Construction — open bids
557 open bids, newest first. Full details live here — you only leave for the official posting when you bid.
Progressive Design-Build (PDB) - USSF Integration Facility F/10852 at WPAFB
ConstructionSpecial Notice
Closes Nov 30, 2026 · 11:00 AM ET
JOHN DAY DAM NAVIGATION LOCK TAINTER VALVE (TV) REPAIRS TV3 AND TV4
ConstructionSolicitation
Closes Nov 30, 2026 · 11:00 AM
Progressive Design-Build (PDB) - RENOVATE HQ AFMC B/10262 PH 2 at WPAFB
ConstructionSpecial Notice
Closes Nov 30, 2026 · 11:00 AM ET
Houston Ship Channel (HSC) Expansion Channel Improvement Project (ECIP) 11, Package 9, Segment 4 Boggy Bayou to Sims Bayou
ConstructionSolicitation
Closes Dec 1, 2026 · 2:00 PM
Project No. 640A0-27-104, Replace Roof at Building 347 - Menlo Park
ConstructionCombined Synopsis/SolicitationService-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside (FAR 19.14)
Closes Dec 1, 2026 · 1:00 PM
WTX Elevator Inspections and Load Testing Services (Amended)
ConstructionCombined Synopsis/SolicitationService-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside (FAR 19.14)
Closes Dec 1, 2026 · 1:00 PM
Provision of Services for Supply and Installation of Swimming Pool Tiles at US Consulate General Karachi
ConstructionSolicitation
Closes Dec 2, 2026 · 3:00 PM
Repair Sanitary Waste Piping at the Mann-Grandstaff VA Medical Center
ConstructionSolicitationService-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside (FAR 19.14)
Closes Dec 2, 2026 · 9:00 AM
Design-Build Maintenance and Repair Army Reserve (MRAR) of Equipment Concentration Site (ECS), B-56767, at North Fort Hood, TX
ConstructionSolicitationSmall Business Set Aside - Total
Closes Dec 2, 2026 · 2:00 PM ET
PIP-II F-37 BUILDING LWC PUMP ROOM PIPING SYSTEM INSTALLATION
ConstructionSolicitationNo Set aside used
Closes Dec 3, 2026 · 2:00 PM
Design-Build Modernization of the LPOE in Lynden, Washington Sources Sought
ConstructionSources Sought
Closes Dec 3, 2026 · 2:00 PM
LOWER BRULE NORTH SHORELINE STABILIZATION AND ECOSYSTEM RESTORATION, ELEMENT 2
ConstructionSolicitationSmall Business Set Aside - Total
Closes Dec 3, 2026 · 2:00 PM
FY29 PN108808 Nonorganizational Vehicle Parking Garage at Tripler Army Medical Center on Oahu, Hawaii
ConstructionSolicitation
Closes Dec 4, 2026 · 2:00 PM
RFI USMMA Campus Modernization Program SATOC Seawall Project
ConstructionSources Sought
Closes Dec 4, 2026 · 4:00 AM ET
Seawater Pump Renovation
ConstructionSolicitationSmall Business Set Aside - Total
Closes Dec 7, 2026 · 12:00 PM ET
Demolition of an existing building, Site Improvements and construction of a Modular Office Building at the US Merchant Marine Academy Campus, Kings Point, NY
ConstructionSolicitationSmall Business Set Aside - Total
Closes Dec 7, 2026 · 2:00 AM ET
NRM-CONST | 528A4-27-202 Salt Barn Batavia | FY27 NRM
ConstructionSolicitation
Closes Dec 7, 2026 · 11:00 AM ET
RM16-1405 BUILDING 592 RENOVATIONS
ConstructionSolicitation8(a) Set-Aside (FAR 19.8)
Closes Dec 8, 2026 · 2:00 PM ET
Project 695-24-107 Replace Boilers 4 and 5 Clement J. Zablocki, VA Medical Center 5000 West National Avenue Milwaukee, WI 53295
ConstructionSolicitationService-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside (FAR 19.14)
Closes Dec 9, 2026 · 11:00 AM
LOCK AND DAM 25 NEW 1,200 FT LOCK NAVIGATION AND ECOSYSTEM SUSTAINABILITY PROGRAM (NESP)
ConstructionSolicitation
Closes Dec 9, 2026 · 10:00 AM
Electric Power Resiliency Building 56
ConstructionCombined Synopsis/SolicitationSmall Business Set Aside - Total
Closes Dec 9, 2026 · 1:00 PM ET
Renovate Building 1203-DOAS/AHU and Fire Suppression Water System, March Air Reserve Base, California
ConstructionSolicitationSmall Business Set Aside - Total
Closes Dec 10, 2026 · 10:00 AM ET
B422 BREAKROOM, B300 BDOC
ConstructionSolicitationSmall Business Set Aside - Total
Closes Dec 10, 2026 · 1:00 PM ET
Cooling Tower, Roofing, and Structural Construction
ConstructionSolicitationSmall Business Set Aside - Total
Closes Dec 11, 2026 · 12:00 PM