Construction — open bids
557 open bids, newest first. Full details live here — you only leave for the official posting when you bid.
Weatherproofing Units
To address facility workspace capacity requirements at Naval Base Ventura County, forty-one (41) wood-framed modular workspace units have been procured and will ultimately be assembled within a designated facility structure. The modules are currently stored outdoors in designated staging areas pending final installation. This requirement is for the procurement, delivery, and on-site assembly of heavy-duty, non-chemical weatherproofing systems to protect the modular units from environmental degradation during temporary outdoor storage, including rain, wind, ultraviolet exposure, and marine moisture in a coastal environment. The required system is a complete turnkey weatherproofing solution for forty-one (41) stored modular units consisting of thirty (30) 12 feet x 36 feet units and eleven (11) 12 feet x 16 feet units. The system must be custom-fitted on-site and provide durable, tightly secured, weather-resistant protection from the bottom chassis to the roofline, while excluding the bottom 3-foot poly stilts from coverage. Individual wrapping is the standard approach; however, grouped wrapping of adjacent modules may be considered where site conditions or unit spacing make individual wrapping impracticable, provided the same level of protection and performance is maintained. Functionally, the weatherproofing system supports preservation of the modular units structural condition and serviceability during long-term outdoor storage until installation. The system must be suitable for coastal outdoor exposure, resist UV degradation and salt-spray weathering, withstand high-wind conditions in accordance with manufacturer-approved installation guidance, and avoid damage to the modular units through unapproved penetrating attachment methods. The requirement also includes full surface preparation, precision fitting and sealing, quality assurance verification, and recurring maintenance inspections every sixty (60) to ninety (90) days for twelve (12) months after acceptance to ensure continued weather-tightness and identify any moisture intrusion or system degradation.
Robins RAPID Construction OTA Progressive Design Build Fiber Replacement
FA8501-27-RAPID-CIRCUIT F1-170129-OTA Under the RAPID Umbrella Framework: RAPID Progressive Design-Build to Replace Circuit F-01 from Fowler Substation UHHZ170129 Description The Department of the Air Force, 78th Civil Engineer Group, Robins Air Force Base, Georgia, is issuing this Special Notice under the Robins Agile Practices for Infrastructure Development (RAPID) umbrella framework and pursuant to 10 U.S.C. � 2808a. The Government seeks industry Solution Briefs for an anticipated Other Transaction Agreement (OTA) to Replace Circuit F-01 from Fowler Substation at Robins AFB, GA. The requirement includes replacement of all 15kV, 500MCM cable throughout circuit F-01. This will include replacement and removal all broken breakers or bad cable racks, install new bell ends on conduits, and pump water/dirt from manholes. This Special Notice is not an invitation for bids, a request for proposals under the Federal Acquisition Regulation, nor a commitment by the Government to make an award. Any resulting instrument will be an OTA for facility construction and repair under 10 U.S.C. � 2808a. Purpose The purpose of this Area of Interest is to obtain commercially viable, safe, and schedule-credible solutions to design plans for and to perform the replacement of expired high-risk Circuit F01 cabling in order to prevent operational risk, mission delays, and compounding economic costs due to infrastructure failure at Robins Air Force Base, Georgia. The Government requires an integrated approach to address the design, removal of deteriorated cables and replacement with new cable in The Fowler Substation. The selected approach must provide a practical path to execute the work while minimizing disruption to aircraft operations and controlling construction, safety, environmental, and schedule risks. Project Background and Existing Conditions Circuit F-01 has surpassed its operational lifecycle, creating a high-probability risk for catastrophic failure. If the remaining aged portion is not replaced, the installation faces risk of emergency repair premiums and disruption to sustaining airfield infrastructure, supporting safe aircraft movement, installation readiness, and continued mission operations. The work area is slightly congested and impacted by various airfield operations. The Fowler Substation Circuit F-01 will remain in full operation during the entire duration of the project by back feeding with circuit ties. Project Areas Phase 1 (Preconstruction & Collaborative Design): Collaborative design development stakeholders to achieve 65%, site surveys, risk mitigation planning, schedule and establishment of an open-book Guaranteed Maximum Price (GMP) IAW with all other aspects of the SOO. Phase 2 (Final Design & Construction Execution) Completion of final design and full construction execution (exercised upon agreement). Safely construct the facility/project within the agreed GMP and schedule. Assume hazardous materials exist. Address requirements for worker notification, abatement, and disposal. Employ a safety and health professional to provide a HASP per DoDI 6055.01. Comply with Robins Environmental Requirements (Section 01560) submitting Waste Management Report/Landfill Waste Tickets, Solid Waste Disposal Plan, and Qualified Recycling Program (QRP). Appropriately coordinate Stormwater & Erosion Control. Structure execution to allow for payable milestones payments, as well as all other aspects outlined in the SOO. Project-Specific Objectives and Phasing Replace all 15kV, 500MCM cable throughout the distribution of circuit F-01 in its entirety of multiple different installation facilities, while remaining in full operation besides outages and removing and replacing all broken breakers or bad cable racks, install new bell ends on conduits, and pump water/dirt from manholes. Address specific phasing to accommodate congested areas. OTA & RAPID Framework Approach This project is being executed as an Area of Interest (AOI) under the overarching RAPID (Robins Agile Practices for Infrastructure Development) Umbrella Program Notice. In accordance with the RAPID framework, this project utilizes a Progressive Design-Build approach under the standalone statutory authority of 10 U.S.C. � 2808a. The Government will be expecting a 100% completed design package and/or specific phasing and repair requirements followed by the completion of the construction or performance of the designed actions. Competitive Selection Process Phase 1 Solution Brief Requirements The Government reserves the right, at its sole discretion, to determine that a response which does not conform to the requirements or instructions contained in this announcement is ineligible for further consideration. Interested respondents shall submit a Phase 1 Solution Brief in a clear, concise, and organized manner in accordance with this announcement. To facilitate an efficient review, responses shall be prepared in accordance with the instructions and formatting requirements contained in this announcement. Failure to comply with these requirements may increase the risk that the response will not be considered for further evaluation. The Government will evaluate them to identify the most highly qualified parties. Submission Requirement should be submitted by 3:00 PM Eastern Standard Time on or before 20 November 2026. Interested respondents shall submit a Phase 1 Solution Brief consisting of no more than five written pages (5), excluding the cover page. Email is the official form of submission for responses. Surety letters may be attached without counting towards 5 page limit. Page format should be 8.5 x 11. The Solution Brief shall include: Cover Page Company name UEI Mailing address Primary point of contact Email address and telephone number Identification of this RAPID AOI Executive Summary, Team Composition, and Organization Summary of the respondent�s qualifications and anticipated delivery capability Explanation of why the team is qualified for the anticipated requirement The team�s understanding of the Robins Air Force Base operational environment The team�s experience working in occupied facilities, congested site logistics, complex mechanical/electrical system integrations, and adherence to stringent environmental and safety standards. (e.g., hazardous material abatement, and experience with Department of War/Air Force Standards). The team�s proposed approach to Phase 1 collaboration and risk reduction Identification of any material capability, staffing, access, bonding, or teaming assumptions. Past Relevant Construction Capability and Experience Minimum Requirement: The Company must demonstrate a minimum of five (5) years of experience successfully executing construction projects of comparable size, scope, and complexity. Focus: Historical performance in occupied facilities, managing congested site logistics, complex mechanical/electrical system integrations, adhering to environmental and safety standards.(e.g., hazardous material abatement, and experience with Department of Defense/Air Force Standards). Note that while DoD experience is considered, it will not be a deciding factor in determining a firm more qualified. Financial Capacity and Bonding A statement of financial capacity to perform the anticipated work Current single-project and aggregate bonding capacity, if bonds are anticipated; Name of surety Any other information necessary to demonstrate capacity to perform the anticipated project. Construction Execution and Phasing Approach Methodology for physical work execution Utility outage coordination Evaluation & Selection Criteria The Government will utilize a two-step, Qualifications-Based Selection (QBS) process mapped to the RAPID framework to select the Design-Builder. In accordance with PDB methodology, price will not be evaluated during the initial selection process. Selection is based on qualifications, experience, and collaborative capabilities. Step 1: RAPID Phase 1 Equivalent Evaluation of written Solution Brief to establish a short-list of the most highly qualified firms. Price is not evaluated in Step 1. Step 2: RAPID Phases 2 Equivalent Interactive Pitch Presentations/Interviews and evaluation of the Phase 1 PDB Price Proposal (short-listed teams only) to determine the final best-value selection. Step 1: Statement of Qualifications Evaluation Factors Factor 1: Past Relevant Experience Minimum Requirement: The Design-Builder (and/or key teaming partner) must demonstrate a minimum of five (5) years of experience successfully executing construction projects of comparable size, scope, and complexity. Focus: Historical performance in occupied facilities, managing congested site logistics, complex mechanical/electrical system integrations, and adherence to stringent environmental and safety standards (e.g., hazardous materials abatement, and experience with Department of War/Air Force Standards). Note: while DoW experience is considered, it will not be a deciding factor in determining a firm more qualified. Factor 2: Team Composition and Organization Focus: The government will evaluate the proposed organization structure, the integration of design and construction personnel from project inception, and the qualifications of Key Personnel. This includes assessing the proposed site superintendent/project managers ability to oversee operations and coordinate with the Government daily. Factor 3: Project Approach and Understanding Focus: The Government will assess the firm�s understanding of the PDB OTA process and their proposed approach to executing Phase 1 (Design and Preconstruction) and Phase 2 (Final Design & Construction). This includes the firm�s strategy for open-book estimating, schedule development, and manage site-specific constraints at Robins AFB (e.g. restricted area access, flightline requirements, and utility outage coordination). Step 2: Pitch Presentation and Price Evaluation (Final Down-Select) The Government may invite selected respondents to participate in an oral presentation or pitch. Phase 2 may assess the respondent�s technical approach, constructability, airfield-operational integration, phasing, site logistics, safety, environmental approach, risk management, collaboration capability, and preliminary schedule approach. Specific instructions will be provided with invitation to the pitch day. Factor 1: Collaborative Capability and Cultural Fit Focus: Ability to work in a transparent, �open-book� partnership with the 78 CEG Project Delivery Team (PDT) and Base stakeholders. Factor 2: Real-Time Problem-Solving and Risk Management Focus: Capacity to identify, analyze, and mitigate complex project risks. Evaluated based on response to real-time scenarios presented during the Q&A. Factor 3: Innovative Design-Build Solutions Focus: Creative, value-driven, and cost effective courses of action (COAs) proposed to meet the Government�s mission objectives. Factor 4: Financial Capacity and Bonding Focus: Demonstrated financial capacity to support the anticipated project magnitude and, if required by the final OTA, sufficient bonding capacity. Focus: The estimated magnitude of construction associated with this Area of Interest (AOI) is $5M to $10M. This range is provided for planning purposes only and does not constitute an explicit funding guarantee or disclose the Independent Government Estimate. This range is provided to assist interested offerors in determining the necessary single-project and aggregate bonding capacity required to support the subsequent construction agreement. Final Selection and Award Upon concluding presentations, the evaluation team will select the single most highly qualified Design-Builder. The Government will invite the selection firm to negotiate terms, Scope of Services, and a design/preconstruction fee for the Phase 1 OTA Agreement. The Government will address the applicability of Davis-Bacon, prevailing-wage, and other labor requirements during the Pitch phase or before award; any requirements determined applicable will be incorporated into the resulting OTA. Government Reservations The Government reserves the right to: Invite, not invite, or limit respondents advancing to later phases; Conduct technical exchanges; Request clarifications or supplemental information; Negotiate with one or more respondents; Modify, suspend, or cancel this Special Notice; Issue additional notices or requests; and Make no award. Attachments UHHZ170129 - 01005 - SOO - PDB with OTHER TRANSACTIONAL AUTHORITY F1 Binder UHHZ170129 REV 22-02 base power grid F1 REV 22-02 base power grid 0111 REV 22-02 base power grid-Model F1 compact Send all submissions to: angela.whitley@us.af.mil and kristen.denlinger@us.af.mil Notice of Expanded Opportunity, Follow-On Awards, and Multi-Base Utilization; While the immediate requirement under this AOI is to Replace Circuit F-01 from Fowler Substation at Robins AFB, GA, offerors are advised that participation and successful evaluations under this AOI may provide significant strategic opportunities beyond the initial project.
Stated in the notice: Focus: The estimated magnitude of construction associated with this Area of Interest (AOI) is $5M to $10M.
460-26-999 | Condenser Water Piping Modification
36C24427B0003 460-26-999 Condenser Water Piping Modification
FCC Allenwood - Repair Ground & Elevated Water Tanks - FCC
THIS IS A SOURCES SOUGHT NOTICE. THIS NOTICE IS ISSUED FOR MARKET RESEARCH PURPOSES ONLY. THIS IS NOT A SOLICITATION OR INVITATION FOR OFFERORS TO SUBMIT PROPOSALS. A PRE-SOLICITATION SYNOPSIS OF PROPOSED CONTRACT ACTION WILL BE POSTED AT A LATER DATE THAT WILL PROVIDE INSTRUCTIONS FOR OFFERERS TO RESPOND TO THIS OPPORTUNITY. PLEASE DO NOT RESPOND TO THIS NOTICE IF YOU ARE NOT SERIOUSLY INTERESTED AND IF YOU DO NOT PERFORM THIS REQUIREMENT. IT WILL DELAY THE POSTING OF THE SOLICITATION DUE TO FURTHER MARKET RESEARCH THAT WILL BE REQUIRED. Interested small business contractors are requested to respond to this notice by filling out and emailing completed questionnaire attachment (see attached) to Kevin Slone at kslone@bop.gov. Responses must be received no later than November 20, 2026. Interested vendors must also add their names to the Interested Vendors List for this posting in https://sam.gov Contract Opportunity (must be logged-in to your account). The Federal Bureau of Prisons (FBOP) anticipates the need for a firm-fixed-price construction contract for a project entitled Repair Ground & Elevated Water Tanks - FCC, at the Federal Correctional Complex (FCC) Allenwood, located in Allenwood, Pennsylvania. FCC Allenwood is federally owned facility located at Route 15, 2 Mi. N. of Allenwood, Allenwood, PA 17810. The project consists of the following: The Federal Bureau of Prisons (FBOP), Federal Correctional Complex (FCC) Allenwood, intends to make a single award to a responsible entity that will provide all necessary equipment, labor, materials, and incidentals necessary to repair the (2) Water Storage Tanks. The work is required to restore structural stability, prevent deterioration. All work shall be performed in accordance with applicable federal, state, and local codes, Bureau of Prisons (BOP) policies, and recognized industry standards for structural concrete repair. See the Statement of Work/Specifications attachment for the complete requirements for the project. Access to the specifications and drawings attachments will require an active https://sam.gov vendor registration (log in). If you encounter problems accessing these documents, please contact the Federal Service Desk at 866-606-8220. Interested bidders must be registered in the System for Award Management (SAM) at https://sam.gov. The North American Industrial Classification System (NAICS) code applicable to this requirement is 238220 (Plumbing, Heating, and Air Conditioning Contractors) with a corresponding small business standard at $19.0 million average annual receipts for the firms preceding three fiscal years. The estimated magnitude of this project lies between $1,000,000 and $5,000,000. Interested bidders must be registered in https://sam.gov. The FBOP is seeking small business contractors for this project. Your business size metrics information entered in your SAM registration must be less than or equal to the small business size standard specified above to qualify as a small business. Interested contractors are requested to respond to this notice by adding their names to the Interested Vendors List for this posting on the SAM website at https://sam.gov. You must be logged in to your vendor account in order to access the Interested Vendors List. Please add your business name only if you are interested in submitting an offer as a Prime contractor and are capable and eligible to compete for and perform this project. This notice is intended only for those who would be entering into a Prime contract with the FBOP for the entirety of the project. The FBOP has no privity of contract with subcontractors. Interested small business contractors are requested to respond to this notice by filling out and emailing completed questionnaire attachment to Kevin Slone at kslone@bop.gov. Responses must be received by November 20, 2026. Interested vendors must also add their name to the Interested Vendors List for this posting in https://sam.gov Contract Opportunity (must be logged-in to your vendor account). The synopsis of proposed contract action will include further instructions for responding to this opportunity. Interested offerors are advised to continuously monitor SAM for all future updates.
Stated in the notice: The estimated magnitude of this project lies between $1,000,000 and $5,000,000.
504-21-703 Training and Admin Support Space Construction
EHRM Training and Administrative Support Space Project No.: 504-21-703 Solicitation No.: 36C25727B0001 The Amarillo VA Medical Center has a requirement for the construction of infrastructure and concrete pad space to support mobile EHRM training and administrative facilities at the Amarillo VA Health Care System, 6010 Amarillo Blvd West, Amarillo, TX 79106. The contractor shall provide all labor, supervision, materials, equipment, supplies, tools, and construction services necessary to provide electrical power, domestic water, sanitary sewer, and telecommunications fiber to three utility pad locations. The work also includes constructing concrete pads in accordance with the drawings and specifications and repairing or restoring landscaping, roads, sidewalks, and other site areas disturbed by construction Network Contracting Office 17 anticipates awarding a Firm-Fixed Price Construction contract. The anticipated method of procurement shall be an Invitation for Bid (IFB) in accordance with the procedures set forth in Parts 14 and 36 of the Federal Acquisition Regulation (FAR). Period of Performance: The period of performance (POP) shall be 183 calendar days after issuance of the Notice to Proceed (NTP). NAICS & Size Standard: The NAICS code for this procurement is 237130, Power and Communication Line and Related Structures Construction with a small business size standard of $45.0 Million. Construction Magnitude: The estimated price ranges between $0 and $1,000,000. Tentative Solicitation Date: November 30, 2026 December 30, 2026 Tentative Award Date: January 20, 2027 Program Office Points of Contact: Contracting Officer s Representative (COR):� Logan Dunn, Logan.Dunn@va.gov. Contracting Officer POC: The POC for this project is Makarim Abdul-Jabbar. She can be contacted by email at makarim.abdul-jabbar@va.gov. Important Notice: Apparent successful offerors must apply for and receive certification from the U.S. Small Business Administration (SBA) in accordance with 13 CFR Part 128 and VAAR 819.70 The VA Veterans First Contracting Program. Offerors must be certified by the U.S. Small Business Administration (SBA) as a Service-Disabled Veteran-Owned Small Business (SDVOSB) and be listed in SBA s Small Business Search (SBS) database prior to submission of their offer. Failure to be certified and listed in SBA s SBS database at the time of offer submission may result in the offer being deemed nonresponsive. Offerors are responsible for ensuring their SBA certification and registration information are current and accurate prior to submission of an offer End of Document
Stated in the notice: Construction Magnitude: The estimated price ranges between $0 and $1,000,000.
HAWAII REGION O&M IDIQ MATOC
Operation & Maintenance (O&M) with Incidental Repair and Minor Construction, Indefinite Delivery Indefinite Quantity (IDIQ) Multiple Award Task Order Contract (MATOC) in Support of Defense Health Agency (DHA), Hawaii Region. The intent of the O&M with Repair and Minor Construction contracts are to provide quick response for performing O&M, repair and minor construction relating, but not limited, to the architectural, mechanical, electrical, instrumentation, security and safety areas of military healthcare and research laboratory facilities in a cost-effective manner. This is a Sought Sought Notice (SSN) for the purpose of market research only. No award will result from this SSN. There is no solicitation available at this time; therefore, do not request a copy of the solicitation. If a solicitation is released it will be synopsized in accordance with the Revolutionary Federal Acquisition Regulation (FAR) Overall and its supplements. It is the contractor's responsiblity to monitor the Government Point of Entry (GPE) for the release of any solicitation. **Please review and respond based on the information provided in the SSN attachment.
Carville Job Corps Center Caretaker Services
Carville Job Corps Center � Caretaker Services The U.S. Department of Labor (DOL), Office of Job Corps Acquisition Services (JCAS), is issuing a Request for Quotation (RFQ) for caretaker services at the Carville Job Corps Center in Louisiana. This acquisition is set aside for eligible participants in the Small Business Administration (SBA) 8(a) Business Development Program and will be conducted as an 8(a) competitive acquisition. The contractor shall provide all necessary personnel, supervision, equipment, materials, and services required to maintain and protect the Carville Job Corps Center facilities and grounds. Services include facility upkeep, grounds maintenance, site security, protection of Government property, and related caretaker support activities, as specified in the Performance Work Statement (PWS). Acquisition Information NAICS Code: 561210 � Facilities Support Services Product Service Code (PSC): Z1CA Contract Type: Firm-Fixed-Price (FFP) Set-Aside: 8(a) Competitive Place of Performance: Carville Job Corps Center, Louisiana Period of Performance Base Period: January 1, 2027 � December 31, 2027 Option Period 1: January 1, 2028 � June 30, 2028 Option Period 2: July 1, 2028 � December 31, 2028 Option Period 3: January 1, 2029 � June 30, 2029 Option Period 4: July 1, 2029 � December 31, 2029 The total anticipated period of performance, including all options, is 36 months. Interested eligible 8(a) participants shall review the attached RFQ, PWS, and supporting solicitation documents for the complete requirements, quotation preparation instructions, evaluation criteria, and submission procedures. Quotations must be submitted in accordance with the instructions and deadline established in the RFQ.
Vandenberg SFB Tank Inspection
The purpose of Amendment 0004 is to provide RFI responses thus far. This is a non-personnel services contract to perform inspections on Department of Defense fuel tanks. This service entails removal, disposal, transfer of remaining fuel, tank cleaning, replacing wiper seals, and providing an aboveground storage tank (AST) Inspection on tank(s) listed in Attachment B.
SAS4408 Pedestrian Bridge Replacement
Only Civil/Paving MACC Contractors listed on the General Requirements cover page may submit a proposal for this ROICC Camp Lejeune area of responsibility project. See attached documents for scope of work and any applicable drawings.
Child Development Center (CDC), Tinker Air Force Base, Oklahoma
Child Development Center (CDC), Tinker Air Force Base, Oklahoma. THIS PROJECT IS FOR A NEWLY CONSTRUCTED CDC FACILITY WILL ACCOMMODATE 228 CHILDREN AGED FROM INFANT TO FIVE-YEARS OLD, 80 STAFF MEMBERS AND VISITORS. CONSTRUCTION INCLUDES A SINGLE-STORY FACILITY WITH DRILLED PIER FOUNDATION, CONCRETE SLAB, STEEL FRAME, DOUBLE WYTHE MASONRY EXTERIOR WALLS, AND STANDING SEAM METAL ROOF. PROJECT INCLUDES CORE ADMINISTRATIVE SPACES, STAFF AND FACILITY SUPPORT SPACES, CHILD ACTIVITY AREAS, MULTI-PURPOSE ROOMS, ISOLATION ROOMS, LAUNDRY ROOMS LACTATION ROOMS, STORAGE ROOMS, KITCHEN AND EQUIPMENT, AND AUTHORIZED EQUIPMENT SUCH AS CCTV SYSTEM, PLAYGROUND AREA AND EQUIPMENT. THIS ACQUISITION IS FULL AND OPEN COMPETITION. THIS SOLICITATION AND RESULTING CONTRACT ARE UTILIZING A BEST VALUE TRADE-OFF PROCUREMENT METHOD AS DESCRIBED IN RFO PART 15. THE MAGNITUDE OF CONSTRUCTION IS BETWEEN $50,000,000.00 AND $75,000,000.00. THE NAICS CODE FOR THIS PROJECT IS 236220, COMMERCIAL AND INSTITUTIONAL BUILDING CONSTRUCTION. THE SIZE STANDARD IS $45,000,000. DPAS RATING: DO-C2, REFER TO CLAUSE FAR 52.211-15, DEFENSE PRIORITY AND ALLOCATION REQUIREMENTS. Amendment 0001 provides site visit information. Amendment No. 0002 is hereby issued. Please see attachments for full summary of changes. Amendment No. 0003 is hereby issued. Please see attachments for full summary of changes.
Stated in the notice: THE MAGNITUDE OF CONSTRUCTION IS BETWEEN $50,000,000.00 AND $75,000,000.00.
FY27 Euclid Creek Fishway Construction
Amendment 00001: Amendment 00001 includes information on a site visit to be conducted on November 13, 2026 at 12:00 pm EST. Additionally, this amendment includes changes to the plans and specs to no longer include tree felling as part of the project requirements. The contractor will still be required to remove the felled trees from the work site. Please acknowledge this amendment in the submission of your bids. This posting is an Invitation for Bid (IFB) issued by the U.S. Army Corps of Engineers, Buffalo District, for the construction of the Euclid Creek Fishway at the existing Euclid Creek Spillway in Cleveland, Cuyahoga County, Ohio. The project includes construction of a fishway within the existing spillway and modification of the spillway as necessary to accommodate the fishway. Additional work includes construction of an access road, retaining wall, railing, and road gate; tieback design and tieback fabrication/installation for the retaining wall; and site restoration in accordance with the plans and specifications. Associated work includes concrete removal, excavation, dewatering, clearing and grubbing, and other incidental work necessary to provide a complete and usable project. The North American Industry Classification System (NAICS) code for this procurement is 237990, Other Heavy and Civil Engineering Construction. This acquisition will be competed as a 100% Small Business Set-Aside. The magnitude of construction is estimated to be between $5,000,000 and $10,000,000.Please be advised that this requirement is subject to change and may be revised or canceled at any time prior to award.
Stated in the notice: The magnitude of construction is estimated to be between $5,000,000 and $10,000,000.Please be advised that this requirement is subject to change and may be revised or canceled at any time prior to award.
Mather Fueling System Repairs
Project is located in Mather, CA. Includes all work to install a sampling gauge hatch on a manway, install a clock type mechanical gauge on a manway, recoat the exterior of the tank, replace the collision barriers, add a catwalk that extends across the entirety of the tank, and replace the audible and visual alarms. o Fix the remote containment basin drainage issue. o Replace the asphalt on the NE side of the fueling facility. o Repair the refueler parking concrete. o Replace the dispenser fuel monitor with a non-coalescing filter and install a water draw off system with a hand pump. o Replace the asphalt near the loading/unloading facility with a concrete path. o Replace POL building of the same size and at the same location. o Complete supplying, installation, and testing ATG system on Fuel Storage Tank, AVGAS. o Relocate the generator that is inside the compartmentalized area.
FCI Oxford - Water Softener
The Federal Bureau of Prisons (FBOP) and the Federal Correctional Institution Oxford located at 350 Elk Avenue, Oxford, Wisconsin, intend to make a single award to a responsible entity that will provide all necessary equipment, labor, materials, and incidentals to remove existing water softeners and install a new centralized water softener for the entire Institution. Awarded Contractor shall provide materials, labor, and equipment to remove existing water softeners, pipe through and install a new centralized water softener and all associated components. FCI Oxford currently has several commercial-grade water softeners which are failing to efficiently reduce water hardness and protect water systems, as well as connected equipment. The new centralized system should improve water quality, minimize calcium buildup, and extend the service life of plumbing infrastructure and appliances. The contractor would place a brine tank and softener to be installed at the water tower. Water would be treated right off the water main, therefore there would be no need for bagged salt to be brought in weekly.
Rygge DABS / FEV New Construction
The U.S. Army Corps of Engineers (USACE) Europe District is planning a requirement for a firm-fixed-price, design-bid-build construction contract to build a new Deployable Airbase System (DABS) with facilities, vehicles, and equipment (FEV) in Rygge, Norway. The project�s anticipated magnitude of construction is between $50,000,000.00 and $125,000,000.00 with a construction duration of 830 calendar days from issuance of the Notice to Proceed (around March of 2027). This procurement is an unrestricted (full-and-open competition) Request for Proposal (RFP) using Federal Acquisition Regulation (FAR) Part 36 and FAR Part 15 with the Tradeoff source selection process. An official RFP is anticipated to be posted here through the Procurement Integrated Enterprise Environment (PIEE) website on or around June 1, 2026, and a site-visit is tentatively scheduled for mid-June. Interested offerors must be registered in PIEE to submit a proposal. Note: Any solicitation issued resulting from this notice will be in a separate announcement. A company must be registered and active in SAM to be considered for contract award. Further instructions and information can be found at https://sam.gov/content/entity-registration.
Stated in the notice: The project�s anticipated magnitude of construction is between $50,000,000.00 and $125,000,000.00 with a construction duration of 830 calendar days from issuance of the Notice to Proceed (around March of 2027).
St. Lucie South Jetty Repair Industry Day
This announcement constitutes a Special Notice. This announcement seeks information from industry and will only be used for preliminary planning purposes. THIS IS NOT A SOLICITATION FOR PROPOSALS AND NO CONTRACT SHALL BE AWARDED FROM THIS SPECIAL NOTICE. Respondents will not be notified of the results of the evaluation. This is a SAVE-THE-DATE special notice for an industry day event on 07 December 2026 at 10:00 AM EST. All interested Offerors are required to access SAM.gov for future updates. Please view registration information and details below. The presentation slides and list of attendees will be made available and posted to the subject special notice on SAM.gov after the conclusion of the event. The U.S. Army Corps of Engineers, Jacksonville District will be holding an Industry Day event to gauge the interest, capabilities, and qualifications of various members of the Construction Community, to include Small Businesses. This event will provide information and obtain feedback from interested Offerors prior to issuance of the official solicitation. This requirement is for fiscal year (FY) 2027 award. NAICS Code 237990: Other Heavy and Civil Engineering Construction Small Business Standard: $45 million Price Target Range: $25 - $50 million Estimated Period of Performance: 730 calendar days Project Background Project Title: St. Lucie South Jetty Rehabilitation Interagency, Martin County, Florida. Project Description: The work consists of rehabilitation of the head structure of the South Jetty at St. Lucie Inlet. This includes a rebuilt rounded head structure and head-to-trunk transition with a marine mattress foundation and toe protection stones. Rehabilitation will require substantial moving and manipulation of both new and existing stones to obtain the required interlocking. The reworking of existing stones is only for incorporation of new stone. The retrieval of existing stone outside of the design template will not be required and is not part of the necessary rework of existing stone. The originally constructed South Jetty is approximately 1,320 feet in length with a crest height of 5.5 feet NAVD88. The crest width is 10 feet and the north and south slopes of the structure slope at 1V:2H. There is an asphalt walkway approximately 1,090 feet in length that runs along the existing jetty crest, terminating eastward at approximately Station 12+00 as shown on the approved permit drawings. Manipulation of stone along the crest may be necessary while completing the required work along the side slopes. The asphalt walkway will need to be removed within the repair area as necessary as work progresses. Any asphalt sections removed, or damaged such that they need to be removed, must be transported and properly disposed of off-site, and will not need to be replaced. Project Information Scope of Work: The proposed work includes rehabilitation of the head of the south jetty structure (the seaward-most 400 to 500 feet) by restabilizing the structure foundation and placing a second layer of large armor stone. The proposed scope includes: Excavating the existing bed material to place a widened marine mattress foundation, expanding the current structure footprint up to 85 feet on the jetty centerline as shown on the approved permit drawings; Placing 9- to 15-ton toe protection stones to form the structure foundation and provide scour protection; Removing and disposing of the remaining asphalt walkway and other debris off-site; Repairing the existing core and reworking the single layer of armor stone, as needed; and, Placing a second layer of 9- to 15-ton armor stone to stabilize the structure. Overview of Construction Staging and Access Requirements: Clearing of access routes and staging areas may be required. Any areas that are disturbed during construction are to be restored to pre-construction conditions or better once jetty rehabilitation work is completed. Expansion and/or improvements of access routes may be required. Maximum limits of access routes and staging areas are shown on the approved permit drawings. Additional Environmental Considerations: Construction will be permitted all year round and confined to daylight hours only. Construction that occurs during turtle and shorebird nesting seasons or has the potential to impact other Endangered Species Act (ESA) Protected Species, is subject to environmental restrictions and monitoring requirements. Refer to Table 1 under the Attachments for a list of protected species. Access from the water is allowed, but material cannot be dredged outside of the construction limits. All material excavated must pass through a 2-inch screen prior to use as backfill around the jetty structure or on the beach. All screened material must be disposed of off site. Excavated material may be used to build up the east staging area within the limits shown on the approved permit drawings. After jetty rehabilitation work is complete, the staging area must be graded to the beach fill template and native vegetation restored as shown on the approved permit drawings. Requests for Information: Industry is asked to consider the following questions and provide input at the Industry Day: Company/Contractor name, address, point of contact, phone number and e-mail address. Does the Contractor plan to submit a proposal for this contract? Describe the proposed construction methods and equipment needed to rehabilitate the jetty. Address, at a minimum, excavation of existing grade, maintaining open excavation areas, debris removal, and installation of marine mattresses and armor stone. Would temporary earth-retention or water-control measures, such as a cofferdam or similar system, be required to complete the work? Would dewatering be completed if this is the proposed construction methodology? If a cofferdam or other earth-retention system that also excludes all swimming ESA-listed species is not proposed, describe the measures that would be used to prevent the swimming ESA-listed species from entering the active work area during construction, including proposed turtle deterrent measures. ESA-listed species present in the area are included in Table 1 under the Attachments. Describe the turbidity control measures that would be incorporated into the proposed construction methodology. If it is not feasible, describe the limitation or restrictions for why not. What safety constraints or hazards could limit the practicality of potential construction methods? What temporary protections or operational measures would be needed to perform the work during winter months, given the inlet�s elevated coastal conditions during that period? Event Date: Monday, 07 December 2026 at 10:00 AM EST Event Location: 2401 SE Monterey Rd, Stuart, FL 34996 *Everyone will need to have a driver's license or id to get through security. Contact Info: Jim LaGrone, Project Manager James.W.Lagrone@usace.army.mil 904-521-2086 If you cannot attend in person: Link Meeting: https://www.microsoft.com/EN-US/MICROSOFT-TEAMS/JOIN-A-MEETING Meeting ID: 993 391 786 289 Passcode: kR3Zt9F8 Join by phone: 601-262-2433 Phone conference ID: 450 517 165# Event Schedule: Interested parties who consider themselves qualified to perform the above project are invited to submit a capabilities statement, a response to the questionnaire on this Special Notice and any questions you have for the Government ahead of the breakout session by no later than December 04, 2026, at 1:00 PM, EST. All responses under this Special Notice shall be sent via email to Nicole Batista-Cruz at Nicole.M.Batista-Cruz@usace.army.mil, and Ruth Rodriguez at ruth.c.rodriguez@usace.army.mill. Your email subject line should be addressed as "St. Lucie South Jetty Repair Industry Day Registration (Company Name) - W912EP-27-Z-1CUE " to ensure the request is handled in a timely manner. All interested parties who consider themselves qualified to perform the above project are also invited to request a breakout session with the Government on a first come, first serve basis with the following timeslots as follows: 1300-1330 1340-1410 1420-1450 1500-1530 1540-1610 1620-1650 NOTES: DO NOT SUBMIT PROPRIETARY AND/OR BUSINESS CONFIDENTIAL DATA. All responses to this Industry Day Special Notice will be evaluated and used in determining acquisition strategy. Prior Government contract work is not required for submitting a response under this Special Notice. NO REIMBURSEMENT WILL BE MADE FOR ANY COST ASSOCIATED WITH PROVIDING INFORMATION IN RESPONSE TO SAID NOTICE, ATTENDANCE TO THE INDUSTRY DAY EVENT OR ANY FOLLOW-UP INFORMATION SUBSEQUENTLY REQUESTED. You must be registered with the System for Award Management (SAM) in order to receive a Government contract award. To register, go to www.sam.gov. For additional information visit the website for the Federal Service Desk (www.FSD.gov) which supports SAM or contact them at 866-606-8220 for assistance.
Demolition of an existing building, Site Improvements and construction of a Modular Office Building at the US Merchant Marine Academy Campus, Kings Point, NY
The U.S. Army Corps of Engineers, New York District is issuing an invitation for bid to award a Firm Fixed Price construction contract for the demolition of existing building, site Improvements and provide a turnkey modular office facility. The scope includes the demolition of an existing 10,000 SF building (with basement, in-ground pool, and pool shed), Hazardous Materials Abatement and Disposal, Site Improvements (SWPPP Controls, Sidewalks, Parking, Landscaping, Temp Fencing, Utilities Infrastructure including Water, Sewer, Electrical, Telecom tie-ins), and construction of a new office space of approximately 5,700 square feet, composed of custom modular units. The facility will be a single-story complex with a u-shaped space opening onto a small deck. It will house open offices with cubicles, six private offices, two conference rooms, four single-user bathrooms, a kitchenette/pantry room, lactation room, storage closets, and a mechanical room. The project scope encompasses incidental demolition, site prep work, foundations, underground utility hook ups, and site lighting. The contractor will also be responsible for providing furniture, fixtures, and equipment based upon the drawings and specifications. The building and site infrastructure are required to have a minimum life expectancy of 10 to 15 years. The contract duration will be 136 calendar days for the entire project with phasing work involved. NAICS: 236220 Size standard: $45 million. Project magnitude is between $1,000,000 - $5,000,000.
Stated in the notice: Project magnitude is between $1,000,000 - $5,000,000.
Demolition of an existing building, Site Improvements and construction of a Modular Office Building at the US Merchant Marine Academy Campus, Kings Point, NY
The U.S. Army Corps of Engineers, New York District intends to issue an invitation for bid to award a construction contract for the design and construction of a modular office space located along Steamboat Road on the US Merchant Marine Academy Campus (USMMA) adjacent to 307 Steamboat Road. The project magnitude is between $1-5M.This project will be advertised as 100% total Small Business Set-Aside. Summary of Work: The project objective is to design and provide a turnkey modular office facility. The scope includes the design and construction of a new office space of approximately 5,700 square feet, composed of custom modular units. The facility will be a single-story complex with a u-shaped space opening onto a small deck. It will house open offices with cubicles, six private offices, two conference rooms, four single-user bathrooms, a kitchenette/pantry room, lactation room, storage closets, and a mechanical room. The project scope encompasses incidental demolition, site prep work, foundations, underground utility hook ups, and site lighting. The contractor will also be responsible for providing furniture, fixtures, and equipment based upon the drawings and documentation provided in the Specifications package. The building and site infrastructure are required to have a minimum life expectancy of 10 to 15 years. The contract duration will be 136 calendar days for the entire project with phasing work involved. The North American Industry Classification System (NAICS) code is for general construction; 236220 for Commercial a nd Institutional Facilities. Solicitation has been posted. See link below. https://sam.gov/workspace/contract/opp/74ce082cc2f34be4926ac48ccf9cf9a5/view
Stated in the notice: The project magnitude is between $1-5M.This project will be advertised as 100% total Small Business Set-Aside.
UTILITY EXCAVATION AND REPAIR SERVICES IDIQ
Fermi National Accelerator Laboratory (Fermilab) is soliciting proposals for an Indefinite Delivery Indefinite Quantity (IDIQ) type Master Subcontract for Utilities Excavation and Repair Services for Fermilab located in Batavia, IL. Fermi Forward Discovery Group (FFDG) seeks to find a qualified subcontractor to perform on-call, scheduled, and emergency excavation services and utility repairs, as described in Exhibit C, Statement of Work, and the requirements of each task order. Work will be performed across the Fermilab site, which covers approximately 6,800 acres in Kane and DuPage Counties and includes approximately 375 buildings and structures. The site contains a wide variety of soil types and terrain, such as clay soils, fill, and saturated soils, in settings that include developed areas, open prairie, woodlands, wetlands, and areas adjacent to ponds and waterways. Offerors should consider these conditions in their technical approach, equipment selection, and pricing. Fermilab operates 24 hours per day, 365 days per year, and the work must support uninterrupted laboratory operations. The Request for Proposal and all Exhibits are located at Sam.gov under Solicitation number 385439GMK. Questions Close on November 18, 2026 at 5:00 pm CST. All questions must be submitted in writing to ginakern@fnal.gov. The Request for Proposal (RFP) CLOSES on December 7, 2026 at 3:00 pm CST. Please email your proposals with all required documents to ginakern@fnal.gov.
Modernize 6N Inpatient Restrooms (Swing for 3N)
The contractor shall provide all labor, materials, equipment, and supervision necessary to remove and replace ten (10) existing inpatient restroom Patient Care Units (PCUs) with VA-approved fixed-type toilet, sink, cabinet, and countertop assemblies. Work includes demolition of existing units, reuse of existing plumbing connections, wall repair and painting, installation of new PCUs, and installation of new privacy curtain tracks and curtains. All work shall be performed in an occupied healthcare environment while minimizing disruptions to facility operations and maintaining access to adjacent spaces. The required period of performance is 180 calendar days from Notice to Proceed.
NRM-CONST | 632-23-112 Replace Roofs and Repair Facades Buildings 6 and 7 | FY27 NRM
NA
528A8-22-814 Consolidate Primary Care Reception
This procurement is for construction services for second part of the Consolidate Primary Care (CPC) projects phase 1 that will continue to consolidate the primary care units currently located on the 1st, 4th, and 8th floors in Building 1 of the Albany VA Medical Center located at 113 Holland Avenue, Albany NY 12208. The three primary care units are being combined on the first-floor core of the Albany VA Medical Center. In this phase, a new reception area shall be built to accommodate six (6) Medical Support Assistants (MSA) desks and a waiting lobby. This project also includes the relocation of the Agent Cashiers office in the existing space. The overall project footprint is approximately 5,000 sqft. The project consists of a phased construction approach, which includes restrictions on when certain construction activities can be performed. The contractor is required to follow all VA safety and infection prevention requirements at all times
Borough of Millvale, Pennsylvania, Local Protection Project (LPP) PL84-99 Rehabilitation
The Millvale LPP was constructed by U.S. Army Corps of Engineers (USACE) in 1980 under the authority of Section 205 of the Flood Control Act of 1948 as amended. The project consists of about 6,200 feet of channel improvement including concrete gravity retaining walls, concrete wall supports, anchored concrete toe blocks, concrete cap walls, stone-filled gabion mattresses, flap gates and access ramps. The LPP is an urban Flood Control Work (FCW), and it is not a multipurpose project. Heavy rains from 1-12 April 2024 caused flooding which damaged the Project within Girtys Run, including bank erosion, shoaling, erosion of the improved channel, ruptured gabion baskets, washed-out concrete buttresses, and erosion of grouted riprap. Of particular concern are the washed-out buttresses which have migrated to the center of the improved channel, impeding streamflow. If the buttresses are not removed and stream bank improvements continue to deteriorate, there is a risk that debris will continue to accumulate and could ultimately damage the channel downstream of the impediment. To address these damages, Allegheny County requested rehabilitation assistance from USACE through the PL 84-99 program, which authorizes USACE to rehabilitate eligible Federal and non-Federal LPPs damaged or destroyed by floods. An agreement was signed on 6 August 2025 between the Borough of Millvale and USACE to complete the necessary repairs. The work is to be completed within 365 calendar days after written Notice to Proceed (NTP). The Anticipated Construction Cost is between $300,000.00 and $350,000.00. The North American Industrial Classification Code (NAICS) is 237990 - Other Heavy and Civil Engineering Construction. The Small Business Size Standard is $45,000,000.00. Any resultant award will be for one (1) Firm-Fixed-Price (FFP) Purchase Order. The anticipated award date is 22 December 2026. The basis of award will be of best value to the Government. Quotes will be evaluated in accordance with (IAW) RFO Part 13 and 36, price and past performance. The Government reserves the right to reject any quotes that exceed available funds for this requirement. Information regarding the U.S. Army Corps of Engineers process for settling requests for equitable adjustments and duration goals to achieve definitization of equitable adjustments for change orders under construction contracts can be found by going to https://www.usace.army.mil/Strategic-Partnerships/Partnering/mod/129895/details/443/ then scrolling down on right hand side of page by clicking on View FFP Contract Changes Playbook Here.
Northeast Region Pavement and Bridge Preservation Construction - NP NER PMS BMS FY25(2)
Sealed bids from certified Small Business Concerns only will be accepted for the Northeast Region Pavement and Bridge Preservation Construction, Project NP NER PMS BMS FY25(2), Solicitation Number 693C73-27-B-000004, located in Essex County, New Jersey; Pike, Wayne, and Lackawanna Counties, Pennsylvania; and the City of Baltimore, Maryland. The project consists of roadway and bridge maintenance at Thomas Edison National Historical Park (EDIS), Fort McHenry National Monument and Historic Shrine (FOMC), Steamtown National Historic Site (STEA), and Upper Delaware Scenic and Recreational River (UPDE). The work includes micro surfacing, thin lift asphalt overlay, crack cleaning and sealing, asphalt concrete pavement patching, milling and overlay, concrete repair, drainage repairs, speed bump replacement, concrete paver installation, pavement markings, minor bridge repairs, and other miscellaneous work. The project will be split into multiple work schedules/contract options, with the cost of the entire project expected to fall within the price range of $3,000,000 to $4,000,000. Bid documents should be issued on or about November 6, 2026. Bid due date and location will be specified on the SF 1442, Block 13a of the Solicitation. Use Internet address https://www.sam.gov (click on Contract Opportunities, then type �693C73� in the Search Contract Opportunities box and click the search button and all available projects will be listed) to check for the availability of advertisement documents. All documents can be directly downloaded from this website. Solicitation documents will not be mailed. Register to receive email notifications to be automatically notified when a document is added or updated for a specific project. If firms do not register as an interested vendor at this website, there will be no Interested Vendors List. Please send all questions concerning construction projects to eflhd.contracts@dot.gov. Include the solicitation number, project name and number, requesting firm and address, a point of contact and telephone number. Requests for 'faxing' or overnight mailing will not be accepted. IMPORTANT SAM REGISTRATION AND PAYMENT REQUIREMENTS In accordance with Federal Acquisition Regulation (FAR) 52.204-7 (DEVIATION NOV 2025), prospective contractors shall have an active Federal Government contracts registration in the System for Award Management (SAM) when submitting an offer in response to this solicitation and at the time of award. To register in SAM, go to https://www.sam.gov. Annual contractor representations and certifications must be completed online at https://www.sam.gov. Also, FAR 52.232-33 requires SAM registration for payment. The required annual Form VETS-4212 must also be completed online at http://www.dol.gov/vets/vets4212.htm per FAR 52.222-37. PLEASE NOTE For security reasons, individuals requiring access to all government buildings must present a valid photo ID and be escorted to their destination by a Government employee. All visitors attending bid openings are urged to arrive at least 1 hour prior to a scheduled bid opening. All visitors must sign in at the main entrance of the Quantum Park facility and wait to be escorted by a Government employee to Eastern Federal Lands Highway Division (EFLHD) in Suite 200. Visitors must then register with the EFLHD Receptionist. A Government employee will collect all bids. Prior to the bid opening, a Government employee will escort all bidders to the bid opening. Unescorted visitors will be denied entry and no exceptions will be made. Bidders are encouraged to submit bids electronically per the instructions provided in the solicitation.
528A8-22-814 Consolidate Primary Care Reception
Due to a transmission error, the solicitation document has been manually replaced, this amendment describes the changes in the new document.