarded directly to the Procurement Contracting Officer with a copy to the applicable Government Inspector. Upon approval by the Contracting Officer, the vendor will provide a "Warning Plate" stating that metallic mercury is a functional part of the item and will include name and location of that part. The use of mercury, mercury compounds, or mercury-bearing instruments and/or equipment in a manner which might cause contamination in the manufacture, assembly, or test of material on this contract is prohibited. The most probable causes of contamination are direct-connected manometers, mercury vacuum pumps, mercury seals, or the handling of mercury in the immediate vicinity. Mercury switches, mercury in glass thermometers, standard cells and other items containing mercury may be used if they are located so as not to constitute a contamination hazard. If external contamination by metallic mercury occurs or is suspected, the following test may be used to determine whether contamination by metallic mercury exists or whether corrective cleaning measures have been effective. Enclose the equipment in a polyethylene bag or close-fitting airtight container for eight hours at room temperature (70 degrees F minimum).Sample the trapped air and if mercury vapor concentration is 0.01 mg/cu meter or more, the material is mercury contaminated insofar as the requirements of this contract are concerned. These requirements shall be included in any subcontract or purchase order hereunder and the Contractor shall insure SubContractor compliance with these requirements. Technical questions pertaining to these requirements shall be referred to the Procurement Contracting Officer via the cognizant Administrative Contracting Officer. For background, the following information is provided: Mercury is corrosive to gold, silver, nickel, stainless steels, aluminum and copper alloys. Stainless steels, nickel, and copper alloys are widely used in reactor plants and other submarine/surface ship systems. Accidental trapping of mercury in a component could cause serious damage to vital parts. Mercury is also toxic if inhaled, ingested, or absorbed through the skin. It is evident that grave consequences could result from small amounts of mercury vapor present in an unreplenished submarine/surface ship atmosphere. 4. QUALITY ASSURANCE 4.1 Responsibility for Inspection - Unless otherwise specified in the contract/purchase order, the Contractor is responsible for the performance of all inspection requirements as specified herein. Except as otherwise specified in the contract/purchase order, the Contractor may use his own or any other facilities suitable for the performance of the inspection requirements specified herein, unless disapproved by the Government. The Government reserves the right to perform any of the inspections set forth in the specification where such inspections are deemed necessary to assure supplies and services conform to prescribed requirements. 4.2 Inspection/Testing Repaired Items - The Contractor shall perform all inspection and testing requirements as specified in the original manufacturer's specifications and drawings. 4.3 Records - Records of all inspection work by the Contractor shall be kept complete and available to the Government during the performance of contract/purchase order and for a period of 365 calendar days after final delivery of supplies. 5. PACKAGING 5.1 Preservation, Packaging, Packing and Marking - Preservation, Packaging, Packing and Marking shall be in accordance with the Contract/Purchase Order Schedule and as specified below. MIL-STD 2073 PACKAGING APPLIES AS FOUND ELSEWHERE IN THE SCHEDULE 6. NOTES 6.1 Ordering Information for Document References - The Department of Defense Single Stock Point (DODSSP), Website http://www.dsp.dla.mil/, provides product information for the Department Of Defense Index Of Specifications and Standards (DODISS) (i.e.Military/Federal Specifications and Standards), Data Item Descriptions (DIDs), and other DODSSP Products. Most Specifications can obtained directly from http://quicksearch.dla.mil/ A. Availability of Cancelled Documents - The DODSSP offers cancelled documentsthat are required by private industry in fulfillment of contractual obligationsin paper format. Documents can be requested by phoning the Subscription Services Desk. B. Commercial Specifications, Standards, and Descriptions - These specifications, standards and descriptions are not available from Government sources. Theymay be obtained from the publishers of the applicable societies. C. Ordnance Standards (OS), Weapons Specifications (WS), and NAVORD OSTD 600 Pages - These type publications may be obtained by submitting a request to: Commander, Indian Head Division, Naval Surface Warfare Center Code 8410P, 101 Strauss Avenue Indian Head, MD 20640-5035 D. On post-award actions, requests for "Official Use Only" and "NOFORN" (Not Releasable To Foreign Nationals) documents must identify the Government ContractNumber, and must be submitted via the cognizant Defense Contract Management Command (DCMC) for certification of need for the document. On pre-award actions such requests must be submitted to the PCO for certification of need for the document. E. NOFORN Military Specifications and Standards (including Amendments, Change Notices and Supplements, but NOT interim Changes) to be ordered from: Contracting Officer NAVSUP-WSS Code 87321 5450 Carlisle Pike P.O. Box 2020 Mechanicsburg, Pa. 17055-0788 F. Nuclear Reactor Publications Assigned NAVSEA Documents and Identification Numbers (i.e. NAVSEA Welding Standard, NAVSEA 250-1500-1) are to be ordered enue: Commanding Officer NAVSUP-WSS Code 009 5450 Carlisle Pike P.O. Box 2020 Mechanicsburg, Pa. 17055-0788 G. Technical Manuals Assigned NAVSEA Identification Numbers (i.e. NAVSEA Welding And Brazing Procedure, NAVSEA S9074-AQ-GIB-010/248) are to be ordered from: Commanding Officer NAVSUP-WSS Code 1 Support Branch 700 Robbins Avenue Philadelphia, Pa. 19111-5094 H. Interim Changes and Classified Specifications must be obtained by submitting a request on DD Form 1425 to NAVSUP-WSS. 6.2 In accordance with OPNAVINST 5510.1 all documents and drawings provided by the U.S. Navy to perspective Contractors must include a "Distribution Statement" to inform the contractor of the limits of distribution, and the safeguarding of the information contained on those documents and drawings. There are 7 (seven) seperate distribution statement codes used for non-classified documents and drawings. The definition for each is as follows: A... approved for public release; distribution is unlimited. B... distribution authorized to US Governments agencies only. C... distribution authorized to US Government agencies and their contractors. D... distribution authorized to DoD and DoD contractors only. E... distribution authorized to DoD Components only. F... further distribution only as directed by Commander, Naval Sea Systems Command, code 09T. X... distribution is authorized to US Government agencies and private individuals or enterprises eligible to obtain export controlled technical data in accordance with OPNAVINST 5510.161. 6.3 Notice To Distributors/Offerors - Consideration for award of contract shall be given only to authorized distributors of the original manufacturer's item represented in this solicitation. If you desire to be considered as a potential source for award of this contract, proof of being an authorized distributor shall be provided on company letterhead signed by a responsible company official and sent with your offer to the Procurement Contracting Officer.

Closes Jan 28, 2027 · 4:30 PM ET
Read more →

TRAY ASSEMBLY,PROCE

Department of Defense · SPRMM1 DLA Mechanicsburg  |  Not listed  |  Posted Nov 5, 2026
Electrical & power systemsSolicitation

ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19|||||||||||||||||||| INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)|2||| INSPECTION AND ACCEPTANCE - SHORT VERSION|8|X||X|||||| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|INVOICE AND RECEIVING REPORT (COMBO)||TBD|SPRMM1|TBD|TBD|TBD|TBD|||TBD|||||TBD| MANDATORY USE OF WORKFLOW PRO (WFP) MOD ASSIST MODULE|1|ZIE| EQUAL OPPORTUNITY FOR VETERANS (DEV 2026-O0040)(FEB 2026)|4||||| NOTICE OF CYBERSECURITY MATURITY MODEL CERTIFICATION LEVEL REQUIREMENTS (NOV 2025))|1|| PREFERENCE FOR PRIVATELY OWNED U.S.-FLAG COMMERCIAL VESSELS (DEV 2026-O0047)(MAR 2026))|2||| SECURITY PROHIBITIONS AND EXCLUSIONS (CLASS DEVIATION 2026-O0025)(FEB 2026)|7|||||||| SMALL BUSINESS PROGRAM REPRESENTATIONS (DEV 2026-O0037)(FEB 2026)|20|334412|750 EMPLOYEES||||||||||||||||||| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (DEVIATION 2026-O0043)(FEB 2026))|13|X|X|X|||X|||||||| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PERPARDENESS, AND ENRGY PROGAM USE (APRIL 2008))|2|X|| This amendment is being done to consolidate two requsitions for the same NIIN.The new quantiy requested within this solicitation is 18 units. The soliciatiation has been extended to 11 Febuary 2027. \ 1. All contractual documents (i.e. contracts, purchase orders, task orders, Delivery orders, and modifications) related to the instant procurement are considered to be "issued" by the government when copies are either deposited in the mail, transmitted by facsimile, or sent by other electronic commerce methods, such as email. The government's acceptance of the contractor's proposal constitutes bilateral agreement to "issue" contractual documents as detailed herein. 2. Drawings or technical data are not available for this item. 3. Delivery days_________aro. 4. Offer valid for _____ days. 5. When submitting quotes via Electronic Data Interchange (EDI), make sure you specify any exceptions (i.e. Mil specs/standards, packaging, Inspection & Acceptance (I&A), packaging houses etc) or follow up with a hardcopy of the exceptions. If nothing is indicated or received, award will be based upon solicitation requirements. Changes or requests for changes after award will have consideration costs deducted on modifications. 6. If you are not the manufacturer of the material you are offering, you MUST state who the Original Equipment Manufacturer (OEM) is ?Commercial and Government Entity Code (CAGE) code? and the part number you are offering. 7. Please provide an email address for follow up communications. ____________________________________________________________ 8. It is recommended that vendors provide contact information to NAVSUP Weapon System Support (WSS) Mechanicsburg in order to receive automated notifications from Navy Electronic Commerce Online (NECO) when contracts/modifications are issued by Defense Logistics Agency (DLA) Weapons Support Mechanicsburg and posted on Procurement Integrated Enterprise Environment (PIEE) Electronic Data Access (EDA). To receive these notifications, contact: NAVSUPWSS code 025, procurement systems design and contract support division Via email at NAVSUPWSSITIMPHelpdesk@navy.mil. Please include the following information with your request: CAGE code, company name, address and Point-of-Contact (POC) with phone number and email address. 9. Contractors can view their orders, contracts and modifications at the EDA web tool. This web tool is located at the PIEE website. It is recommended that the contractor register for EDA at https://piee.eb.mil/. Click on new user and registration. Any order resulting from this Request for Quotation will require electronic submittal of Invoice and Receiving Report (COMBO) through PIEE-WAWF. 10. The following DLA Procurement Notes are applicable to this requirement: E06 Inspection and Acceptance at Source (JUN 2018) 11. INSPECTION OF MATERIAL WILL BE AT (CAGE & ADDRESS): ______________________________________________________________ INSPECTION OF PACKAGING AND FINAL ACCEPTANCE OF MATERIAL WILL BE AT (CAGE & ADDRESS): ______________________________________________________________ 12. UCF SECTION F PRODUCTION FACILITY CHANGES (a) The performance of any of the work contracted for in any place other than that named in the contract is prohibited unless specifically approved by the Contracting Officer. Written requests for a change in production facilities must be submitted in writing to the Contracting Officer. Changes in production facilities may be approved, provided: (1) Performance by small business or in labor surplus areas as required by the contract will not be changed; (2) The change will not cause a delay in delivery or necessitate a change in the purchase description; (3) The free on board (f.o.b.) point is not changed; and (4) Each request is supported by a price reduction of $250.00 to cover the Government's administrative costs to process the change. (b) The Government reserves the right to deny approval even if these four elements are met. Award evaluations will be made using the Lowest Price Technically Acceptable (LPTA) criteria per DFARS 215.101-2-70(a)(1)(i). This requirement is being solicited under FAR Part 18, Emergency Acquisitions, utilizing Emergency Acquisition Flexibilities (EAF) Authority. 1. SCOPE 1.1 This contract/purchase order contains the requirements for manufacture and the contract quality requirements for the TRAY ASSEMBLY,PROCE . 2. APPLICABLE DOCUMENTS 2.1 Applicable Documents - The document(s) listed below form a part of this contract/purchase order including modifications or exclusions. 2.1.1 "Document References" listed below must be obtained by the Contractor. Ordering information is included as an attachment to this contract/purchase order. 2.2 Identification of Classified Documents - This contract/purchase order requires the Contractor to have authorized access to classified documents in accordance with the attached Contract Security Classification Specification (DD Form 254). The classified documents and security level are: ;Secret; 3. REQUIREMENTS 3.1 Cage Code/Reference Number Items - The TRAY ASSEMBLY,PROCE furnished under this contract/purchase order shall be the design represented by Cage Code(s) reference number(s). Cage _______ ref. no. ;53711 8430978; 3.2 Marking - This item shall be physically identified in accordance with ;MIL-STD-130, REV N, 16 NOV 2012; . 3.3 Changes in Design, Material Servicing, or Part Number - Except for a Code 1 change, which shall be processed as provided in the code statement shown below, no substitution of items shall be made until the NAVICP-MECH Contracting Officer has notified and approval has been given by issuance of a written change order. When any change in design, material, servicing or part number is made to replace or substitute any item to be furnished on this contract/purchase order, the Contractor shall furnish, for the substituting/replacement item, a drawing and an explanation of the reason for the change, explaining the reason therefor. If finished detail drawings are not available, shop drawings in the form used by the manufacturer will be acceptable for Government evaluation. When notifying the Procurement Contracting Officer of the reasons for making substitutions, the type of change shall be indicated by code number in accordance with one of the following statements: Code 1: PART NUMBER CHANGE ONLY - If the Manufacturer's Part Number indicated thereon has changed, but the parts are identical in all respects, supply the item and advise NAVICP-MECH immediately of the new part number. Code 2: Assembly (or set or kit) not furnished - Used following detail parts. Code 3: Part not furnished separately - Use assembly. Code 4: Part redesigned - Old and new parts are completely interchangeable. Code 5: Part redesigned - New part replaces old. Old part cannot replace new. Code 6: Part redesigned - Parts not interchangeable. 3.4 Security Clearance Required - This contract/purchase order requires the Contractor to have a Government Security Clearance in accordance with the attached Contract Security Classification Specification (DD Form 254). 3.5 Electrostatic Discharge Control - The Contractor shall comply with the electrostatic discharge control requirements established in ANSI/ESD S20.20, "ESD Association Standard for the Development of an Electrostatic Discharge Control Program for Protection of Electrical and Electronic Parts, Assemblies and Equipment (Excluding Electrically Initiated Explosive Devices)", which superseded MIL-STD-1686C. 3.6 Marking - This assembly and its piece parts shall be physically identified in accordance with MIL-STD-130. 4. QUALITY ASSURANCE 4.1 Responsibility for Inspection - Unless otherwise specified in the contract/purchase order, the Contractor is responsible for the performance of all inspection requirements as specified herein. Except as otherwise specified in the contract/purchase order, the Contractor may use his own or any other facilities suitable for the performance of the inspection requirements specified herein, unless disapproved by the Government. The Government reserves the right to perform any of the inspections set forth in the specification where such inspections are deemed necessary to assure supplies and services conform to prescribed requirements. 4.2 Responsibility for Compliance - All items must meet all requirements of this contract/purchase order. The inspection set forth in this specification shall become a part of the Contractor's overall inspection system or quality program. The absence of any inspection requirements shall not relieve the Contractor of the responsibility of assuring that all products or supplies submitted to the Government for acceptance comply with all requirements of the contract/purchase order. Sampling in quality conformance does not authorize submission of known defective material, either indicated or actual, not does it commit the Government to acceptance of defective material. 4.3 Records - Records of all inspection work by the Contractor shall be kept complete and available to the Government during the performance of contract/purchase order and for a period of 365 calendar days after final delivery of supplies. 5. PACKAGING 5.1 Preservation, Packaging, Packing and Marking - Preservation, Packaging, Packing and Marking shall be in accordance with the Contract/Purchase Order Schedule and as specified below. MIL-STD 2073 PACKAGING APPLIES AS FOUND ELSEWHERE IN THE SCHEDULE 6. NOTES 6.1 Ordering Information for Document References - The Department of Defense Single Stock Point (DODSSP), Website http://www.dsp.dla.mil/, provides product information for the Department Of Defense Index Of Specifications and Standards (DODISS) (i.e.Military/Federal Specifications and Standards), Data Item Descriptions (DIDs), and other DODSSP Products. Most Specifications can obtained directly from http://quicksearch.dla.mil/ A. Availability of Cancelled Documents - The DODSSP offers cancelled documentsthat are required by private industry in fulfillment of contractual obligationsin paper format. Documents can be requested by phoning the Subscription Services Desk. B. Commercial Specifications, Standards, and Descriptions - These specifications, standards and descriptions are not available from Government sources. Theymay be obtained from the publishers of the applicable societies. C. Ordnance Standards (OS), Weapons Specifications (WS), and NAVORD OSTD 600 Pages - These type publications may be obtained by submitting a request to: Commander, Indian Head Division, Naval Surface Warfare Center Code 8410P, 101 Strauss Avenue Indian Head, MD 20640-5035 D. On post-award actions, requests for "Official Use Only" and "NOFORN" (Not Releasable To Foreign Nationals) documents must identify the Government ContractNumber, and must be submitted via the cognizant Defense Contract Management Command (DCMC) for certification of need for the document. On pre-award actions such requests must be submitted to the PCO for certification of need for the document. E. NOFORN Military Specifications and Standards (including Amendments, Change Notices and Supplements, but NOT interim Changes) to be ordered from: Contracting Officer NAVSUP-WSS Code 87321 5450 Carlisle Pike P.O. Box 2020 Mechanicsburg, Pa. 17055-0788 F. Nuclear Reactor Publications Assigned NAVSEA Documents and Identification Numbers (i.e. NAVSEA Welding Standard, NAVSEA 250-1500-1) are to be ordered enue: Commanding Officer NAVSUP-WSS Code 009 5450 Carlisle Pike P.O. Box 2020 Mechanicsburg, Pa. 17055-0788 G. Technical Manuals Assigned NAVSEA Identification Numbers (i.e. NAVSEA Welding And Brazing Procedure, NAVSEA S9074-AQ-GIB-010/248) are to be ordered from: Commanding Officer NAVSUP-WSS Code 1 Support Branch 700 Robbins Avenue Philadelphia, Pa. 19111-5094 H. Interim Changes and Classified Specifications must be obtained by submitting a request on DD Form 1425 to NAVSUP-WSS. 6.2 Notice To Distributors/Offerors - Consideration for award of contract shall be given only to authorized distributors of the original manufacturer's item represented in this solicitation. If you desire to be considered as a potential source for award of this contract, proof of being an authorized distributor shall be provided on company letterhead signed by a responsible company official and sent with your offer to the Procurement Contracting Officer. 6.3 In accordance with OPNAVINST 5510.1 all documents and drawings provided by the U.S. Navy to perspective Contractors must include a "Distribution Statement" to inform the contractor of the limits of distribution, and the safeguarding of the information contained on those documents and drawings. There are 7 (seven) seperate distribution statement codes used for non-classified documents and drawings. The definition for each is as follows: A... approved for public release; distribution is unlimited. B... distribution authorized to US Governments agencies only. C... distribution authorized to US Government agencies and their contractors. D... distribution authorized to DoD and DoD contractors only. E... distribution authorized to DoD Components only. F... further distribution only as directed by Commander, Naval Sea Systems Command, code 09T. X... distribution is authorized to US Government agencies and private individuals or enterprises eligible to obtain export controlled technical data in accordance with OPNAVINST 5510.161.

Closes Feb 11, 2027 · 4:30 PM ET
Read more →

Multiple NSNs

Department of Defense · DLA Aviation AT Huntsville, AL  |  Not listed  |  Posted Nov 5, 2026
Electrical & power systemsSolicitation

Letter Request for Proposal (RFP) � SPRRA2-27-R-0800 Dear Raytheon Company, The Defense Logistics Agency (DLA) hereby issues this Request for Proposal (RFP), Solicitation No. SPRRA2-27-R-0800 for the addition of five (5) National Stock Numbers (NSNs) / Part Numbers (PNs) to the existing Indefinite Delivery Requirements (IDR) Long-Term Contract (LTC), Contract No. SPRRA2-25-D-0016, hereinafter referred to as the Alpha VI Contract. The Alpha VI Contract was awarded on September 26, 2025, as a subsumable contract under Raytheon Technologies Corporation�s Umbrella Contract No. SPRBL1-25-D-0006, awarded on August 1, 2025. This contract superseded the prior Depot Level Repairable (DLR) contract, SPRBL1-15-D-0017 (Alpha V). The requirements associated with this solicitation are identified in Enclosure 01, Identification of Requirements (IOR) and Proposal Information, and Enclosure 02, Identification of Requirements (IOR) and Proposal Information_FMS, which details the five (5) NSNs/PNs included in this procurement. These requirements support the Patriot Missile System and other critical defense systems. The terms and conditions of Umbrella Contract No. SPRBL1-25-D-0006 and the Alpha VI Contract No. SPRRA2-25-D-0016 shall govern the rights and obligations of both the Government and the Contractor. This solicitation is issued on a sole-source basis to Raytheon Company (CAGE 05716) pursuant to 10 U.S.C. � 3204(a)(1) and FAR 6.302-1, as only one responsible source is capable of satisfying the Government�s requirements. 4130-01-446-6666 11472929 ACCUMULATOR, REFRIGE 5998-01-421-5940 11474926 CIRCUIT CARD ASSEMB 6150-01-421-5969 11475051 CABLE ASSEMBLY,POWE 5998-01-091-0606 11449008 CIRCUIT CARD ASSEMB 5895-01-662-1336 13658979 SYNTHESIZER, ELECTRIC

Closes Feb 28, 2027 · 5:00 PM
Read more →

LEX Triannual Energy Study and ARC Flash Testing

Dept. of Veterans Affairs · 249-NETWORK Contract Office 9 (36C249)  |  Lexington, Kentucky  |  Posted Nov 5, 2026
Electrical & power systemsCombined Synopsis/SolicitationService-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside (FAR 19.14)

(i) This is a combined synopsis/solicitation for commercial products or commercial services prepared in accordance with RFO Part 12. This announcement constitutes the only solicitation. Offers are being requested and a separate written solicitation will not be issued. This acquisition is a 100% Total Set- Aside for Service Disable Veteran Owned Small Business concerns. This solicitation incorporates provisions and clauses by reference. The full text of provisions and clauses may be accessed electronically at www.acquisition.gov. Solicitation number 36C24927Q0038 is issued as a request for quotation (RFQ) for LEX Triennial Energy Study and ARC Flash Testing Service. Site visits are scheduled on Monday 11/16/2026 at 08:00am ET for the Lexington Sousley Campus @ 08:30 AM 2250 Leestown Road, Lexington, KY 4051, Bldg. 20 and Tuesday 11/17/2026 @ 08:30 AM ET for the Lexington Troy Bowling Campus, 1101 Veterans Dr., Lexington, KY 40502 in the main lobby. (Space Left Blank Intentionally) (ii) PRICE/COST SCHEDULE ITEM INFORMATION ITEM NUMBER DESCRIPTION OF SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT 1001 1.00 JB __________________ __________________ Electrical Power Distribution System and Arc Flash, Coordination, and Short-Circuit studies of all its components at the VA Health Care System two Divisions: Bowling Campus, 1101 Veterans Drive, Lexington, KY Contract Period POP Begin: 12-01-2026 POP End: 03-01-2027 PRINCIPAL NAICS CODE: 238210 - Electrical Contractors and Other Wiring Installation Contractors PRODUCT/SERVICE CODE: H361 - Inspection - Electric Wire and Power Distribution Equipment LOCAL STOCK NUMBER: N/A 1002 1.00 JB __________________ __________________ Emergency repair and maintenance work on a continuous (including overtime) basis if circuits cannot be energized after inspection and maintenance have been accomplished in accordance with the contract. Contract Period POP Begin: 12-01-2026 POP End: 03-01-2027 PRINCIPAL NAICS CODE: 238210 - Electrical Contractors and Other Wiring Installation Contractors PRODUCT/SERVICE CODE: H361 - Inspection - Electric Wire and Power Distribution Equipment LOCAL STOCK NUMBER: N/A GRAND TOTAL __________________ (iii) STATEMENT OF WORK Triennial Energy Study and Arc Flash Testing Department of Veterans Affairs Lexington, KY Bowling & Sousley Divisions, VA Health Care System 1. Introduction: This Statement of Work (SOW) describes the requirements for the maintenance, inspection, testing, and/or calibration of the Electrical Power Distribution System and Arc Flash, Coordination, and Short-Circuit studies on all its components at the Veterans Administration (VA) Health Care System two Divisions: Bowling Campus, 1101 Veterans Drive, Lexington, KY 40502, and Sousley Campus, 2250 Leestown Road, Lexington, KY 40511. These work items are referenced as Maintenance and Testing in this document, hereafter. This SOW describes the requirements for the Qualified Electrical Contract Professionals known as Contractors in this document, hereafter. Contractors who are contracted by VA Medical Center to perform maintenance and testing of the Electrical Power Distribution System, and all its components shall meet all requirements stated in Section 2 of this SOW. This SOW describes the requirements to establish maintenance and testing reports. 2. Qualifications of Contractors: Contractors shall be experienced Electrical Contractors, having properly trained and licensed permanent staff required to perform the proposed work. Electrical Contracting (i.e. the construction, repair, testing and maintenance of industrial and commercial electrical distribution systems) shall be the primary interest/specialty of the Contractor s business. Contractors shall be certified by the International Electrical Testing Association (NETA) or equivalent certifying organization as Certified Technicians with each having completed the Occupational Safety & Health Administration (OSHA) approved 10-hour construction safety training. Superintendent or Project Manager must have OSHA 30-hour construction training. All Contractors employees and/or Sub-Contractors must attend the Veterans Administration Medical Center (VAMC) Contractor Orientation class. Contractors shall have technical training and demonstrable track records of working experience in maintenance, inspection, and testing of the Electrical Power Distribution Systems and related components in healthcare, industrial, educational, and commercial facilities for a minimum of five (5) continuous years. Electrical components on which the Contractors have experience shall include, but not be limited to, switchboards & switchgear (low and medium voltage); low voltage controls; emergency and standby generators; automatic transfer switches, wiring, transformers, meters, grounding, and other electrical appurtenances. Contractors shall have safety trainings either on-the-job or class-room type - in electrical safety outlined in the OSHA Standard 29 Code of Federal Regulations (CFR) 1910 Subpart S Electrical, and the National Fire Protection Association (NFPA) 70E Standard for Electrical Safety in the Workplace. Training certification shall be provided indicating each technician is a Qualified Person as defined by NFPA 70E. Training certifications shall be submitted to the VA Contracting Officer prior to work. If no training certifications are available, the contractor Employer shall certify that he/she has met this requirement in writing and submit it to the VA Contracting Officer prior to work. Contractors shall have ready access to the latest versions of the following references: NFPA 70, National Electrical Code. NFPA 70B, Recommended Practice for Electrical Equipment Maintenance. NFPA 70E, Standard for Electrical Safety for the Workplace. NFPA 110, Standard for Emergency and Standby Power System. OSHA Standard 29 CFR 1910, Subparts I & S. International Electrical Testing Association, Inc. (NETA) Maintenance and Testing Specifications. Operating /Maintenance manuals and specifications of the electrical equipment to be maintained and tested. These documents may be obtained from the Veterans Healthcare Administration( VHA) Medical Center, or the equipment manufacturers. VHA Directive 1028, Electrical Power Distribution System Contractors shall have and provide all necessary tools, equipment, and Personal Protective Equipment (PPE) to perform the work safely, effectively, and timely. Tools, equipment, and PPE shall comply with the requirements of OSHA Standard 29 CFR 1910, Subpart I, and NFPA 70E. Prior to initiating work, Contractor shall provide documentation that all instruments, test equipment, tools and PPE have current calibration. Dated calibration labels shall be visible on all instruments, test equipment, tools and PPE as appropriate. If a Scheduled/Approved outage would affect hospital operations, VA shall be able to reschedule with no contract modifications. 3. Summary of Work: The Contractor shall provide a proposed schedule with their bid proposal. The schedule shall be in the form of a progress chart of suitable scale to indicate the work scheduled for completion by any given date during the work period. The proposed schedule shall be reviewed by the VAMC Engineering Service; any requirements for adjusting the schedule (e.g. to minimize disruption to the VAMC) shall be incorporated by the Contractor. Contractors shall report deficiencies that are deemed critical or catastrophic immediately to the Contracting Officer and Chief of Engineering Service for immediate actions. Work items, definitions, and references shall comply with the latest edition of the NETA Maintenance Testing Specifications (MTS) and with the VHA Directive, Electrical Power Distribution System. Below is a list of electrical equipment that shall be maintained and tested: Switchgear and Switchboard Assemblies. Transformers, Dry Type, Air-Cooled, Low-voltage, Small. Transformers, Dry Type, Air-Cooled, Low-voltage, Large. Transformers, Liquid-Filled. Metal Enclosed Busways. Switches, Air, Low-Voltage. Switches, Air, Medium-Voltage, Metal-Enclosed. Circuit Breakers, Air, Insulated-Case/ Molded-Case. Circuit Breakers, Air, Low-Voltage Power. Circuit Breakers, Air, Medium-Voltage. Protective Relays, Mechanical, and Solid State. Protective Relays Microprocessor Based. Grounding Systems. Ground-fault Protection Systems. Motor Control, Motor Starters, Low-Voltage. Motor Control, Motor Starter, Medium-Voltage. Emergency Systems, Engine Generators. Emergency Systems, Automatic Transfer Switches. Distribution Panels Perform Arc-Flash Study/Labeling on all equipment requiring labels. Provide laminated, adhesive-backed flash and shock hazard/PPE signs for each system location will be provided and installed. Based on the results of the incident energy study, the supplier shall produce and install a warning label (orange 40 cal/cm2) for each piece of equipment in accordance with American National Standards Institute (ANSI) Z535.4-2002. The label must be readable in both indoor and outdoor environments for at least 3 years and contain the following information: Arc hazard boundary (inches) Working distance (inches) Arc flash incident energy at the working distance (calories/ cm2) PPE category and description including the glove rating Voltage rating of the equipment Limited approach distance (inches) Restricted approach distance (inches) Equipment/bus name Date prepared Supplier name and address Attachments. Government Furnished. Inventory of Electrical Power Distribution System equipment to be maintained, inspected, and tested under this Scope of Work. One-line and other informational drawings of the Electrical Power Distribution System. These drawings are not certified as-built drawings. Electrical Power System study information relevant to the scope of this effort, such as coordination study data, short-circuit analysis, arc-flash hazard analysis and available protective device setting information. 4-Hour Power Outage Test The Contractor shall be present for and will participate in the VAMC 4-hour test of the Essential Electrical System (EES). This test shall fulfill the requirements of VHA Directive, Electrical Power Distribution System, NFPA 110 (e.g. Para. 8.4.9.) and The Joint Commission. This test will include opening of all utility service connections serving the VAMC for a minimum of 4-hours. During the test period, verify operation of all EES components including the transfer to emergency power and return to normal service. The Contractor shall include in their bid proposal all costs associated with the services of the local utility company for the duration of the test. The estimated duration of the Contractor s involvement is between 8 12 hours. The Contractor shall assist the VAMC staff with troubleshooting and correcting malfunctioning electrical equipment discovered during the test. Contractor shall make any required adjustments and/or re-calibrations to all equipment which has been otherwise maintained, inspected, and tested under this Scope of Work. Deliverables: A. A complete written report of the work performed shall be provided to the VA within 7 days of completion. Information shown in the report shall be as following: Company s name, addresses, telephone, & FAX numbers. Name and signature of contractors who perform the maintenance and testing. VA Work Contract Number, name and number of VA Contracting Officer. Date and Time of work. Copies of contractors valid licenses, professional and training certificates. Descriptions and model number of specialized tools and equipment used, such as torque wrench or infra-red scanning camera. Location, Type, Name, and nameplate information of electrical equipment to be maintained and tested. Descriptions of work items. Test data. Reference materials such as equipment manufacturer s specifications, coordination study, etc. Remarks on conditions of electrical equipment. List all deficiencies, if any. Recommended corrective actions, if any. Submit four (4) hard copies of the complete written report to VA Contracting Officer within seven (7) calendar days of visit. C. Submit four (4) hard copies of the complete written report, and one (1) CD-ROM or DVD of the electronic version of the report in Microsoft Word format to the Chief of Engineering Service within seven (7) calendar days of visit. All reference materials shall be included in the electronic version of the report, either through scanning or other means of electronic text import methods. D. Drawings (Full-size for site, primary one-line diagram and secondary one-line diagrams) Use the latest version of AutoCAD (compatible with the local VAMCs version) and provide the viewer on each CD. For the Final Study Submittal, the VAMC shall receive live CADD drawing files which can be manipulated and updated. 5. Description / Specifications: The Contractor shall provide all management, supervision, labor, materials, supplies, repair parts, tools, instruments, and equipment, and travel expenses to provide the work and services specified in this contract. The Contractor shall plan, schedule, coordinate, and ensure effective and economical completion of all work and services specified in this contract. Most of the work will be accomplished at night and after the normal working hours. Normal working hours are 7:00 am to 4:30 pm ET Monday thru Friday. It may be possible to schedule some non-disruptive work during normal working hours. This Preventive Maintenance Inspection (PMI) is to be scheduled with the Contracting Officer Representative (COR). The PMI and any requested power outages must be scheduled a minimum of 2 weeks in advance. The specifications are a statement of the minimum level of work and services that are to be provided in certain areas under this contract. They are not intended to be, nor shall they be construed as, limiting specifications or requirements. At a minimum, the Contractor will be required to take all steps and measures, which would be taken by a prudent building owner to maximize the life expectancy of the property. All equipment at the facility shall be maintained at an acceptable level, throughout the contract performance period unless and until removed from the scope of work. An "acceptable level" of maintenance as defined as the level of maintenance which will preserve the equipment in unimpaired operating condition: i.e. above the point where deterioration will begin, thereby diminishing the normal life expectancy of the equipment. The Contractor shall maintain areas and storerooms in a clean and orderly manner. When work is performed in these areas, the Contractor's personnel shall clean up all debris and leave the area in a presentable condition. The Contractor must obtain the approval of the Electronics Shop Supervisor before storing anything in machinery space. Operating supplies such is lubricants, rags, and cleaners, etc. shall be properly secured in containers approved by the Electronics Shop Supervisor and stored in accordance with fire and safety requirements outlined in NFPA, Building Fire Safety Criteria. The Contractor shall coordinate all outages with Engineering Services. Prior to start of work, the Contractor must submit a complete schedule of all equipment being shut down, out/on time and affected departments/services. Contractor will give (2) two weeks to provide a schedule for both divisions. It shall be the responsibility of the Contractor to obtain permission from the local utility for main feeder outages. Any fees for such power outages or required permits shall be the Contractor's responsibility. 6. Scheduled Preventive Maintenance Requirements 1. All power outages for maintenance shall be scheduled during off-hours or weekends. Some work may be able to be accomplished during normal working hours and this work will be approved by the COR on a case-by-case basis. All maintenance shall be completed within 90 calendar days of contract start date. The Contractor shall submit a complete detailed maintenance schedule for approval to the Contracting Officer Representative (COR). The following specific criteria will be adhered to in addition to the above-mentioned General Scheduling requirements: a. All preventive maintenance scheduled for each period must be completed during that period. Requests by the Contractor for deviations from the approved schedule must be submitted with appropriate justification to the Electronics Shop Supervisor for approval. b. The Contractor shall coordinate the work with the COR, Facilities Management and shall immediately report the quantity and urgency for repair of any discrepancies found during the inspection. c. VAMC electricians will de-energize and re-energize circuits in accordance with the approved schedules. The Contractor will be responsible for establishing all required Lockout/Tag out (LO/TO) Procedures as required by OSHA, as well as verifying that systems are energized and de-energized. One (1) copy of the LO/TO procedures will be given to the COR. d. In accordance with the VHA Directive 1028, written procedures are established to prepare the medical center for a planned electrical outage. The procedures must consider the worst case of risk to patients, staff, visitors, and VHA property. When a planned electrical outage cannot be accomplished, the following requirements are mandatory for working on energized circuit: 1. Full and proper protective equipment (PPE) is available and worn by the qualified electricians. 2. Qualified electricians are provided with flame-retardant clothing for work at the proximity of energized electrical equipment. 3. Before initiating work, a specific work plan is developed, and a peer review of the plan documented. e. The work plan must include procedures to be used on and near the energized electrical equipment, barriers to be installed, safety equipment to be provided, and exit paths to be accessed. f. An Energized Circuit Work Permit must be obtained from the Chief of Engineering office. g. Contractor must submit a detailed list of all chemicals, planned to be used for this PMI, for approval. h. All workers (technicians and helpers) must have certification/documentation as evidence of their degree of Training and skill on the original equipment manufacturer before being allowed on work site. Worker s certification/documentation must be submitted at the time of offer. i. The VA will neither furnish personnel to assist the Contractor in accomplishing his work nor furnish tools or equipment for the inspections. j. The Contractor must review all high-pot testing procedures prior to performance, with the COR. k. The Contractor may be requested to perform emergency repair work on a continuous (including overtime) basis if circuits cannot be energized after inspection and maintenance have been accomplished in accordance with the contract. The VAMC via change order will arrange additional payment lot subsequent charges, separate purchase order, or credit card. 7. Procedures: At a minimum, the Contractor shall perform all manufacturers recommended testing and preventive maintenance on all listed equipment. Grounding and Connections: In accordance with VA Directive 1028, the contractor will test ground resistance for the entire facility grounding system to include but not limited to fall-of potential, induced frequency and clamp on testing. Fall of potential method is requested where soil is available to drive testing rods. Any measurements reading in excess of 25 ohms shall be immediately discussed with the COR. Where lightning protection systems are provided, the system must be certified in accordance with Underwriters Laboratories (UL) 96A standard. The Contractor shall check all grounding systems in accordance with National Electrical Code (NEC) and ANSI. The connections to buses, transformers, and contacts etc., the Contractor shall check for tightness and torque per manufacturers recommendations. Power Generators: The Contractor shall preform an oil a coolant sample test of the three existing generators. Contractor will provide a report to the COR. Low/Medium Voltage Switchgear: Breakers Clean: Blow off with clean dry compressed air, remove old lubrication. Inspect: Visually inspect for signs of wear, loose or missing hardware, burned/eroded/misaligned contacts, broken, chipped, burned arc-chutes. Lubricate: Oil/grease breaker mechanism at all pivot points, bearings, slides, etc. Adjust mechanism and confirm proper operation of both positive and negative interlocks. High-Current Test and Calibrate to manufacturer's time current characteristic curves. Operate breaker to insure correct operation. Insulation Resistance and Conductance tests. Perform Thermal Imaging of all bolted contacts, bolted or plug-in connections, and all other components subject to heating under load. Furnish typed final and draft test reports. Breaker Cubicle 1. Clean and visually inspect. 2. Lubricate as necessary. 3. Check breaker adjustment-make minor adjustments, if required. 4. Check contacts. 5. Check all bolted connections for high resistance and proper tightness. 6. Record number of operations. 7. Insulation Resistance test (2500 volts). 8. Check cubicle heater. 9. Inspect control wiring and controls. 10. Inspect interlocks and safety shutters. 11. Lubricate breaker-elevating mechanism. 12. Operate breaker using test coupling and test block. Circuit Protective Relays 1. Mechanical components will be checked for dirt particles or obstructions that would hamper relay operation. 3. Instantaneous and seal-in units will be checked for proper alignment. 4. Relay internal wiring connections will be checked for proper tightness or other discrepancies. 5. Relay contacts will be inspected for excessive pitting, burning or discrepancies. 6. The relay contacts will be checked for proper circuit continuity. 7. Minimum pick-up or operating point of each relay will be checked and adjusted as required. 8. Each relay will be checked and adjusted to correspond to the manufacturer's operating time/current curves at two and four times the relay current setting. 9. Seal-in and instantaneous units will be tested for proper electrical operation and calibration. Pad mounted Oil and Dry type Transformers 1. Visually inspect transformers for damaged insulators, potheads, damaged bushings or indications of overheating of cable connections. 2. For oil transformers, inspect transformer pressure relief devices; tap changers, liquid level indicators and cooling tubes for discrepancies. Refill insulating oil to proper level. 3. For oil transformers, inspect primary bushings, secondary bushings, cooling tubes, and tap changers for evidence of oil leaks. 4. For oil transformers, remove insulating liquid sample from each transformer and tap changer compartment and test for: Screen Test: Dielectric strength Water content (ppm) Visual Sediment Color Acidity Specific Gravity Comprehensive Test: Refractive index Viscosity Interfacial tension Other Testing: Gas-in-oil analysis 5. Clean all bushing and insulator surfaces. 6. Verify proper operation of auxiliary devices such as; fans, pressure relief devices, and tap changer. 7. Perform insulation resistance tests, winding to winding and winding to ground. 8. Perform transformer turns ratio test on operating tap. 9. Perform power factor test on all high-low voltage windings and bushings. 10. Verify transformer pressure, Nitrogen/dry air will to be added if required. 11. Record and reset transformer oil and winding temperature gauges. 12. Inspect all transformers for sign of overheating with thermal imaging detection equipment, and inspect for any damages to the housing, connection points, or insulation. 13. Test and replace cooling liquid in liquid cooled transformers and indicate if the liquid no longer meets manufacturer s specification. The liquid must be re-filled to meet the manufacturer s specification. 14. Inspect all dry type transformers for overheating with an infra-red thermal detecting equipment. 15. Check and test all ground connections. 16. Check all bolted electrical connections for high resistance and proper tightness. Main Feeder Units 1. Clean cubical. 2. Check connections for tightness. 3. Check and clean contacts. 4. Check control wiring. 5. Lubricate per manufacturer's recommendation. Transfer Switches All ASCOTM brand transfer switches must be tested and maintained by ASCOTM technicians. 1. Visual and Mechanical Inspection A. Inspect physical and mechanical condition. B. Lubrication Verify appropriate contact lubricant on moving current-carrying parts. Verify appropriate lubrication on moving and sliding surfaces. C. Verify that manual transfer warnings are attached and visible. D. Verify tightness of all control connections. E. Inspect all bolted electrical connections for high resistance using one of the following methods: Use of low-resistance ohmmeter. Verify tightness of accessible bolted electrical connections by calibrated torque-wrench method in accordance with manufacturer's published data. Thermal Imaging inspection Perform manual transfer operation. Verify positive mechanical interlocking between normal and alternate source. 2. Electrical Tests A. Perform a contact-resistance test. B. Perform resistance measurements through all bolted connections with a low resistance ohmmeter. C. Perform insulation-resistance tests, phase to phase and phase-to-ground, with switch in both source positions. D. Verify settings and operation of control devices. E. Calibrate and set all relays and timers in accordance with manufacturer's recommendations. 3. Perform Automatic Transfer Tests: A. Simulate loss of normal power. B. Return to normal power. C. Simulate loss of emergency power. D. Simulate all forms of single-phase conditions. 1. Verify correct operation and timing of the following functions: a. Normal source voltage-sensing relays. b. Engine start sequence. c. Time delay upon transfer. d. Alternate source voltage-sensing relays. e. Automatic transfer operation. f. Interlocks and limit switch function. g. Time delay and retransfer upon normal power restoration. h. Engine cool down and shutdown feature. Infra-Red Scanning: Infra-Red scan all bus plugs, panelboards, motor control centers, and transformers in the Main, Tower and Chiller building s electrical closets and distribution rooms. This work item must be done while the Electrical Power Distribution System is energized. Appropriate safety precautions must be taken before, during and after scanning the system: Use an infra-red scanning camera to detect hot spots in the Electrical Power Distribution System. Objective of this work is to detect any loose, broken, or corroded connections in the system. Problem connections shall be replaced with new connectors, and/or tightened with torque wrench to meet the equipment manufacturers specifications. Arc Flash Study Description / Specifications The contractor shall complete a fault current study and associated flash/shock hazard analysis in accordance with NFPA 70E and Institute of Electrical and Electronics Engineers (IEEE) 1584 to determine the level of electrocution hazards for qualified electricians working on live electrical circuits in the following buildings: Bowling Division: Chiller Building, Main Building, & Tower Building. Sousley Division: Chiller Plant and all other buildings on campus. The goals of this project are to provide flash/shock hazard data (including fault current, flash protection boundary, incident energy and recommended PPE), outline safe work practices for qualified employees, install appropriate flash/shock hazard/PPE signs for VAMC Lexington s high and low voltage equipment to comply with OSHA standards for live work on high and low voltage systems. Acquire the following data for high and low voltage electrical systems. Note that actual data shall be field collected/verified. Best estimates or guesses are NOT acceptable: Utility System - Transformer kVA, Impedance and primary/secondary voltage; Utility Company s anticipated maximum fault current; Type of over-current devices protecting the transformer, if available. Electrical system (wire size, type of wire [e.g. Copper/Aluminum/Copper-Clad Aluminum], number of wires per phase, conduit type [e.g. metallic/non-metallic], length of each run, and over-current device information [Fuses - mfg., cat number, size and class. Circuit breakers -mfg., cat number, size, adjustment settings. System transformers (30kVA and above) - (kVA rating, impedance, primary and secondary voltage. Additionally, the HP, amps and locked rotor current for motors over 20HP may be required). Engineering calculations for fault current and flash/shock hazard data for the system location. 4. Project outputs: The final written report shall include a general outline of the covered electrical systems and components flash/shock hazard data (including fault current), flash protection boundaries, incident energy, the recommended PPE and warning signs for each system location, and recommendations for the reduction of arc hazards, where necessary. Information dealing with any immediate and potentially life-threatening electrical system hazards (covering only the evaluated components) shall be presented in a stand-alone section of the report. Software programs used for report documentation or item tracking will be those typically included in Microsoft Office (such as Word and Excel) AutoCAD, or Adobe. Three hard copies of the completed report are required, along with one electronic copy on CD or DVD. The VA internal trusted network will not be utilized for this work. The Authorization requirements do not apply, and a Security Accreditation Package is not required. Laminated, adhesive-backed flash and shock hazard/PPE signs for each system location will be provided and installed by the contractor. Based on the results of the incident energy study, the contractor shall produce and install a warning label (orange 40 cal/cm2) for each piece of equipment in accordance with ANSI Z535.4-2002. The label must be readable in both indoor and outdoor environments for at least 3 years and contain the following information: Arc hazard boundary (inches) Working distance (inches) Arc flash incident energy at the working distance (calories/ cm2) PPE category and description including the glove rating Voltage rating of the equipment Limited approach distance (inches) Restricted approach distance (inches) Prohibited approach distance (inches) Equipment/bus name Date prepared Supplier name and address VAMC Lexington will aid gathering the data and personnel familiar with, and qualified to interact with, the electrical distribution systems (remove/replace panel covers, etc.). COORDINATION AND SHORT CIRCUIT STUDY This section specifies the requirements of the Electrical System Protective Device Study. A. A short circuit and coordination study shall be prepared for the electrical over current devices to be installed under this project to assure proper equipment and personnel protection. B. The study shall present an organized time current analysis of each protective device in series from the individual device back to the utility and the on-site generator sources. The study shall reflect the operation of each device during normal and abnormal current conditions. SUBMITTALS A. Submit the following: 1. Complete short circuit and coordination study as described herein. 2. Protective equipment shop drawings shall be submitted simultaneously with or after the protective device study. Protective equipment shop drawings will not be accepted prior to protective device study. 3. Certification: Two weeks prior to final inspection, submit four copies of the following to the Resident Engineer: 4.Certification by the Contractor that the protective devices have been adjusted and ...

Closes Nov 30, 2027 · 11:00 AM
Read more →

Lithium Ion Batteries

Department of Defense · W6QK Acc-Apg CONT CT TYAD OFC  |  Tobyhanna, Pennsylvania  |  Posted Nov 4, 2026
Electrical & power systemsSources Sought

THIS IS A SOURCES SOUGHT ONLY - This Sources Sought is issued solely for information and planning purposes - it does not constitute a Request for Proposal (RFP) or a promise to issue an RFP in the future. Responses will be treated as information only and will not be used as a proposal. Solicitations are not available at this time. Requests for a solicitation will not receive a response. This notice does not constitute a commitment by the United States Government to contract for any supply or service whatsoever. All information submitted in response to this announcement is voluntary; the United States Government will not pay for information requested nor will it compensate any respondent for any cost incurred in developing information provided to the United States Government. All information received in response to this sources sought that is marked proprietary will be handled accordingly. Responses to this sources sought that indicate that the information therein is proprietary, or represents confidential business information, will be received, and held in confidence. Not responding to this source sought does not preclude participation in any future RFP, if any is issued. Please note, if a solicitation or multiple solicitations are posted in the future, they will be issued by a separate solicitation. The Government reserves the right to follow up on a one-on-one basis with Sources Sought respondents to gain additional information or clarity about information submitted. The Army Contracting Command (ACC) - Aberdeen Proving Ground (ACC-APG), Tobyhanna Division, is conducting this sources sought in order to identify potential vendors that possess the capabilities to support a requirement for the Lithium Ion Batteries. All details are listed in the Request for Information_Lithium Ion Batteries attached to this Sources Sought. Point of Contact for questions regarding this Sources Sought and all responses: Marissa Brodi, Contract Specialist Email: Marissa.c.brodi.civ@army.mil Complete written responses to this RFI addressing the General Requirement capabilities are to be submitted to the above referenced e-mail address no later than November 13, 2026 @10:00AM EST. Respondents should include the following business information with the Sources Sought response: Company name; Company address; Point of Contact; Telephone Number; E-mail address; Company Cage Code/UEI: Primary NAICS; Business Size; Current Registration in SAM; Web page address. DISCLAIMER �THIS SOURCES SOUGHT IS FOR INFORMATIONAL PURPOSES ONLY. THIS IS NOT A �REQUEST FOR PROPOSAL (RFP)� TO BE SUBMITTED. IT DOES NOT CONSTITUTE A SOLICITATION AND SHALL NOT BE CONSTRUED AS A COMMITMENT BY THE GOVERNMENT. RESPONSES IN ANY FORM ARE NOT OFFERS AND THE GOVERNMENT IS UNDER NO OBLIGATION TO AWARD A CONTRACT AS A RESULT OF THIS ANNOUNCEMENT. NO FUNDS ARE AVAILABLE TO PAY FOR PREPARATION OF RESPONSES TO THIS ANNOUNCEMENT. ANY INFORMATION SUBMITTED BY RESPONDENTS TO THIS TECHNICAL DESCRIPTION IS STRICTLY VOLUNTARY. RESPPONSES WILL NOT BE RETURNED TO THE RESPONDER. NOT RESPONDING TO THIS NOTICE DOES NOT PRECLUDE PARTICIPATION IN ANY FUTURE REQUEST FOR QUOTE (RFQ) OR INVITATION FOR BID (IFB) OR RFP, IF ANY ISSUED. IF A SOLICITATION IS RELEASED, IT WILL BE SYNOPSIZED ON THE GOVERNMENT-WIDE POINT OF ENTRY (GPE). IT IS THE RESPONSIBILITY OF POTENTIAL OFFERORS TO MONITOR THE GPE FOR ADDITIONAL INFORMMATION PERTAINING TO THIS REQUIREMENT.�

Closes Nov 13, 2026 · 10:00 AM ET
Read more →

CABLE ASSEMBLY

Department of Defense · Navsup Weapon Systems Support MECH  |  Not listed  |  Posted Nov 4, 2026
Electrical & power systemsSolicitationSmall Business Set Aside - Total

CONTACT INFORMATION|4|N97113A|FBA|771-229-0509|JOSHUA.D.MARTIN76.CIV@US.NAVY.MIL| ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19|||||||||||||||||||| INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)|2||| GENERAL INFORMATION-FOB-DESTINATION|1|B| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|INVOICE AND RECEIVING REPORT (COMBO)|N/A|TBD|N00104|TBD|TBD|SEE SCHEDULE|TBD|N/A|N/A|TBD|N/A|N/A|N/A|N/A|JOSHUA.D.MARTIN76.CIV@US.NAVY.MIL| NOTE FOR CONTRACTOR/ADMINISTRATIVE CONTRACTING OFFICER|3|||| NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|| NOTICE OF TOTAL SMALL BUSINESS SET-ASIDE (OCT 2020)(DEVIATION 2020-O0008)|1|| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (OCT 2025)|13|||||||||||||| ANNUAL REPRESENTATIONS AND CERTIFICATIONS (MAR 2025)(DEVIATION 2025-O0003 AND2025-O0004))|13|335331|800|||||||||||| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PERPARDENESS, AND ENRGY PROGAM USE (APRIL 2008))|2||X| RFQ closing date has been extended until COB, 10 JUNE 2026. All contractual documents (i.e. contracts, purchase orders, task orders,delivery orders and modifications) related to the instant procurement areconsidered to be ""issued"" by the Government when copies are either depositedin the mail, transmitted by facsimile, or sent by other electrocommercemethods, such as email. The Government's acceptance of the contractor'sproposal constitutes bilateral agreement to ""issue"" contractual documents asdetailed herein. RFQ closing date has been extended until COB, 24 APR 2026. All contractual documents (i.e. contracts, purchase orders, task orders,delivery orders and modifications) related to the instant procurement areconsidered to be ""issued"" by the Government when copies are either depositedin the mail, transmitted by facsimile, or sent by other electrocommercemethods, such as email. The Government's acceptance of the contractor'sproposal constitutes bilateral agreement to ""issue"" contractual documents asdetailed herein. RFQ closing date has been extended until COB, 10 MAR 2026. All contractual documents (i.e. contracts, purchase orders, task orders,delivery orders and modifications) related to the instant procurement areconsidered to be ""issued"" by the Government when copies are either depositedin the mail, transmitted by facsimile, or sent by other electrocommercemethods, such as email. The Government's acceptance of the contractor'sproposal constitutes bilateral agreement to ""issue"" contractual documents asdetailed herein. TO VIEW THE DRAWINGS: Go to www.https://www.sam.gov Click: Contract Opportunities and enter the solicitation number. This gives you access to the Electronic Solicitation. Drawings can be viewed or downloaded. GOVERNMENT SOURCE INSPECTION per FAR 52.246-2 IS REQUIRED. DELIVERY_______________DAYS. All contractual documents (i.e. contracts, purchase orders, task orders,delivery orders and modifications) related to the instant procurement areconsidered to be "issued" by the Government when copies are either deposited in the mail, transmitted by facsimile, or sent by other electronic commercemethods, such as email. The Government's acceptance of the contractor'sproposal constitutes bilateral agreement to "issue" contractual documents asdetailed herein. 1. SCOPE 1.1 This contract/purchase order contains the requirements for manufacture of the CABLE ASSEMBLY . 2. APPLICABLE DOCUMENTS 2.1 Applicable Documents - The document(s) listed below form a part of this contract/purchase order including modifications or exclusions. 2.1.1 Documents, drawings, and publications supplied are listed under "Drawing Number". These items should be retained until an award is made. 2.1.2 "Document References" listed below must be obtained by the Contractor. Ordering information is included as an attachment to this contract/purchase order. 2.1.3 The "Document Changes" section provides supersessions/changes to referenced documents. 2.2 Order of Precedence - In the event of a conflict between the text of this contract/purchase order and the references and/or drawings cited herein, the drawings shall take precedence. Nothing in this contract/purchase order, however, shall supersede applicable laws and regulations unless a specific exemption has been obtained. DRAWING DATA=2674051 |10001| D| |D| | | | DRAWING DATA=2825437 |10001| C|DW |D| | | | DRAWING DATA=7123520 |53711|AF| |D| | | | DRAWING DATA=7123838 |53711| B| |D| | | | DRAWING DATA=7138634 |53711| A|DW |D| | | | 3. REQUIREMENTS 3.1 Manufacturing and Design - The CABLE ASSEMBLY furnished under this contract/purchase order shall meet the material and physical requirements as specified ;ON DRAWING 7138634-2 (53711) REV A; . 3.2 Marking - Unless marking requirements are specified by a document or drawing cited in this solicitation all items delivered under this contract/purchase order shall be marked and identified in accordance with the applicable Military Standards and Specifications as follows: Mechanical Parts, Assemblies and Equipments - MIL-STD-130 Electrical and Electronic Parts - MIL-STD-1285, Method 1. Electrical and Electronic Parts and Assemblies not covered by MIL-STD-1285-use MIL-STD-130. Electronic Equipment - MIL-STD-454 Requirement Number 67. Electrical Equipment - MIL-P-15024/5 (SHIPS) 3.3 Configuration Control - MIL-STD-973 entitled "Configuration Management", Paragraph 5.4.8, Configuration Control (Short Form Procedure), is hereby incorporated. The Contractor shall submit all Engineering Change Proposals in accordance with MIL-STD-973, Paragraph 5.4.8.2 and Appendix D. Requests for Deviations shall be processed in accordance with MIL-STD-973, Paragraph 5.4.8.3 and Appendix E. Requests for Waivers shall be processed in accordance with MIL-STD-973, Paragraph 5.4.8.4 and Appendix E. (Original and two copies shall be submitted to Contracting Officer, NAVICP-MECH, P. O. Box 2020, Mechanicsburg Pa. 17055-0788.) 4. QUALITY ASSURANCE 4.1 Responsibility for Inspection - Unless otherwise specified in the contract/purchase order, the Contractor is responsible for the performance of all inspection requirements as specified herein. Except as otherwise specified in the contract/purchase order, the Contractor may use his own or any other facilities suitable for the performance of the inspection requirements specified herein, unless disapproved by the Government. The Government reserves the right to perform any of the inspections set forth in the specification where such inspections are deemed necessary to assure supplies and services conform to prescribed requirements. 4.2 Responsibility for Compliance - All items must meet all requirements of this contract/purchase order. The inspection set forth in this specification shall become a part of the Contractor's overall inspection system or quality program. The absence of any inspection requirements shall not relieve the Contractor of the responsibility of assuring that all products or supplies submitted to the Government for acceptance comply with all requirements of the contract/purchase order. Sampling in quality conformance does not authorize submission of known defective material, either indicated or actual, not does it commit the Government to acceptance of defective material. 4.3 Records - Records of all inspection work by the Contractor shall be kept complete and available to the Government during the performance of contract/purchase order and for a period of 365 calendar days after final delivery of supplies. 5. PACKAGING 5.1 Preservation, Packaging, Packing and Marking - Preservation, Packaging, Packing and Marking shall be in accordance with the Contract/Purchase Order Schedule and as specified below. MIL-STD 2073 PACKAGING APPLIES AS FOUND ELSEWHERE IN THE SCHEDULE 6. NOTES 6.1 Ordering Information for Document References - The Department of Defense Single Stock Point (DODSSP), Website http://www.dsp.dla.mil/, provides product information for the Department Of Defense Index Of Specifications and Standards (DODISS) (i.e.Military/Federal Specifications and Standards), Data Item Descriptions (DIDs), and other DODSSP Products. If you have a problem connecting to the DODSSP Website, please contact either the Subscription Service Desk (215)697-2569, or the Special Assistance Desk (215)697-2667. The DODSSP Customer Service Staff is available every business day between the hours of 7:30 AM and 4:00 PM Eastern Time to answer your questions or assist in solving any problems you might encounter when ordering from the DODSSP collection of Defense specifications and standards, Federal specifications and standards used by DOD, and other DOD standardization documents. Mail requests should be submitted to: Navy Publishing and Printing Service (Subscriptions) Building 4D 700 Robbins Ave. Phildelphia, Pa. 19111 Attn: DODSSP Requests can be transmitted to DODSSP via FAX number (215)697-1462. A. Availability of Cancelled Documents - The DODSSP offers cancelled documents that are required by private industry in fulfillment of contractual obligations in paper format. Documents can be requested by phoning the Subscription Services Desk. B. Commercial Specifications, Standards, and Descriptions - These specifications, standards and descriptions are not available from Government sources. They may be obtained from the publishers of the applicable societies. C. Ordnance Standards (OS), Weapons Specifications (WS), and NAVORD OSTD 600 Pages - These type publications may be obtained by submitting a request to: Commander, Indian Head Division, Naval Surface Warfare Center Code 8410P, 101 Strauss Avenue Indian Head, MD 20640-5035 D. Ordnance Documents (OD) - Ordnance Documents may be obtained by submitting a request to: Commanding Officer Naval Surface Warfare Center Port Hueneme Div Code 5A00 Port Hueneme, California 93043 E. On post-award actions, requests for "Official Use Only" and "NOFORN" (Not Releasable To Foreign Nationals) documents must identify the Government Contract Number, and must be submitted via the cognizant Defense Contract Management Command (DCMC) for certification of need for the document. On pre-award actions such requests must be submitted to the PCO for certification of need for the document. F. NOFORN Military Specifications and Standards (including Amendments, Change Notices and Supplements, but NOT interim Changes) to be ordered from: Contracting Officer NAVICP-MECH Code 87321 5450 Carlisle Pike P.O. Box 2020 Mechanicsburg, Pa. 17055-0788 G. Nuclear Reactor Publications Assigned NAVSEA Documents and Identification Numbers (i.e. NAVSEA Welding Standard, NAVSEA 250-1500-1) are to be ordered from: Commanding Officer NAVICP-MECH Code 009 5450 Carlisle Pike P.O. Box 2020 Mechanicsburg, Pa. 17055-0788 H. Technical Manuals Assigned NAVSEA Identification Numbers (i.e. NAVSEA Welding And Brazing Procedure, NAVSEA S9074-AQ-GIB-010/248) are to be ordered from: Naval Inventory Control Point Code 1 Support Branch 700 Robbins Avenue Phildelphia, Pa. 19111-5094 I. Interim Changes and Classified Specifications shall be obtained by submitting a request on DD Form 1425 to NAVICP-MECH. 6.2 Ordinance Document (OD) Controlled Items - Award for an item will be made only to the vendor(s) listed on ;OD36190; . A substitute item is not authorized without prior testing and approval. Contractors are cautioned that award of this contract/purchase order will not be delayed solely for the purpose of approving additional sources. Contractors desiring to provide a substitute item are urged to contact the Government PCO to arrange for testing and, if approved, added to the OD as an approved source of supply for subsequent procurements. ON DRAWING 7138634-2 (53711) REV A

Closes Nov 13, 2026 · 4:30 PM ET
Read more →

SLIDE ASSY,CHASSIS

Department of Defense · DLA Aviation AT Philadelphia, PA  |  Not listed  |  Posted Nov 4, 2026
Electrical & power systemsSolicitation

ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19|||||||||||||||||||| INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)|2||| HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT|8|||X|AS/EN/JISQ 9100 or equivalent||||| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|Invoice and Receiving Report (Combo)|INVOICE 2 IN 1 |TBD|SPRPA1|TBD|TBD|SEE SCHEDULE |TBD|TBD|TBD|TBD|TBD||||| NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|| MANDATORY USE OF WORKFLOW PRO (WFP) MOD ASSIST MODULE|1|Robyn Grinarml| VALUE ENGINEERING (JUN 2020)|3|||| INTEGRITY OF UNIT PRICES (NOV 2021)|1|| EQUAL OPPORTUNITY FOR VETERANS (DEV 2026-O0040)(FEB 2026)|4||||| WARRANTY OF SUPPLIES OF A NONCOMPLEX NATURE (JUN 2003)|6|12 MONTHS |45 DAYS AFTER DISCOVERY OF DEFECT||||| EQUAL OPPORTUITY FOR WORKERS WITH DISABILITIES (DEV 2026-O0040)(FEB 2026)|4||||| TRANSPORTATION OF SUPPLIES BY SEA (OCT 2024)|2||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM-BASIC (FEB 2024)|11|||||||||||| ESTIMATE OF PERCENTAGE OF RECOVERED MATERIAL CONTENT FOR EPA DESIGNATED PRODUCTS (MAY 2008))|1|| SECURITY PROHIBITIONS AND EXCLUSIONS (CLASS DEVIATION 2026-O0025)(FEB 2026)|7|||||||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024))|5|||||| BUY AMERICAN--BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024)|1|| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (DEVIATION 2026-O0043)(FEB 2026))|13|||||||||||||| ROYALTY INFORMATION (APR 1984)|1|| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PREPAREDNESS, ANDENERGY PROGRAM USE (APR 2008))|2||X| This solicitation is being solicited under Emergency Acquisition Flexibilities (EAF) Authority formally known as Special Emergency Procurement Authority (SEPA). No drawings are available for this Request for Quote. All potential offers shall provide newly manufactured spares only.Refurbished, remanufactured, or repaired material will not be acceptable;Offers for such are ineligible for award. THIS IS A CRITICAL APPLICATION ITEM (CAI) \

Closes Nov 16, 2026 · 4:30 PM ET
Read more →

RADOME,SECTION

Department of Defense · DLA Aviation AT Philadelphia, PA  |  Not listed  |  Posted Nov 4, 2026
Electrical & power systemsSolicitation

ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19|||||||||||||||||||| HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT|8|||x|ISO 90001 or equivalent||||| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|Invoice and Receiving Report (combo) type|N/A|TBD|SPRPA1|TBD|TBD|See Schedule|TBD|N/A|N/A|TBD|N/A|N/A|N/A|N/A|N/A| MANDATORY USE OF WORKFLOW PRO (WFP) MOD ASSIST MODULE|1|robyn.grinarml@dla.mil| EQUAL OPPORTUNITY FOR VETERANS (DEV 2026-O0040)(FEB 2026)|4||||| EQUAL OPPORTUITY FOR WORKERS WITH DISABILITIES (DEV 2026-O0040)(FEB 2026)|4||||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM-BASIC (FEB 2024)|11|||||||||||| ESTIMATE OF PERCENTAGE OF RECOVERED MATERIAL CONTENT FOR EPA DESIGNATED PRODUCTS (MAY 2008))|1|| SECURITY PROHIBITIONS AND EXCLUSIONS (CLASS DEVIATION 2026-O0025)(FEB 2026)|7|||||||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024))|5|||||| BUY AMERICAN--BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024)|1|| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (DEVIATION 2026-O0043)(FEB 2026))|13|||||||||||||| ROYALTY INFORMATION (APR 1984)|1|| REQUIREMENTS FOR SUBMISSION OF PROPOSALS VIA ELECTRONIC MEDIA (JAN 2018)|1|Electronic Mail| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PREPAREDNESS, ANDENERGY PROGRAM USE (APR 2008))|2||x| No drawings are available for this Request for Quotation. This Solicitation is being issued under Emergency Acquisition Flexibilities(EAF) formally known as SEPA. \

Closes Nov 16, 2026 · 4:30 PM ET
Read more →

RADOME B387

Department of Defense · DLA Aviation AT Philadelphia, PA  |  Not listed  |  Posted Nov 4, 2026
Electrical & power systemsSolicitation

ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19|||||||||||||||||||| INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)|2||| HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT|8|||x|ISO 9001 or Equivalent||||| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|Invoice and Receiving Report (combo) type|N/A|TBD|SPRPA1|TBD|TBD|See Chedule|TBD|N/A|N/A|TBD|N/A|N/A|N/A|N/A|N/A| MANDATORY USE OF WORKFLOW PRO (WFP) MOD ASSIST MODULE|1|robyn.grinarml@dla.mil| VALUE ENGINEERING (JUN 2020)|3|||| INTEGRITY OF UNIT PRICES (NOV 2021)|1|| EQUAL OPPORTUNITY FOR VETERANS (DEV 2026-O0040)(FEB 2026)|4||||| EQUAL OPPORTUITY FOR WORKERS WITH DISABILITIES (DEV 2026-O0040)(FEB 2026)|4||||| TRANSPORTATION OF SUPPLIES BY SEA (OCT 2024)|2||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM-BASIC (FEB 2024)|11|||||||||||| SECURITY PROHIBITIONS AND EXCLUSIONS (CLASS DEVIATION 2026-O0025)(FEB 2026)|7|||||||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024))|5|||||| BUY AMERICAN--BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024)|1|| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (DEVIATION 2026-O0043)(FEB 2026))|13|||||||||||||| ROYALTY INFORMATION (APR 1984)|1|| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PREPAREDNESS, ANDENERGY PROGRAM USE (APR 2008))|2||x| No drawings are available for this Request for Quotation. This Solicitation is being issued under Emergency Acquisition Flexibilities(EAF) formally known as SEPA. \

Closes Nov 16, 2026 · 4:30 PM ET
Read more →

SWITCH ASSEMBLY

Department of Defense · DLA Weapons Support  |  Not listed  |  Posted Nov 4, 2026
Electrical & power systemsCombined Synopsis/Solicitation

Proposed procurement for NSN 5930014924255 SWITCH ASSEMBLY: Line 0001 Qty 4 UI EA Deliver To: DLA DISTRIBUTION DEPOT OKLAHOMA By: 0446 DAYS ADO This is a source controlled drawing item. Approved source is 81590 23748-002. The solicitation is an RFQ and will be available at the link provided in this notice. Hard copies of this solicitation are not available. The items furnished must meet the requirements of the drawing cited in the solicitation. Digitized drawings and Military Specifications and Standards may be retrieved, or ordered, electronically. All responsible sources may submit a quote which, if timely received, shall be considered. Quotes must be submitted electronically.

Closes Nov 16, 2026
Read more →

SWITCH,PRESSURE

Department of Defense · DLA Weapons Support  |  Not listed  |  Posted Nov 4, 2026
Electrical & power systemsCombined Synopsis/Solicitation

Proposed procurement for NSN 5930012818457 SWITCH,PRESSURE: Line 0001 Qty 182 UI EA Deliver To: DLA DISTRIBUTION DEPOT HILL By: 0303 DAYS ADO Approved sources are 02750 211C223-295; 0DGU2 500V046-4; 14314 P6P-35; 55723 2342-81; 58918 GPP1255. The solicitation is an RFQ and will be available at the link provided in this notice. Hard copies of this solicitation are not available. Specifications, plans, or drawings are not available. All responsible sources may submit a quote which, if timely received, shall be considered. Quotes must be submitted electronically.

Closes Nov 16, 2026
Read more →

HANDLE,ATOMIZER

Department of Defense · DLA Weapons Support  |  Not listed  |  Posted Nov 4, 2026
Electrical & power systemsCombined Synopsis/SolicitationSmall Business Set Aside - Total

Proposed procurement for NSN 5930012282099 HANDLE,ATOMIZER: Line 0001 Qty 3 UI EA Deliver To: W1A8 DLA DIST SAN JOAQUIN By: 0147 DAYS ADO Approved source is 31923 H-01-02-0124. The solicitation is an RFQ and will be available at the link provided in this notice. Hard copies of this solicitation are not available. Specifications, plans, or drawings are not available. All responsible sources may submit a quote which, if timely received, shall be considered. Quotes must be submitted electronically.

Closes Nov 16, 2026
Read more →

SWITCH,TOGGLE

Department of Defense · DLA Weapons Support  |  Not listed  |  Posted Nov 4, 2026
Electrical & power systemsCombined Synopsis/SolicitationSmall Business Set Aside - Total

Proposed procurement for NSN 5930011758343 SWITCH,TOGGLE: Line 0001 Qty 23 UI EA Deliver To: DLA DISTRIBUTION DEPOT HILL By: 0416 DAYS ADO Approved sources are 81755 C8813-4; 91929 27ET119-T-E. The solicitation is an RFQ and will be available at the link provided in this notice. Hard copies of this solicitation are not available. Specifications, plans, or drawings are not available. All responsible sources may submit a quote which, if timely received, shall be considered. Quotes must be submitted electronically.

Closes Nov 16, 2026
Read more →

SWITCH,TOGGLE

Department of Defense · DLA Weapons Support  |  Not listed  |  Posted Nov 4, 2026
Electrical & power systemsCombined Synopsis/Solicitation

Proposed procurement for NSN 5930011969432 SWITCH,TOGGLE: Line 0001 Qty 10 UI EA Deliver To: W1A8 DLA DIST SAN JOAQUIN By: 0221 DAYS ADO Approved sources are 81579 407-4310; 81755 C10902-1. The solicitation is an RFQ and will be available at the link provided in this notice. Hard copies of this solicitation are not available. Specifications, plans, or drawings are not available. All responsible sources may submit a quote which, if timely received, shall be considered. Quotes must be submitted electronically.

Closes Nov 16, 2026
Read more →

SWITCH,SENSITIVE

Department of Defense · DLA Weapons Support  |  Not listed  |  Posted Nov 4, 2026
Electrical & power systemsCombined Synopsis/SolicitationHistorically Underutilized Business (HUBZone) Set-Aside (FAR 19.13)

Proposed procurement for NSN 5930008134018 SWITCH,SENSITIVE: Line 0001 Qty 27 UI EA Deliver To: W1A8 DLA DIST SAN JOAQUIN By: 0264 DAYS ADO Approved sources are 02005 61162; 98897 613468-3. The solicitation is an RFQ and will be available at the link provided in this notice. Hard copies of this solicitation are not available. Specifications, plans, or drawings are not available. All responsible sources may submit a quote which, if timely received, shall be considered. Quotes must be submitted electronically.

Closes Nov 16, 2026
Read more →

SWITCH,TOGGLE

Department of Defense · DLA Weapons Support  |  Not listed  |  Posted Nov 4, 2026
Electrical & power systemsCombined Synopsis/SolicitationSmall Business Set Aside - Total

Proposed procurement for NSN 5930010502152 SWITCH,TOGGLE: Line 0001 Qty 35 UI EA Deliver To: DLA DISTRIBUTION DEPOT HILL By: 0733 DAYS ADO Line 0002 Qty 1 UI EA Deliver To: DLA DISTRIBUTION DEPOT HILL By: 0120 DAYS ADO All responsible sources may submit a quote which, if timely received, shall be considered. Quotes must be submitted electronically.

Closes Nov 16, 2026
Read more →

HEADSET,ELECTRICAL

Department of Defense · DLA Weapons Support  |  Not listed  |  Posted Nov 4, 2026
Electrical & power systemsCombined Synopsis/Solicitation

Proposed procurement for NSN 5965226282024 HEADSET,ELECTRICAL: Line 0001 Qty 459 UI EA Deliver To: W1A8 DLA DISTRIBUTION By: 0189 DAYS ADO Approved source is R0567 839120-002. The solicitation is an RFQ and will be available at the link provided in this notice. Hard copies of this solicitation are not available. Specifications, plans, or drawings are not available. All responsible sources may submit a quote which, if timely received, shall be considered. Quotes must be submitted electronically.

Closes Nov 16, 2026
Read more →

RADOME

Department of Defense · DLA Weapons Support  |  Not listed  |  Posted Nov 4, 2026
Electrical & power systemsCombined Synopsis/SolicitationSmall Business Set Aside - Total

Proposed procurement for NSN 5985017055663 RADOME: Line 0001 Qty 2 UI EA Deliver To: W1A8 DLA DIST SAN JOAQUIN By: 0219 DAYS ADO This is a source controlled drawing item. Approved sources are 33747 327406-1; 87G32 327406-1. The solicitation is an RFQ and will be available at the link provided in this notice. Hard copies of this solicitation are not available. The items furnished must meet the requirements of the drawing cited in the solicitation. Digitized drawings and Military Specifications and Standards may be retrieved, or ordered, electronically. All responsible sources may submit a quote which, if timely received, shall be considered. Quotes must be submitted electronically.

Closes Nov 16, 2026
Read more →

CONNECTOR ASSEMBLY,ELE

Department of Defense · DLA Weapons Support  |  Not listed  |  Posted Nov 4, 2026
Electrical & power systemsCombined Synopsis/SolicitationSmall Business Set Aside - Total

Proposed procurement for NSN 5935016417301 CONNECTOR ASSEMBLY,ELE: Line 0001 Qty 8 UI EA Deliver To: W1A8 DLA DISTRIBUTION By: 0206 DAYS ADO The solicitation is an RFQ and will be available at the link provided in this notice. Hard copies of this solicitation are not available. Digitized drawings and Military Specifications and Standards may be retrieved, or ordered, electronically. All responsible sources may submit a quote which, if timely received, shall be considered. Quotes must be submitted electronically.

Closes Nov 16, 2026
Read more →

CIRCUIT BREAKER

Department of Defense · DLA Weapons Support  |  Not listed  |  Posted Nov 4, 2026
Electrical & power systemsCombined Synopsis/SolicitationSmall Business Set Aside - Total

Proposed procurement for NSN 5925123287275 CIRCUIT BREAKER: Line 0001 Qty 417 UI EA Deliver To: W1A8 DLA DISTRIBUTION By: 0237 DAYS ADO Approved sources are D8885 452-K14-LN2-80A; D8885 452-K34-LN2-80A. The solicitation is an RFQ and will be available at the link provided in this notice. Hard copies of this solicitation are not available. Specifications, plans, or drawings are not available. All responsible sources may submit a quote which, if timely received, shall be considered. Quotes must be submitted electronically.

Closes Nov 16, 2026
Read more →
← NewerPage 28 of 33Older →
Scroll to Top