Construction — open bids
557 open bids, newest first. Full details live here — you only leave for the official posting when you bid.
FY27 NRM RENOVATE SURGICAL SUITE PHASE II
DLA DWCF B1907 Backup Power Generator, Yokosuka, Japan
Operations Mechanical BPA
MOD/MODE/US BYPASS CANAL REPAIRS
High Temp Hot Water Distribution System and Heat Plant Suite of Repairs to the US Air Force Academy COLORADO
TO'HAALI' SCHOOL REPLACE FRONT ENTRANCE SIDEWALK
Tohaali School REPAINT EXTERIOR WALLS BLDG. 102
NJ-NY ERFO FW WARI 2019-1(1) - Wallkill River National Wildlife Refuge
SEPA PARKING LOT REPAVING AND REPAIRS
FY27 NRM - Correct Mather Loop Road and Install Speed Bumps
P210 ELECTRIC POWER PLANT AND ELECTRICAL DISTRIBUTION SYSTEM AT CHABELLEY AIRFIELD, DJIBOUTI
561-24-600 Upgrade Mechanical Systems-C Level
Integrated Design Build Initial Outfitting (iDBIO) Multiple Award Task Order (MATOC) 6.0 Design Build (DB) Construction in Support of Defense Health Agency (DHA)
Elevator Repair and Maintenance Support Services
NMAH: 2027 Install Emergency Generator
Project # 926CM3010 - Cemetery Expansion and Improvements at Washington Crossing National Cemetery
Y--COTP Series Capacitor Two-Phase Design Build
SABER V Hill AFB
Replace Boilers at FDC Philadelphia
Wilson Hall Floor 16 Electric and Elevator Machine Rooms Fire Rating and Mechanical Upgrade
Atchison Storm Sewer Separation Improvements, Atchison, Kansas
The purpose of this amendment is to extend the bid opening date and amend the Specifications SETION 01 30 00 Paragraph 1.5.2 (attached).The U.S. Army Corps of Engineers, Kansas City District, Intends to issue an invitation for bid (IFB) solicitation for construction activities for storm sewer separation and improvements. The work covered by this contract consists of furnishing all equipment, labor, operators, supervision/ site superintendent, quality control, supplies, materials, and incidentals necessary to satisfactorily perform related work, including pavement, sidewalk, driveway, and parkway restoration. RTA Plans and Specs have been included as separate attachments. * The Supplemental Bid Schedule Attachment has been added.
Atchison Storm Sewer Separation Improvements, Atchison, Kansas
The purpose of this amendment is to extend the bid opening date and amend the Specifications SETION 01 30 00 Paragraph 1.5.2 (attached).The U.S. Army Corps of Engineers, Kansas City District, Intends to issue an invitation for bid (IFB) solicitation for construction activities for storm sewer separation and improvements. The work covered by this contract consists of furnishing all equipment, labor, operators, supervision/ site superintendent, quality control, supplies, materials, and incidentals necessary to satisfactorily perform related work, including pavement, sidewalk, driveway, and parkway restoration. RTA Plans and Specs have been included as separate attachments. * The Supplemental Bid Schedule Attachment has been added.
Tobyhanna Gates & Turnstiles
THERE HAS BEEN TWO AMENDMENT TO THIS SOLICITATION AS OF 11/09/2026 SEE PERFORMANCE WORK STATEMENT FOR DETAILS PART 1 � GENERAL INFORMATION 1. General This is a non-personal service(s) contract under which the personnel rendering the service(s) are not subject, either by the contract's terms or by the manner of its administration, to the supervision and control usually prevailing in relationships between the Government and its employees. 1.1 Description of Services/Introduction This is a non-personal service(s) contract to provide Gates, Barriers, and Turnstiles Service and Maintenance. The Contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform service and maintenance on vehicle gates, barriers, and personnel turnstiles at Tobyhanna Army Depot as defined in this Performance Work Statement except for those items specified as government furnished property and services. 1.2 Background Tobyhanna Army Depot (TYAD) relies on a comprehensive physical security infrastructure to protect personnel, equipment, and mission-critical assets. The vehicle gates, barriers, and personnel turnstiles are essential components of this infrastructure. Consistent preventative maintenance, emergency repair, and targeted technical upgrades are required to ensure continuous operational readiness and compliance with DoD physical security standards. 1.3 Scope The Contractor shall provide non-personal service(s). The Contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items necessary to perform services as described in this PWS and associated contract documents, except for those items specified in Part 3 Government Property and Services. The Contractor shall perform to the standards and acceptable quality levels identified in this PWS and associated contract documents. 1.4 Objectives Ensure all gates, barriers, and turnstiles are adequately maintained to prevent failures and extend equipment lifecycle. Return damaged or degraded devices to full service quickly through a 24/7 emergency response capability. Maintain reliable function when activated to secure Tobyhanna Army Depot perimeters. Complete initial technical baseline repairs and upgrades safely and efficiently.
OK FW TSM 10(1) NFH Entrance Road and Parking Improvements
PROJECT NUMBER: OK FW TSM 10(1) PROJECT NAME: NFH Entrance Road and Parking Improvements PROJECT DESCRIPTION: The Tishomingo National Fish Hatchery (NFH) is in south-central Oklahoma off SH 7 on a 220-acre U.S. Fish and Wildlife Service (FWS) facility approximately 8 miles northwest of the Town of Tishomingo. The project will address deteriorated pavement for the entrance loop, adding a small parking area at the northeast corner of the entrance loop, and pavement of the entrance road and parking area south of HWY 7. The 3R project will provide new driving surface, entrance gates, culverts, Architectural Barriers Act (ABA) compliant parking spot, and ABA compliant curb ramp. SCOPE OF THE WORK: The project will consist of full depth reclamation of the existing roads asphalt to a depth of 6-in, paving 3-in of asphalt, super elevation correction, and culvert replacement. New parking areas will be constructed with new aggregate base and asphalt pavement. A concrete ABA compliant curb ramp and ABA compliant parking spot. Concrete aprons will be placed around existing structures to match existing. Two new gates at the entrances to the NFH will also be installed. Entrance roads and parking areas will be closed during construction. PRINCIPAL WORK ITEMS: 30402-5300 Full Depth Reclamation Method 2, 6-inch depth: 6,800 SQYD 40301-0100 Asphalt Concrete Pavement, 1,250 TON 20401-0000 Roadway Excavation, 400 CUYD