Construction — open bids
557 open bids, newest first. Full details live here — you only leave for the official posting when you bid.
Gila National Forest Vault Toilet Decommissioning
**********UPDATE 11-5-2026********** AMENDMENT 001 posted today with the following five (5) updated and/or new attachments: 1. 127EAX27Q0007_0001 2. RFI Questions and Responses_127EAX27Q0007_Amendment 001 3. Attachment F1_Wage Determination_Grant County_NM20260019 5.18.2026 4. Attachment F2_Wage Determination_Catron County_NM20260010_5.18.2026 5. Attachment F3_Wage Determination_Sierra County_NM20260012_5.18.2026 **********End of Amendment 001********** Commercial Construction Requirement Furnish all materials, labor, equipment, supervision, tools, and utilities required to perform operations necessary to (A) demolish five existing vault toilets and to (B) decommission and then relocate three other CXT� style vault toilets. There is one option item that includes the demolition of one single user Romtec� vault toilet and the procurement and installation of a new CXT� �Gunnison� single user vault toilet. A second option is to procure a toilet and have it delivered but with no installation.
Access Control Point (ACP) Active Vehicle Barrier (AVB) Systems and Guard Booths
This Sources Sought / Market Research Capabilities Questionnaire is issued to identify and assess potential industry capabilities, small-business participation, and acquisition-strategy considerations for a potential design-build construction project involving Active Vehicle Barrier Control System (AVBCS), guard booth, and associated access control point (ACP) infrastructure improvements at Shop Gate and Adams Gate, Fort Lee, Virginia. This notice is issued for planning and market-research purposes only. It is not a solicitation, request for proposal, request for quotation, or commitment by the Government to award a contract. This notice does not restrict the Government as to the ultimate acquisition approach. The Government will not reimburse respondents for costs associated with preparing or submitting a response. Responses are not offers and cannot be accepted by the Government to form a binding contract. The Government does not intend to rank submittals, provide individualized feedback, or return responses. Responses will be used to assess industry capability, small-business participation, acquisition strategy, scope packaging, potential sources, construction phasing, and schedule and supply-chain risk. This notice does not constitute a request for pricing.
91st Cyber Operations Center � Progressive Design-Build Other Transaction Agreement
The U.S. Army Corps of Engineers (USACE), Fort Worth District, on behalf of the Department of the Air Force (DAF), is issuing this Program Solicitation to identify a Design-Build Team for the 91st Cyber Operations Center at Joint Base San Antonio (JBSA), Lackland Air Force Base, Texas. The project involves the design and construction of an approximately 42,000-square-foot, multi-story facility to support the mission requirements of the Air Combat Command 91st Cyber Operations Squadron. The facility will be designed and constructed to meet applicable security and technical standards for a mission-critical cyber operations environment. This acquisition will use a Progressive Design-Build (PDB) delivery model executed under an Other Transaction (OT) Agreement pursuant to 10 U.S.C. � 2808a. The acquisition will be conducted in two phases: Phase 1�Design and Pre-Construction Services: The selected Design-Build Team will collaborate with the Government to refine project requirements, advance the design, validate cost and schedule, and support development of the Phase 2 scope. Phase 2�Construction Packages: Subject to successful Phase 1 performance, successful negotiation, required approvals, authorization, and availability of funds, the Government may authorize subsequent construction packages through Agreement Amendment. Anticipated packages include: Phase 2A�Site/Civil and Early Construction: Site development, civil work, and other early construction activities. Phase 2B�Building Construction: Final design completion and construction of the 91st Cyber Operations Center facility. The Government may authorize additional construction packages, as appropriate. The Government is under no obligation to proceed with Phase 2A, Phase 2B, or any additional package. The Government will use a two-step, qualifications-based selection process: White Paper Submission and Evaluation Pitch Meetings, by invitation only Interested Design-Build Teams are invited to submit a White Paper in accordance with the solicitation and its attachments. The White Paper is the only submission required at this time. White Papers must address all requirements in Attachment 1, Request for White Paper Submission Requirements. Questions: All questions must be submitted through the ProjNet Bidder Inquiry System no later than 11 November 2026, in accordance with the solicitation instructions. White Paper Due Date: White Papers are due no later than 17 November 2026 at 1400 Central Time. Submission Method: Submit White Papers by email to the Solicitation Points of Contact identified in the solicitation. Required Email Subject Line: �White Paper for 91st Cyber Operations Center� Refer to the attached Program Solicitation, Attachment 1�Request for White Paper Submission Requirements, and Attachment 2�Project Requirements Document for the complete project scope, submission instructions, evaluation approach, and applicable requirements.
91st Cyber Operations Center � Progressive Design-Build Other Transaction Agreement
The U.S. Army Corps of Engineers (USACE), Fort Worth District, on behalf of the Department of the Air Force (DAF), is issuing this Program Solicitation to identify a Design-Build Team for the 91st Cyber Operations Center at Joint Base San Antonio (JBSA), Lackland Air Force Base, Texas. The project involves the design and construction of an approximately 42,000-square-foot, multi-story facility to support the mission requirements of the Air Combat Command 91st Cyber Operations Squadron. The facility will be designed and constructed to meet applicable security and technical standards for a mission-critical cyber operations environment. This acquisition will use a Progressive Design-Build (PDB) delivery model executed under an Other Transaction (OT) Agreement pursuant to 10 U.S.C. � 2808a. The acquisition will be conducted in two phases: Phase 1�Design and Pre-Construction Services: The selected Design-Build Team will collaborate with the Government to refine project requirements, advance the design, validate cost and schedule, and support development of the Phase 2 scope. Phase 2�Construction Packages: Subject to successful Phase 1 performance, successful negotiation, required approvals, authorization, and availability of funds, the Government may authorize subsequent construction packages through Agreement Amendment. Anticipated packages include: Phase 2A�Site/Civil and Early Construction: Site development, civil work, and other early construction activities. Phase 2B�Building Construction: Final design completion and construction of the 91st Cyber Operations Center facility. The Government may authorize additional construction packages, as appropriate. The Government is under no obligation to proceed with Phase 2A, Phase 2B, or any additional package. The Government will use a two-step, qualifications-based selection process: White Paper Submission and Evaluation Pitch Meetings, by invitation only Interested Design-Build Teams are invited to submit a White Paper in accordance with the solicitation and its attachments. The White Paper is the only submission required at this time. White Papers must address all requirements in Attachment 1, Request for White Paper Submission Requirements. Questions: All questions must be submitted through the ProjNet Bidder Inquiry System no later than 11 November 2026, in accordance with the solicitation instructions. White Paper Due Date: White Papers are due no later than 17 November 2026 at 1400 Central Time. Submission Method: Submit White Papers by email to the Solicitation Points of Contact identified in the solicitation. Required Email Subject Line: �White Paper for 91st Cyber Operations Center� Refer to the attached Program Solicitation, Attachment 1�Request for White Paper Submission Requirements, and Attachment 2�Project Requirements Document for the complete project scope, submission instructions, evaluation approach, and applicable requirements.
Dugway Proving Ground (DPG) Horizontal Facility Construction Road Maintenance
Amendment 0001 Q&A has been added Date: 22 October 2026 Amendment 0002 Final revised Q&A has been added Date: 05 November 2026 PROJECT TITLE: MISCELLANEOUS PAVING REQUIREMENTS PROJECT LOCATION: U.S. ARMY DUGWAY PROVING GROUND, UTAH DESCRIPTION: THIS IS AN INDEFINITE-DELIVERY, INDEFINITE-QUANTITY (IDIQ), FIRM-FIXED PRICE REQUIREMENT FOR MISCELLANEOUS PAVING CONSTRUCTION SERVICES. ANY WORK REQUIRED BY THE GOVERNMENT SHALL BE ACCOMPLISHED BY THE ISSUANCE OF TASK ORDERS BY THE CONTRACTING OFFICER AGAINST THE PROPOSED CONTRACT. THE PERIOD OF PERFORMANCE (POP) FOR THIS REQUIREMENT IS A TWELVE (12) MONTH BASE PERIOD AND FOUR (4) ONE (1) YEAR OPTION PERIODS OF ONE YEAR EACH. THE ESTIMATED MAGNITUDE IS UP TO $5,000,000.00 ANNUALLY. THE NAICS FOR THIS ACQUISITION IS 237310, HIGHWAY, STREET, AND BRIDGE CONSTRUCTION (SMALL BUSINESS SIZE STANDARD $45 MILLION). PER FEDERAL ACQUISITION REGULATION (FAR) 19.108, THIS REQUIREMENT IS RESTRICTED TO 8(A) FIRMS AUTHORIZED BY THE SMALL BUSINESS ADMINISTRATION'S UTAH DISTRICT OFFICE TO PERFORM WITHIN THE DISTRICT'S GEOGRAPHICAL REGION. Offers shall be received prior to the closing date and time identified on SF 1442 (18 November 2026 by 1300 MDT) to the following address: Contract Specialist: Nicholas J. Rowton; Email Address: nicholas.j.rowton.civ@army.mil Contracting Officer: Jim Keetch; Email Address: Alfred.j.keetch.civ@army.mil Note: Please include Bid Submission and solicitation number W911S6-27-B-A001 in the subject line of the email. Example Subject Reference: Bid Submission W911S6-27-B-A001 DPG Horizontal Construction Paving Bid Opening will be Wednesday 18 November 2026 promptly at 1300 MDT at Dugway Proving Ground Building 5330 Valdez Circle conference room 1201, no bids will be accepted or considered after that time. Site Visit: The Government will hold a virtual site visit only. Bidders are required to submit a completed SF 1442, including the acknowledgement of all amendments in Block 19. SF 1442 cannot be accepted without being signed. The SF 1442 must be completed in full by the bidder, to include the Name and Title of the Person Authorized to sign in Block 20a, an original signature in Block 20b, and the Bid Date in Block 20c. Bids cannot be accepted and will be declared non-responsive without a valid signature in Block 20b. The final total bid price(s) from Technical Exhibit 01 must be annotated on the appropriate CLINs of Section B of the solicitation. Refer to Section L for additional details
Stated in the notice: THE ESTIMATED MAGNITUDE IS UP TO $5,000,000.00 ANNUALLY.
MACH1_AOI_FA890327M1006_F-47 Future Campus at Nellis AFB
**Update 5 Nov 2026**: Added Attachment Q&A (First Round) **Update 1 Nov 2026**: Added Attachment F, Proposed Construction Markups and Commercial Pricing Perameters MACH1 Area of Interest: F-47 Future Campus at Nellis AFB, Rapid Delivery Progressive Design-Build The 772d Enterprise Sourcing Squadron (772 ESS), in coordination with the Air Force Civil Engineer Center (AFCEC), is seeking highly qualified Design-Build teams to deliver the Rapid Delivery Projects supporting the F-47 mission at Nellis Air Force Base, Nevada, utilizing a Progressive Design-Build (PDB) model. This Area of Interest (AOI) is issued under the Modernized Agile Construction Horizons (MACH1) Umbrella Program Notice, FA8903-OT-MACH1. Any resulting agreement will be an Other Transaction Agreement (OTA) executed under the authority of 10 U.S.C. � 2808a. Respondents shall comply with the MACH1 Umbrella Program Notice and the project-specific requirements established in the attached AOI. Program Overview The F-47 Campus at Nellis AFB is an approximately $1.057 billion total programmed military construction initiative intended to provide the facilities and infrastructure necessary to support the F-47 mission. This amount includes construction, contingency, design, construction security, and other applicable project costs and does not represent the construction agreement value available under this AOI. The present acquisition contemplates award for the Rapid Delivery Projects under Milestones 2 through 4 only, consisting of: Combined Operations and Maintenance Hangar. Reprogramming Laboratory. Simulator Facility. Aircraft Apron with Sunshades. Supporting utilities and infrastructure necessary for permanent operation of the Rapid Delivery facilities. The Government strongly prefers to select one Design-Build team capable of delivering all Rapid Delivery Projects, while reserving the right to select up to four teams if warranted by program requirements and permitted by the applicable acquisition authority. The Government also values organizations possessing the qualifications and resources to support the remaining Nellis F-47 Campus. However, selection under this AOI does not guarantee Milestone 5 or subsequent Agreement(s). Progressive Design-Build Delivery Approach The Government intends to initiate design and preconstruction services following completion of the Planning Charrette Reports establishing the initial mission requirements. The selected Design-Build team will work collaboratively with AFCEC and its Owner's Advisor to advance facility designs, evaluate alternative technical and construction solutions, develop cost and schedule strategies, and establish commercially supportable construction pricing. The Government contemplates negotiating firm-fixed-price construction agreement at approximately 65% design completion, subject to sufficient scope maturity, risk allocation, and commercial cost viability. Advanced design packages, early construction activities, and long-lead procurement may be considered where appropriately justified and authorized. AFCEC seeks a collaborative construction partner committed to delivering the greatest possible mission capability and value for the resources invested. The Government intends to consider innovative design and construction approaches, including industrialized construction methods, commercially effective Agreement commitment strategies, and practical alternatives that improve affordability and schedule performance. Three-Phase Selection Process The Government intends to conduct an expedited three-phase selection process under MACH1: Phase 1: Solution Brief. Respondents will submit qualifications and technical information demonstrating the capabilities of their actual proposed design and construction organizations. The attached AOI establishes ten project-specific technical factors and a maximum of 20 narrative pages, with separately permitted appendices. No construction price or rough-order-of-magnitude construction estimate is required during Phase 1 Submissions. Phase 2: Oral Presentations / Pitch Sessions. Selected respondents will be invited to participate in oral presentations. Detailed instructions and additional technical information will be provided to invited respondents, subject to applicable information-security requirements. Phase 3: Full Phase 3 Submission and Negotiations. The Government intends to conduct direct negotiations with selected respondent(s), subject to applicable authority and Agreements Officer approval. Commercial viability of the price will be evaluated before award. Anticipated Acquisition Schedule AOI Release: October 30, 2026. Initial Industry Questions Due: November 4, 2026. Final Industry Questions Due: November 10, 2026. Phase 1 Solution Briefs Due: November 18, 2026, at 9:00 PM Central Standard Time. Phase 2 Invitations: By December 2, 2026. Phase 2 Oral Presentations: December 14�17, 2026. Phase 3 Invitations: December 22, 2026. Phase 3 Submissions Due: January 15, 2027. Target Initial OTA Award: February 5, 2027. All dates are anticipated and subject to revision by the Agreements Officer. Submission Instructions Respondents shall review the complete attached AOI and MACH1 Umbrella Program Notice for eligibility requirements, technical factors, page limits, qualification-sheet requirements, cybersecurity provisions, and evaluation procedures. Phase 1 submissions shall be unclassified and submitted as a single searchable PDF with the required bookmarks and appendices. Submit Solution Briefs electronically to: 772ESS.PKA.MACH1@us.af.mil Reference the assigned Nellis F-47 Campus AOI Notice ID in the email subject line. All questions and acquisition communications shall be directed to the Agreements Officer through the designated MACH1 correspondence address. Only authorized Government officials may modify AOI requirements or make commitments binding upon the Government. The Government reserves the right to amend or cancel this AOI, request supplemental information, limit the number of respondents advancing to subsequent phases, or make no award, consistent with applicable authority. The attached AOI establishes the controlling project-specific submission requirements and evaluation procedures.
MACH1_AOI_FA890327M1006_F-47 Future Campus at Nellis AFB
**Update 5 Nov 2026**: Added First Round Q&A Matrix **Update 1 Nov 2026**: Added Attachment F, Proposed Construction Markups and Commercial Pricing Perameters MACH1 Area of Interest: F-47 Future Campus at Nellis AFB, Rapid Delivery Progressive Design-Build The 772d Enterprise Sourcing Squadron (772 ESS), in coordination with the Air Force Civil Engineer Center (AFCEC), is seeking highly qualified Design-Build teams to deliver the Rapid Delivery Projects supporting the F-47 mission at Nellis Air Force Base, Nevada, utilizing a Progressive Design-Build (PDB) model. This Area of Interest (AOI) is issued under the Modernized Agile Construction Horizons (MACH1) Umbrella Program Notice, FA8903-OT-MACH1. Any resulting agreement will be an Other Transaction Agreement (OTA) executed under the authority of 10 U.S.C. � 2808a. Respondents shall comply with the MACH1 Umbrella Program Notice and the project-specific requirements established in the attached AOI. Program Overview The F-47 Campus at Nellis AFB is an approximately $1.057 billion total programmed military construction initiative intended to provide the facilities and infrastructure necessary to support the F-47 mission. This amount includes construction, contingency, design, construction security, and other applicable project costs and does not represent the construction agreement value available under this AOI. The present acquisition contemplates award for the Rapid Delivery Projects under Milestones 2 through 4 only, consisting of: Combined Operations and Maintenance Hangar. Reprogramming Laboratory. Simulator Facility. Aircraft Apron with Sunshades. Supporting utilities and infrastructure necessary for permanent operation of the Rapid Delivery facilities. The Government strongly prefers to select one Design-Build team capable of delivering all Rapid Delivery Projects, while reserving the right to select up to four teams if warranted by program requirements and permitted by the applicable acquisition authority. The Government also values organizations possessing the qualifications and resources to support the remaining Nellis F-47 Campus. However, selection under this AOI does not guarantee Milestone 5 or subsequent Agreement(s). Progressive Design-Build Delivery Approach The Government intends to initiate design and preconstruction services following completion of the Planning Charrette Reports establishing the initial mission requirements. The selected Design-Build team will work collaboratively with AFCEC and its Owner's Advisor to advance facility designs, evaluate alternative technical and construction solutions, develop cost and schedule strategies, and establish commercially supportable construction pricing. The Government contemplates negotiating firm-fixed-price construction agreement at approximately 65% design completion, subject to sufficient scope maturity, risk allocation, and commercial cost viability. Advanced design packages, early construction activities, and long-lead procurement may be considered where appropriately justified and authorized. AFCEC seeks a collaborative construction partner committed to delivering the greatest possible mission capability and value for the resources invested. The Government intends to consider innovative design and construction approaches, including industrialized construction methods, commercially effective Agreement commitment strategies, and practical alternatives that improve affordability and schedule performance. Three-Phase Selection Process The Government intends to conduct an expedited three-phase selection process under MACH1: Phase 1: Solution Brief. Respondents will submit qualifications and technical information demonstrating the capabilities of their actual proposed design and construction organizations. The attached AOI establishes ten project-specific technical factors and a maximum of 20 narrative pages, with separately permitted appendices. No construction price or rough-order-of-magnitude construction estimate is required during Phase 1 Submissions. Phase 2: Oral Presentations / Pitch Sessions. Selected respondents will be invited to participate in oral presentations. Detailed instructions and additional technical information will be provided to invited respondents, subject to applicable information-security requirements. Phase 3: Full Phase 3 Submission and Negotiations. The Government intends to conduct direct negotiations with selected respondent(s), subject to applicable authority and Agreements Officer approval. Commercial viability of the price will be evaluated before award. Anticipated Acquisition Schedule AOI Release: October 30, 2026. Initial Industry Questions Due: November 4, 2026. Final Industry Questions Due: November 10, 2026. Phase 1 Solution Briefs Due: November 18, 2026, at 9:00 PM Central Standard Time. Phase 2 Invitations: By December 2, 2026. Phase 2 Oral Presentations: December 14�17, 2026. Phase 3 Invitations: December 22, 2026. Phase 3 Submissions Due: January 15, 2027. Target Initial OTA Award: February 5, 2027. All dates are anticipated and subject to revision by the Agreements Officer. Submission Instructions Respondents shall review the complete attached AOI and MACH1 Umbrella Program Notice for eligibility requirements, technical factors, page limits, qualification-sheet requirements, cybersecurity provisions, and evaluation procedures. Phase 1 submissions shall be unclassified and submitted as a single searchable PDF with the required bookmarks and appendices. Submit Solution Briefs electronically to: 772ESS.PKA.MACH1@us.af.mil Reference the assigned Nellis F-47 Campus AOI Notice ID in the email subject line. All questions and acquisition communications shall be directed to the Agreements Officer through the designated MACH1 correspondence address. Only authorized Government officials may modify AOI requirements or make commitments binding upon the Government. The Government reserves the right to amend or cancel this AOI, request supplemental information, limit the number of respondents advancing to subsequent phases, or make no award, consistent with applicable authority. The attached AOI establishes the controlling project-specific submission requirements and evaluation procedures.
Fort Sill NC Gravesite Expansion and FCA Deficiencies 920CM3006
Amendment 11/5/26 to extend bid opening and publish revised IFB documents for clarity.. Construction of Gravesite Expansion and Repair of FCA Deficiencies at Fort Sill National Cemetery in accordance with the Statement of Work (SOW), drawings, and specifications.
USP Lewisburg - Repair Security Wall
THIS IS A SOURCES SOUGHT NOTICE. THIS NOTICE IS ISSUED FOR MARKET RESEARCH PURPOSES ONLY. THIS IS NOT A SOLICITATION OR INVITATION FOR OFFERORS TO SUBMIT PROPOSALS. SHOULD THIS REQUIREMENT MOVE FORWARD, A SYNOPSIS OF THEPROPOSED CONTRACT ACTION WILL BE POSTED AT A LATER DATE PROVIDING INSTRUCTIONS FOR OFFERORS TO RESPOND TO THIS OPPORTUNITY. PLEASE DO NOT RESPOND TO THIS NOTICE IF YOU ARE NOT SERIOUSLY INTERESTED AND IF YOU DO NOT PERFORM THIS REQUIREMENT. IT WILL DELAY THE POSTING OF THE SOLICITATION DUE TO FURTHER MARKET RESEARCH THAT WILL BE REQUIRED. Interested small business contractors are requested to respond to this notice by filling out and emailing completed questionnaire attachment (see attached) to Kevin Slone at kslone@bop.gov. Responses must be received no later than November 19, 2026. Interested vendors must also add their names to the Interested Vendors List for this posting in https://sam.gov Contract Opportunity (must be logged-in to your account). The Federal Bureau of Prisons (FBOP) anticipates the need for a firm-fixed-price construction contract for a project entitled Repair Security Wall, at the United States Penitentiary (USP) Lewisburg, located in Lewisburg, Pennsylvania. USP Lewisburg is federally owned facility located at 2400 Robert F. Miller Drive, Lewisburg, PA 17837. The project consists of the following: The Federal Bureau of Prisons (FBOP), United States Penitentiary (USP) Lewisburg, intends to make a single award to a responsible entity that will provide all necessary equipment, labor, materials, and incidentals necessary to repair the concrete security wall and associated expansion joints, inspect and repair brick column assemblies located at expansion joints along the perimeter concrete security wall. The work is required to restore structural stability, prevent deterioration, and maintain perimeter security standards. All work shall be performed in accordance with applicable federal, state, and local codes, Bureau of Prisons (BOP) policies, and recognized industry standards for structural concrete repair. SCOPE OF WORK (WALL RESTORATION): TECHNICAL REQUIREMENTS Wall Repair Activities Expansion Joint Repair Activities Brick Column Assembly Repair Pre-Cast Concrete Cap Replacement See the Statement of Work/Specifications attachment for the complete requirements for the project. Access to the specifications and drawings attachments will require an active https://sam.gov vendor registration (log in). If you encounter problems accessing these documents, please contact the Federal Service Desk at 866-606-8220. Interested contractors must be registered in the System for Award Management (SAM) at https://sam.gov. The North American Industrial Classification System (NAICS) code applicable to this requirement is 238140 (Masonry Contractors) with a corresponding small business standard at $19.0 million average annual receipts for the firms preceding three fiscal years. The estimated magnitude of this project lies between $1,000,000 and $5,000,000. Interested bidders must be registered in https://sam.gov. The FBOP is seeking small business contractors for this project. Your business size metrics information entered in your SAM registration must be less than or equal to the small business size standard specified above to qualify as a small business. Interested contractors are requested to respond to this notice by adding their names to the Interested Vendors List for this posting on the SAM website at https://sam.gov. You must be logged in to your vendor account in order to access the Interested Vendors List. Please add your business name only if you are interested in submitting an offer as a Prime contractor and are capable and eligible to compete for and perform this project. This notice is intended only for those who would be entering into a Prime contract with the FBOP for the entirety of the project. The FBOP has no privity of contract with subcontractors. Interested small business contractors are requested to respond to this notice by filling out and emailing completed questionnaire attachment to Kevin Slone at kslone@bop.gov. Responses must be received by November 19, 2026. Interested vendors must also add their name to the Interested Vendors List for this posting in https://sam.gov Contract Opportunity (must be logged-in to your vendor account). The synopsis of proposed contract action will include further instructions for responding to this opportunity. Interested offerors are advised to continuously monitor SAM for all future updates.
Stated in the notice: The estimated magnitude of this project lies between $1,000,000 and $5,000,000.
ID-KOOSKIA NFH-GRAVEL PROJECT
ID-KOOSKIA NFH-GRAVEL PROJECT
Fernan Ranger Station lift station electrical repair
Forest Service Fernan Ranger Station lift station electrical repairs in accordance with the statement of work. Solicitation number 1240LU26Q0125 is issued as a request for quotation (RFQ). The magnitude of the project is under $25,000.
Stated in the notice: The magnitude of the project is under $25,000.
Emergency Operations Center Savannah River Site
Sources Sought Notice/RFI for W912HP27RA010, Emergency Operations Center, Savannah River Site, SC.
Small Arms Range Project at Schenectady, NY
Pre-Solicitation Notice
Fishtrap Lake Intake Structure and Dam Rehabilitation; W91237-26-R-A020
THIS IS A NEW ACQUISITION FOR AN INTAKE STRUCTURE AND DAM REHAB AT FISHTRAP LAKE IN SHELBIANA, KENTUCKY AS SET FORTH IN THE PLANS AND SPECIFICATIONS TO BE INCLUDED IN THE SCOPE OF WORK.
W9123627BA004: NASA Wallops Breakwater Project in Wallops Island, Virginia
This is a pre-solicitation notice. This is NOT a solicitation. Do NOT submit proposals or questions in response to this notice. It is anticipated that the solicitation will be posted on Procurement Integrated Enterprise Environment (PIEE) website at https://piee.eb.mil/ by the end of November 2026. The solicitation is anticipated to be posted for 30 calendar days. The U.S. Army Corps of Engineers (USACE) Norfolk District (NAO) intends to issue an Invitation for Bid (IFB) acquisition for the NASA Wallops Shoreline Breakwaters Project in Accomack County, Virginia. This procurement will be conducted in accordance with FAR Part 14, Invitation for Bid (IFB). The Government intends to award a firm-fixed-price (FFP) contract. The requirement will be solicited as a 100% small business set aside. The applicable NAICS code is 237990, Other Heavy and Civil Engineering Construction (Dredging and Surface Cleanup Activities), with a small business standard of $45 million. In accordance with DFARS 236.204 - Disclosure of the Magnitude of Construction Projects, the magnitude of construction is between $10,000,000 and $25,000,000. DESCRIPTION OF WORK The U.S. Army Corps of Engineers � Norfolk District is seeking eligible firms capable of constructing breakwaters along the beach of Wallops Island. The number of proposed breakwaters for this project will be between two to four and placed approximately 200 feet offshore (from Mean High Water elevation). Each breakwater will be constructed of Type II rip rap for armor stone and VDOT Class III stone for core stone. The weight of material for each breakwater is approximately 10,000 tons. Breakwaters are to be placed on 12-inch-thick marine mattress with geotextile fabric. Water depths for breakwater placement range between -9.5 ft and -12.0 ft NAVD88. Each breakwater will be constructed to a crest height of +7 ft NAVD88. Material for breakwaters may be transported to the project site either by land or sea. Construction of breakwaters may occur either by land or sea. Various work restrictions are expected due to active rocket launches within the vicinity of the project site, which will require all construction activities to stop and personnel to vacate the premises for hours to day(s). The construction completion date will be approximately 325 calendar days from the issuance of Notice to Proceed (NTP). Contractors will be required to submit bid bonds documents with the proposal. The successful awardee will be required to provide 100% payment and performance bonds for the project. The effort will be solicited and awarded utilizing the Sealed Bid procedures under FAR Part 14. Anticipated solicitation issuance time frame is on or about the end of November 2026. THIS PROJECT IS A 100% SMALL BUSINESS SET ASIDE PROCUREMENT INVITATION FOR SEALED BID. The Government intends to award a firm fixed price contract using INVITATION FOR BID WITH PRE-AWARD SURVEY and procedures outlined in FAR 36 and FAR 14. Pre-award survey will determine contractor responsibility in accordance with FAR 9.104. Bidders will be evaluated on both pre-award survey and conformance to the solicitation and price. The Government reserves the right to reject any or all Bids; and to award the contract to other than the lowest total price and to award to the bidder submitting the lowest bid determined by the Government to be responsible. Bid bonds will be required with bid submittals. In addition, the awardee must be found responsible in accordance with FAR 9.1. The below Pre-Award Survey Information will be requested of the apparent low offeror. This information is not required to be responsive to the Invitation for Bid. a) Current commitments and expected dates of completion. b) One (1) signed bank reference demonstrating adequate financial resources. If bidder�s firm has a line of credit � provide information on how many figures bidder can borrow against the line of credit (i.e. medium 6 figures � exact line of credit is not required). c) The bidder shall provide the latest three (3) complete fiscal year financial statements for the prime contractor, certified by an independent accounting firm, if practicable, or signed by an authorized officer of the organization. Submit evidence of availability of working/operating capital, which will be used for the performance of the resultant contract. For Joint Venture arrangements, submit the latest three complete fiscal year financial statements for each company in the Joint Venture and discuss the financial responsibilities among the companies. The Government may also utilize Dun & Bradstreet reports to evaluate the financial capacity of the bidder. This notice does not constitute an invitation for bid. The IFB and accompanying documents will be issued electronically and will be uploaded to the Procurement Integrated Enterprise Environment (PIEE) website at https://piee.eb.mil/ on or about the end of November 2026. Notification of any changes to this pre-solicitation will only be made on this website. Therefore, it is the offerors responsibility to check the website regularly for any posted changes to the pre-solicitation notice, release of the solicitation, specification, drawings, and all subsequent amendments. Telephone calls or written requests for the IFB package will NOT be accepted. Prospective bidders are responsible for monitoring at https://piee.eb.mil/ to respond to the solicitation and any amendments or other information regarding this acquisition. IT IS THE SOLE RESPONSIBILITY OF THE OFFEROR TO CONTINUALLY VIEW THE WEBSITE FOR CHANGES. No hard copies will be available. Prospective bidders are responsible for monitoring SAM.gov to respond to the solicitation and any amendments or other information regarding this acquisition. Prospective bidders are required to be registered in SAM when submitting an offer and shall continue to be registered until time of award, during performance, and through final payment of any contract. NOTE: Online Representations and Certifications Applications apply to this solicitation. Inquires must be directed to ProjNet in accordance with the forthcoming Solicitation document.
Stated in the notice: In accordance with DFARS 236.204 - Disclosure of the Magnitude of Construction Projects, the magnitude of construction is between $10,000,000 and $25,000,000.
Y--EAST CANAL EFFICIENCY IMPROVEMENTS
EAST CANAL EFFICIENCY IMPROVEMENTS
Y--HAVO 326181 Rehabilitate Rainshed&Water Treatment
Amendment 3. HAVO 326181 Rehabilitate Rainshed & Water Treatment System located at Hawaii Volcanoes National Park, Volcano, Hawaii
Unaccompanied Personnel Housing Restoration at NSB Kings Bay, GA
THIS IS A SOURCES SOUGHT ANNOUNCEMENT, A MARKET SURVEY FOR WRITTEN INFORMATION ONLY TO IDENTIFY POTENTIAL OFFERORS FOR A DESIGN-BID-BUILD CONSTRUCTION PROJECT TO RENOVATE THE UNACCOMPANIED ENLISTED PERSONNEL HOUSING QUARTERS (BUILDINGS 1042, 1044, 1045, 1046 AND 1054) LOCATED AT NAVAL SUBMARINE BASE (SUBBASE) KINGS BAY, GA. THIS IS NOT A REQUEST FOR PROPOSALS OR AN INVITATION FOR BID. NO CONTRACT WILL BE AWARDED FROM THIS ANNOUNCEMENT. NO REIMBURSEMENT WILL BE MADE FOR ANY COSTS ASSOCIATED WITH PROVIDING INFORMATION IN RESPONSE TO THIS ANNOUNCEMENT OR ANY FOLLOW-UP INFORMATION REQUESTS. No telephone calls will be accepted requesting a bid package or solicitation. There is no bid package or solicitation currently available. In order to protect the procurement integrity of any future procurement that may arise from this announcement, information regarding the technical point of contact will not be given and no appointments for presentations will be made. The reference number for this posting is N6945027RUPHR. The purpose of this notice is for the Naval Facilities Engineering Systems Command Southeast (NAVFAC SE) to gain knowledge of ALL qualified and interested parties. All socioeconomic categories are encouraged to respond: U.S. Small Business Administration (SBA) certified 8(a), SBA certified HUBZone, woman-owned small business (WOSB), veteran-owned small business (VOSB), and service disabled veteran-owned small business (SDVOSB). Potential sources should have current relevant qualifications, experience, personnel, and capability to perform this proposed project. The Government may use the sources sought responses along with other market research to make various determinations regarding the procurement. Project Description: This project will include, but is not limited to, renovate the Unaccompanied Enlisted Personnel Housing Quarters (Buildings 1042, 1044, 1045, 1046 and 1054) located at Naval Submarine Base (SUBBASE), Kings Bay, Georgia. Buildings 1042, 1044, 1045 and 1046 were constructed in 1984. Building 1054 was constructed in 1989. The project scope includes upgrades to mechanical systems, fire protection, fire alarms, bathrooms, and exterior renovation. Except for Air Handling Units (AHU) in Buildings 1042, 1044 and 1046, all mechanical systems are being upgraded under this project. Mechanical system repairs include replacement of HVAC AHUs, installing Direct Digital Controls (DDC) for temperature and humidity, replacement of chilled water (CHW) piping, circulation pumps and cleaning of ductwork. Plumbing repairs include the replacement of plumbing fixtures, domestic water piping and sanitary piping. Electrical system repairs include replacement of electrical service panels throughout the building. Electrical repairs also include replacement of lighting fixtures with LED fixtures and replacement of wiring and wiring devices where they do not meet the current codes. Exterior renovation includes replacement of gutters, windows, doors, safety railings, lights. Interior renovation includes remodeling of bathrooms, mold remediation, and cleaning and painting of all previously painted surfaces. Ceilings and non-loadbearing walls will be demolished and rebuilt as required to allow access to rebuild mechanical and plumbing ductwork and pipes. The project also requires the design for abatement of hazardous material. The hazardous materials survey has been conducted by the industrial hygiene professionals, and the findings of the survey are included in the report. The anticipated performance period for this contract will be 1200 calendar days. The magnitude of construction is between $25,000,000 and $50,000,000. The anticipated award date is fourth Quarter FY 27. Interested sources are invited to respond to this Sources Sought announcement. Capability Statements consisting of appropriate documentation will be accepted providing it contains ALL the information required below (items 1-7). Complete submission package shall not exceed 6 pages. The information which must be contained in your response is as follows: 1) Contractor Information: Name and address of company, point of contact with phone number and email address. 2) Type of Business: Identify the company�s business size and socio-economic status (HUBZone, 8(a), SDVOSB, WOSB, etc.) if applicable for NAICS Code 236200 applicable to this sources sought. If your firm is claiming HUBZone or 8(a) status, provide a copy of your SBA certification. 3) Bond Capacity: Information must include surety�s name, point of contact, telephone number, email address, and the bonding capacity of at least $50 Million per project, and the maximum aggregate bonding. 4) System for Award Management (SAM): Evidence of registration in the SAM, including Cage Code and Unique Entity Identifier. 5) Interest: Indicate if a solicitation is issued will your firm/company be submitting a proposal: _____ Yes ______No. 6) Existing Contract Vehicles your firm may have (GWAC, FSS, MACC, MATOC, etc.) available for this work. 7) Experience Submission Requirements: Responders shall provide a minimum of three (3) to a maximum of five (5) projects demonstrating Prime construction experience demonstrating the specific capabilities listed below: Executing construction or major renovations of multi-story, multi-unit living quarters facilities including dormitories, multi-family housing, hotels, office buildings or other similar types of construction. Projects submitted for the Offeror shall be valued at $20 million or greater and/or 30,000 square feet or greater. Completed within the past seven (7) years of the date of issuance of this announcement. Provide a brief description including contract number, project title, completion date, performance ratings, and final contract value. If they are not approximately equal to the requested dollar value, identify the dollar value and explain in no more than one paragraph why we should consider the project. The response to this sources sought is not expected to be a proposal, but rather short statements regarding the company�s ability to demonstrate experience in relation to the areas specified herein. Submission of Capabilities statement is not a prerequisite to any potential future offerings, but participation will assist the Government in tailoring requirements to be consistent with industry capabilities. Please respond to this announcement no later than 23 NOV 2026, 2:00 PM Eastern Time via email to Darrien Thomas at darrien.a.thomas.civ@us.navy.mil and Aimee Johnson at aimee.n.johnson2.civ@us.navy.mil. The subject line of the email shall state: Unaccompanied Personnel Housing Restoration, NSB Kings Bay. Emails shall be no more than 5 MB in size. Responses that do not meet all requirements or are not submitted within the allotted time will not be considered. Respondents will not be notified of the results of the evaluation.
Stated in the notice: The magnitude of construction is between $25,000,000 and $50,000,000.
Repair Auto Maintenance Facility Bldg 575 (230040)
Only General MACC Contractors listed on the General Requirements cover page may submit a proposal for this ROICC Camp Lejeune area of responsibility project. See attached documents for scope of work and any applicable drawings.
Design-Build Renovation of Building 164, Outdoor Recreation Center, Homestead Air Reserve Base, Florida
The Department of the Air Force intends to award a firm-fixed-price design-build construction contract for renovation of the Outdoor Recreation Facility, Building 164, at Homestead Air Reserve Base, Florida. IAW DAFMAN 64-119, NAF Contracting Procedures, Small Business programs do not apply to NAF Contracting actions. This is a non-appropriated fund purchase, and it does not obligate appropriated funds of the Unites States Government. Non-appropriated funds are generated by the military community through the sale of goods and services and the collection of fees and charges for participation in military community programs. This purchase does not involve federal tax dollars. IAW DAFMAN 64-119, NAF Contracting Procedures, Para 2.8 NAF Procurement Exemptions, Title 15 U.S.C. Section 631 et seq., also known as the Small Business Act, as amended, and Federal Acquisition Regulation guidance relative to small business along with other award-preference programs. NAF contracts are awarded to the firm whose proposal is most advantageous to the NAFI. The Contractor shall furnish all labor, supervision, materials, equipment, transportation, design and engineering services, tools, permits, testing, inspections, quality control, warranties, and closeout documentation necessary to complete the work in accordance with the solicitation, Statement of Work, drawings, specifications, and all attachments. The requirement includes design-build services for renovation and improvement of Building 164. Work includes, but is not limited to, preparation of design documents; demolition; roofing and exterior-envelope improvements; doors, windows, exterior walls, and drainage work; interior renovations; mechanical, plumbing, electrical, and lighting work; site improvements; testing; inspections; warranties; and closeout documentation. The solicitation will include a base requirement consisting of Phases 1 and 2 and a separately priced Option 1 for Phase 3. The specific requirements for the base requirement and Option 1 are identified in Section B and the Statement of Work. NAICS Code: 236220 � Commercial and Institutional Building Construction Size Standard: $45.0 Million Average Annual Receipts PSC: Y1JZ � Construction of Miscellaneous Buildings Place of Performance: Homestead Air Reserve Base Building 164 Homestead, Florida Contract Type: Firm-Fixed-Price, Design-Build Construction Magnitude of Construction: Between $250,000 and $500,000 Period of Performance: 360 calendar days after issuance of the Notice to Proceed. SITE VISIT: A site visit will be held on 10 November 2026 at 10:00 a.m. Eastern Time. Attendance is strongly encouraged but is not mandatory. Offerors planning to attend shall submit the completed base-access form no later than 5 November 2026 at 10:00 a.m. Eastern Time. At this time, Homestead Air Reserve Base is processing site-visit access requests for United States citizens only. Site-visit directions have been posted to this posting. Offerors that do not attend the site visit remain responsible for becoming familiar with existing conditions, site access restrictions, facility operations, utility conditions, material-staging limitations, and all other conditions that may affect performance. Google Maps Link: https://maps.app.goo.gl/ivLWZZMdBPCdnQMU7 QUESTIONS: Questions concerning this solicitation shall be submitted in writing to Tahj Guilford at tahj.guilford.2@us.af.mil no later than 13 November 2026 at 10:00 a.m. Eastern Time. Questions received after the stated deadline may not be answered. The Government anticipates posting responses to timely submitted questions on or about 18 November 2026 at 3:00 p.m. Eastern Time. PROPOSAL SUBMISSION: Offerors shall submit proposals electronically to tahj.guilford.2@us.af.mil no later than 23 November 2026 at 12:00 p.m. Eastern Time. Proposals shall be submitted in the format required by Sections L and M of the solicitation. Offerors are responsible for ensuring proposals are received by the Government before the closing date and time. The Government intends to make award without discussions but reserves the right to conduct discussions if determined to be in the Government�s best interest. All amendments to this solicitation will be posted through SAM.gov. Offerors are responsible for monitoring SAM.gov for amendments and acknowledging all amendments with their proposal. The full solicitation package, including the SF 1442, Statement of Work, pricing schedule, drawings, specifications, wage determination, and other attachments, are available with this notice.
Construction Services for the Gate 7 Parking Garage St. Elizabeths West Campus
Amendment 0003 is hereby posted. ________________________________________________________________________ Amendment 0002 is hereby posted. ________________________________________________________________________ Amendment 0001 is hereby posted. ________________________________________________________________________ The General Services Administration (GSA), Public Buildings Service (PBS), is seeking a qualified contractor for construction services for the Gate 7 Parking Garage at the St. Elizabeths West Campus in Southeast Washington, DC. GSA anticipates awarding a single Firm-Fixed-Price construction contract for the new construction of the Gate 7 Parking Garage and associated site, utility, security, stormwater, landscape, and infrastructure improvements. The project will support the operational needs of the U.S. Department of Homeland Security (DHS) at the St. Elizabeths West Campus. This acquisition is for construction services only. The project design is being completed separately by GSA�s Architect of Record, ZGF. The construction solicitation is based on Issued for Construction drawings, specifications, and related contract documents. The work to be performed under the terms of this contract includes, but is not limited to, furnishing all management, supervision, subcontractors, labor, materials, supplies, tools, equipment, coordination, quality control, testing, inspections, commissioning support, and closeout documentation necessary to construct the Gate 7 Parking Garage in accordance with the contract documents. The project includes construction of a new multi-level parking garage with associated surface parking, access and screening infrastructure, and related campus improvements. The anticipated scope includes, but is not limited to: Site development, clearing, grading, excavation, and civil infrastructure improvements Utility relocations, extensions, tie-ins, and connections Substructure construction, including foundations, slab-on-grade, excavation support, waterproofing, and retaining walls Parking garage structure, including structural framing, parking decks, ramps, stairs, elevators, roof assemblies, and related structural components Mechanically ventilated parking garage systems, including ventilation equipment, shafts, ductwork, louvers or openings, controls, electrical power, life-safety interfaces, testing, balancing, and commissioning support Exterior fa�ade and building envelope construction, including a classical architectural brick fa�ade with openings Exterior doors, windows, louvers, waterproofing, sealants, flashings, and related envelope components Mechanical, electrical, plumbing, fire protection, fire alarm, emergency communications, lighting, controls, IT, telecommunications, electronic security, access control, CCTV, parking guidance, and related systems Physical security elements, including vehicle barriers, bollards, gates, credentialing areas, and screening-related infrastructure Roadway, shuttle, pedestrian circulation, hardscape, landscape, site lighting, signage, and related site improvements Stormwater management facilities, erosion and sediment control, and environmental protection measures Testing, inspections, commissioning support, training, warranties, as-built documentation, BIM/COBie deliverables where applicable, and project closeout The Gate 7 Parking Garage will be constructed within the active St. Elizabeths West Campus, a high-security federal campus and National Historic Landmark. The contractor will be required to coordinate construction activities with ongoing campus operations, security requirements, occupied facilities, existing utilities, shuttle operations, adjacent work, traffic and access impacts, and protection of historic and environmental resources. The contractor may also be required to coordinate with District of Columbia agencies or authorities, as applicable, for traffic control, haul routes, public space, utility, roadway, permit, or other construction-related requirements. All work shall conform to applicable GSA requirements, the 2026 PBS Core Building Standards, contract drawings and specifications, campus security requirements, applicable codes and standards, and project-specific requirements. The estimated cost range for construction is between $120,000,000.00 and $160,000,000.00. The intended project delivery method is a Phased Acquisition procurement using a Two-Phase Construction Concept. AMENDMENTS TO SOLICITATION: It is the offeror's responsibility to monitor SAM.gov for the release of any amendments. BONDING: A bid bond is required in Phase 2 as well as payment and performance bonds after award. SECURITY: Before employees are allowed to work under the anticipated contract, all personnel are required to pass a security check. Specific security requirements will be contained in the solicitation. FUNDS AVAILABILITY: Funds are not presently available for this contract. The Government�s obligation under this contract is contingent upon the availability of appropriated funds from which payment for contract purposes can be made. No legal liability on the part of the Government arises until award of the contract. ELIGIBLE OFFERORS: All responsible business firms may submit a proposal which shall be considered by the agency. All prospective offerors are also required to use the System for Award Management at SAM.gov for registering their firm and completing representations and certifications. Any questions regarding this notification shall be directed to Jennifer Silkensen, Contracting Officer, via email at jennifer.silkensen@gsa.gov. Potential offerors are responsible for monitoring and downloading the solicitation and any potential amendments, if any, to the solicitation.
FY27 Multiple Award Task Order Contract, SEED PROJECT NO: 550-25-108, Renovate Bathrooms in B103 PRRTP & B64/7 at the VA Illiana Health Care System (VIHCS), Danville IL.
Amendment 0004 to VA Illiana Health Care System (VIHCS), Danville IL. Solicitation 36C25227R0001
USCG ISA Tenant Improvement Construction Project
THIS IS A SOURCES SOUGHT NOTICE ONLY. This is not a solicitation or a request for proposal and no contract will be awarded from this notice. No solicitation or specifications are available at this time. Please monitor sam.gov as this Sources Sought Notice will not be linked to the solicitation. The General Services Administration (GSA), Acquisition Project Delivery Division, is conducting market research to determine if any SDVOSB, HUB Zone, EDWOSB or 8(a) Small Business Concern has the current relevant qualifications, experience, personnel, and capability to perform the work described herein. All interested Small Business firms should respond. This Sources Sought Notice is being issued by the General Services Administration (GSA), Acquisition Project Delivery for tenant fit-out Construction services for the United States Coast Guard (USCG) Northeast District to support mission-critical operations across the Northeast maritime region. The place of performance will be the John F. Kennedy (JFK) Federal Building (FB), located at 15 New Sudbury St, Boston, MA 02203. This is a Repair and Alteration (R&A) project which includes operational, administrative, secure, forensic, and mission-support spaces, with construction of a specialized Sensitive Compartmented Information Facility (SCIF) being a particularly important element. Work also includes integrated mission-specific systems such as reliable power, 24/7 HVAC, communications/IT infrastructure, security systems, laboratory support, resilient infrastructure, and an emergency generator. Contractors should anticipate a complex, schedule-sensitive federal fit-out requiring secure construction practices, specialized space coordination, and close integration of architectural, mechanical, electrical, communications, security, and technology systems. Estimated Construction Cost Range is $15,000,000 and $25,000,000.00. Period of Performance is approximately 36 months from date of Notice to Proceed. NAICS Code: Construction of Buildings - 236220 - Commercial and Institutional Building Construction with a size standard of $45 Million. PSC Code: Z2AA -- Repair or Alteration of Office Buildings All qualified Small Businesses are encouraged to respond. Respondents will not be notified of the results of the evaluation. The main purposes of this Sources Sought Notice is to assist the Contracting Officer in determining if a Set-Aside is the acceptable strategy for the procurement. It is requested that interested parties submit a brief capabilities package. The package shall address, at a minimum, the following: Examples of projects worked within the last five years of similar size, scope, complexity and duration as the work indicated. State whether your firm worked as a prime or subcontractor, contract value, brief description of how the referenced contract relates to the work described and provide an agency or owner point of contact. Company profile, to include number of employees, annual receipts, office location(s), and SAM UEI. Evidence to establish your company's standing as a SDVOSB, HUBZone, EDWOSB or 8(a) small business concern, under applicable NAICS. Describe how you will provide a fair market price given the geographical location of this project. A positive statement of your intention to submit a bid for this requirement if set-aside for your socio-economic group. AGAIN, THIS IS NOT A REQUEST FOR PROPOSALS. Responses must contain sufficient detail for the Government to make an informed decision regarding your capabilities. Responses must be received no later than 2:00 PM, Local Time on November 23, 2026. Please submit your capability statement via e-mail to Molly A. Lewis, Contract Officer, at Molly.Lewis@gsa.gov. Questions regarding this notice may be addressed to Molly.Lewis@gsa.gov. Failure to submit all information requested will result in a contractor not being considered as an interested small business concern.
Atchison Storm Sewer Separation Improvements, Atchison, Kansas
The purpose of this amendment is to extend the bid opening date and amend the Specifications SETION 01 30 00 Paragraph 1.5.2 (attached).The U.S. Army Corps of Engineers, Kansas City District, Intends to issue an invitation for bid (IFB) solicitation for construction activities for storm sewer separation and improvements. The work covered by this contract consists of furnishing all equipment, labor, operators, supervision/ site superintendent, quality control, supplies, materials, and incidentals necessary to satisfactorily perform related work, including pavement, sidewalk, driveway, and parkway restoration. RTA Plans and Specs have been included as separate attachments. * The Supplemental Bid Schedule Attachment has been added.