Category Bids

Construction — open bids

557 open bids, newest first. Full details live here — you only leave for the official posting when you bid.

Riley Infantry Platoon Battle Course Construction

Department of Defense · W071 Endist Kansas CITY  |  Fort Riley, Kansas  |  Posted Nov 10, 2026
ConstructionSources Sought

The U.S. Army Corps of Engineers, Kansas City District intends to solicit and award a Design-Bid-Build (DBB) contract for the construction of an Infantry Platoon Battle Course (IPBC) on Ft Riley, Kansas. The Government proposes to issue a single firm fixed price type contract for this project. THIS SOURCES SOUGHT NOTICE IS FOR MARKET RESEARCH AND PLANNING PURPOSES ONLY. THIS DOES NOT CONSTITUTE A SOLICITATION AND SHALL NOT BE CONSTRUED AS A COMMITMENT BY THE GOVERNMENT TO AWARD A CONTRACT FROM RESPONSES TO THIS ANNOUNCEMENT, NOR DOES IT OBLIGATE THE GOVERNMENT TO PRODUCE A SOLICITATION IN THE FUTURE. ANY INFORMATION SUBMITTED BY INTERESTED PARTIES IS STRICTLY VOLUNTARY AND NO MONETARY COMPENSATION WILL BE PROVIDED FOR RESPONSE PREPARATION OR FOLLOW UP REQUESTS. The purpose of this Sources Sought Notice is to obtain insight into the interest, capabilities, and qualifications of firms to perform a firm fixed price Design-Bid-Build construction type contract of this magnitude and to determine if there is adequate competition to compete and successfully perform. The scope of this Design-Bid-Build (DBB) contract is for the construction of an IPBC and a Range Operations and Control Area (ROCA). The range area consists of six separate objectives (consisting of a variety of bunkers, trenches, and shoot houses) with reconfigurable portable targets, which will provide training and test infantry platoons on mounted and dismounted movement techniques and operations. In addition to downrange target/range features, supporting access road, supporting downrange target service roads are required. The ROCA supporting facilities include a range control tower, small after-action review facility (AAR), operations storage building, covered mess, ammo breakdown building, latrine, covered bleacher, and a battery building. ACQUISITION STRATEGY The Government anticipates a single, firm fixed price type contract for this project. The selection will use a single phase Request for Proposal (RFP) using Best Value that is determined to be the most beneficial to the Government. The magnitude of this project is between $10,000,000.00 and $15,000,000.00. The applicable North American Industrial Classification System (NAICS) for this procurement is 236220 - Commercial and Institutional Building Construction which has a $45M size standard. COVER LETTER: 1. Offeror's name, address, point of contact, phone number, and e-mail address. 2. Firm's Unique Entity Identifier. 3. Offeror's interest in providing a proposal if a solicitation is issued. 4. Offeror's capability to perform a contract of this magnitude and complexity. 5. Offeror's type of business and business size in accordance with the NAICS code 236220. 6. If a Small Business, specify if your company is any of the following: (a) Service Disabled Veteran Owned Small Business (SDVOSB); (b) HUBZone Small Business; (c) 8(a) Small Business concern; or (d) Woman-owned Small Business. SOURCES SOUGHT QUESTONS: 1. Prior Experience. Prior experience with construction of projects that have similar scope and magnitude. Provide examples with summaries of past performance on a minimum of (3) three projects for the construction of ranges, IPBCs, and similar facilities within the last (10) ten years by including as much of the following information as possible: (a) Dollar amount of the contract. (b) Design-Bid-Build construction experience. (c) Large commercial construction ranges, IPBCs, and other supporting work. (d) Brief description of the technical requirements of that project. (e) Description of the work that was performed and whether it was self performed or performed by a subcontractor; if performed by a subcontractor, identify subcontractor. (f) Indication of how long the services took to complete from start to finish. (g) Name, address, point of contact and phone number of customer organization for which the work was done. 2. Joint Venture information, if applicable - existing and potential. 3. Bonding Capability. Construction bonding level per contract and aggregate construction bonding level, both expressed in dollars. 4. The Government is considering award of this requirement under Other Transactions (OT) utilizing a Construction Management at Risk (CMAR) acquisition strategy. What is your firm�s confidence in approaching this requirement under CMAR-OT? Contractors may submit examples of work done by a subcontractor if that subcontractor intends to enter into a letter of commitment with the contractor. The response must be specific to the qualifications listed above to show that the respondent is qualified and possesses the necessary skills, experience, and capabilities. If a response does not clearly demonstrate that the respondent meets the qualifications, possess the necessary skills, experience, and capability the response will not be considered as confirmed capability for the purposes of market research which will be used to support procurement planning initiatives. Please respond by November 20, 2026, at 11:00 a.m. local time, with response limited to nine (9 pages), including cover letter. Send your response to Jacob Keenlance via email, Jacob.C.Keenlance@usace.army.mil and copy Stephanie Kretzer at Stephanie.R.Kretzer@usace.army.mil

Stated in the notice: The magnitude of this project is between $10,000,000.00 and $15,000,000.00.

Closes Nov 20, 2026 · 11:00 AM
Read more →

Barriers and Bunkers

Department of Defense · FA5682 31 CONS (Unit 6102)  |  Aviano Air Base, IT-PN  |  Posted Nov 10, 2026
ConstructionSources SoughtNo Set aside used

This is notice is purely a sources sought, as such no award will be generated directly from this posting or any correspondence genereated from this posting. Aviano AB is looking to gauge market interest/capability in providing passive defense capabilities. As such we are asking interested vendors to send the contracting officer associated with this posting a capability statement/document with a breakdown of your capabilities in terms of ability to produce/procure passive defense systems, examples of said systems include but is not limited to, Bremer walls (T-Walls), Hesco barriers, jersey barriers, and fortified/hardened facilities. Preference will be placed on ability to produce/procure locally, in an effort to shorten delivery/installation timetables, as well as ability to surge capacity if needed. As this is a sources sought the Contracting Officer is requesting feedback in terms of: 1) is the current NAICS code the most applicable? if not which one(s) would be a bitter fit? 2) What issues do you forsee in getting the local economy to support this type of requirement? 3) Are there any concerns with the local manufactoring base in being able to provide for this requirement? 4) Are there any concerns in coordinating and executing the delivery and or installation of these types of items? For any questions or concerns, please contact SSgt Milton Vasquez.

Closes Nov 20, 2026 · 1:00 PM
Read more →

Water Treatment Services

Dept. of Veterans Affairs · 262-NETWORK Contract Office 22 (36C262)  |  Los Angeles, California  |  Posted Nov 10, 2026
ConstructionSolicitationService-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside (FAR 19.14)

Solicitation for ADA Compliant Modular Ramp System

Closes Nov 20, 2026 · 1:00 PM
Read more →

Replace Condensate Pressure Pump

Dept. of Veterans Affairs · 262-NETWORK Contract Office 22 (36C262)  |  North Hills, California  |  Posted Nov 10, 2026
ConstructionCombined Synopsis/SolicitationService-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside (FAR 19.14)

Replace failed condensate pump with a new efficient pump Replace condensate pump and pump�s components to restore efficiency to the steam/condensate systems.

Closes Nov 20, 2026 · 3:00 PM
Read more →

561-26-104 Repair Operating Room (OR) & Bathroom Leaks

Dept. of Veterans Affairs · 242-NETWORK Contract Office 02 (36C242)  |  Not listed  |  Posted Nov 10, 2026
ConstructionSolicitation

561-26-104 Repair OR & Bathroom

Closes Nov 20, 2026 · 1:00 PM ET
Read more →

Phase 2 Construct Arabian Leopard Exhibit at the National Zoological Park

Smithsonian Institution · Smithsonian Institution  |  Washington, District of Columbia  |  Posted Nov 10, 2026
ConstructionSolicitationNo Set aside used

Amendment 0006 to the RFP is hereby issued and attached for download. The purpose of the amendment is to make the following changes to the Solicitation: Responses to RFI�s for Questions 227-552 ------------------------------------------------------------------------------------------------------------------- Amendment 0005 to the RFP is hereby issued and attached for download. The purpose of the amendment is to make the following changes to the Solicitation: Bid Due Date Extension RFI Due Date CAD & Revit File ------------------------------------------------------------------------------------------------------------------- Amendment 0004 to the RFP is hereby issued and attached for download. The purpose of the amendment is to make the following changes to the Solicitation: 100% Bid Documents Responses to RFI�s for Questions 225-226 Revised Bid Schedule ------------------------------------------------------------------------------------------------------------------- Amendment 0003 to the RFP is hereby issued and attached for download. The purpose of the amendment is to make the following changes to the Solicitation: Responses to RFI�s for Questions 53-224 Revised Bid Schedule 2nd Site Visit ------------------------------------------------------------------------------------------------------------------- Amendment 0002 to the RFP is hereby issued and attached for download. The purpose of the amendment is to make the following changes to the Solicitation: Responses to RFI�s for Questions 1-52 Revised Bid Schedule ------------------------------------------------------------------------------------------------------------------- Amendment 0001 to the RFP is hereby issued and attached for download. The purpose of the amendment is to make the following change to the Solicitation: Preproposal Meeting Sign-In sheet ------------------------------------------------------------------------------------------------------------------- The Smithsonian Institution is seeking offers to construct Phase 2 - Habitats & Animal Care Building for the Arabian Leopard Facility (ALF) at the Smithsonian National Zoological Park, located at 3001 Connecticut Ave NW, Washington, DC 20008, as described herein and the Contract Documents, including, without limitation, in the Specifications and Drawings for SF Project No. 2533105 both dated June 14, 2026. All of the requirements which the successful Offeror must meet concerning this project are set forth in detail in the solicitation Documents included with this Request for Proposal. Upon the receipt of Technical and Cost Proposals and the selection of a successful Offeror, the Smithsonian Institution will execute a Firm Fixed Price construction contract. The Smithsonian currently estimates that the fixed price for the entire project will exceed $10 Million. The Work includes but is not limited to Construction Services for Phase 2 � Habitats and Animal Care Building. This solicitation is for Phase 2 � Habitats and Animal Care Building only. Successful offerors must be capable of performing all work described and contemplated by this solicitation. Critical Elements of the Work: The successful Contractor shall be experienced and fully qualified with critical elements of the project, as listed, but not limited to, the items below: Working within an occupied, historic campus active with public, staff and animals Coordination of specialty trades within a small site footprint Coordination and installation of specialty animal doors, transfer systems and manually operated remote door controls. Coordination and installation of radiant flooring Coordination and installation of animal containment fencing, mesh and transfer chutes Coordination and installation of shotcrete faux rock and faux trees Mitigation of sound and vibration during construction so as not to harm animals in adjacent habitats Coordination of construction activities with Zoo operations to align with feeding schedules, DC zoning community noise regulations, Zoo hours, known and unknown animal welfare issues, veterinary care, and public events Procedures and documentation to ensure compliance with the established LEED building criteria Use of Building Information Modeling (BIM). The following firms were prequalified in solicitation 33330226FT0010005 and are the only firms from which offers will be accepted: Grunley 15020 Shady Grove Road, Suite 500 Rockville, MD 20850 Consigli 1825 K Street, Suite 1000 Washington, DC 20006 The Whiting-Turner Contracting Company 4600 River Road, Suite 200 College Park, MD 20737 PRE-BID TOUR OF THE SITE The Pre-proposal meeting is scheduled for Friday, September 18, 2026, at 9:00 AM Eastern Time. REQUEST FOR CLARIFICATIONS Itis requested that all questions be sent in no later than September 30, 2026. THE PROPOSAL DUE DATE IS FRIDAY, NOVEMBER 13, 2026, AT 3:00 PM EASTERN STANDARD TIME (EST). The subcontracting goals for this project are: 40% with small business concerns. Davis Bacon Building Wage Determination DC20260002 and DC20260001 shall apply. The Period of Performance for the Base Contract is 578 calendar days from the date of Notice to Proceed.

Closes Nov 20, 2026 · 3:00 PM ET
Read more →

Y--GRTE 237343 - Rehab 4 Lazy F Ranch

Dept. of the Interior · DSC Contracting Services Division  |  Not listed  |  Posted Nov 10, 2026
ConstructionSolicitationSmall Business Set Aside - Total

GRTE 237343 - "Rehabilitate 4 Lazy F Ranch Cabins for Employee Housing" UPDATE: See AM 003 for NPS responses to RFI's received. This solicitation is being issued as a Total Small Business Set Aside. Please see the attached solicitation package for details regarding this construction project at Grand Teton National Park. Please contact only the Contracting Officer at anthony_jasper@ios.doi.gov if you have questions pertaining to this project. Thank you for your interest in working with the National Park Service.

Closes Nov 20, 2026 · 5:00 PM
Read more →

ANF Duchesne Bunkhouse AC Replacement

Dept. of Agriculture · Usda-Fs, CSA Intermountain 6  |  Utah  |  Posted Nov 10, 2026
ConstructionCombined Synopsis/SolicitationSmall Business Set Aside - Total

Amendment 0001 posted Summary of Changes: Terms & Conditions Added bullet 8 for attachments C04 Attachment 9 � Q&A�s and Pictures Disregard questions as we are past the due date for all main questions Solicitation closing extended to November 20th, 2026 with offers due by 1500hrs MST Attachment 9 � Q&A Question and Answers from site visits and email submissions received by vendors. Statement of Work Added , 454B or R32 GWP refrigerants are also acceptable to Refrigerant requirements Updates to verbiage/requirements and information based on site visits Added Duchesne Bunkhouse floor plan and work notes, see page 20 Schedule of Items Adjusted to show correct solicitation #: 1240LR27Q0002 ****As a heads up we will be issuing an amendment for this solicitation prior to the current due date for quotes listed in the current solicitation. We will be extending the due date which will be listed in the amendment forthcoming. If you already submitted please resubmit an updated quote after the amendment has been sent out so that you can review the updates and sign the amendment form (SF30) and return it with your quote.**** This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in FAR Part 12. This announcement constitutes the only solicitation. Quotatuions are being requested and a separate written solicitation will not be issued. Solicitation number1240LR27Q0002 is issued as a Requst for Quotation (RFQ) for : BASE BID � The work under this contract includes furnishing all labor, materials, equipment, tools, transportation, and incidentals necessary to remove the existing 5?ton air?cooled refrigerant condenser unit and associated indoor coil, and to provide and install a new 2.5?ton air?cooled condenser unit and compatible indoor coil at the Duchesne Bunkhouse. Work shall include, but is not limited to: � Disconnecting, recovering, and properly disposing of all refrigerant in accordance with federal and state environmental regulations. � Disconnecting and removing the existing condenser, indoor coil, associated piping, electrical connections, mounting hardware, and any other components required for a complete system removal. � Providing and installing the new 2.5?ton condenser and coil, including all refrigerant piping, line sets, insulation, fittings, mounting pads, vibration isolation, and supports as required. � Making all necessary electrical modifications, including reconnection to existing circuits, installation of new disconnects or breakers if required, and ensuring code?compliant grounding and bonding. � Pressure?testing, evacuating, and charging the new system with the appropriate refrigerant type and quantity, following manufacturer specifications. � Verifying proper airflow, condensate drainage, thermostat compatibility, and control wiring to ensure a fully functional and balanced system. � Performing system start?up, testing, and commissioning to confirm proper operation and to meet manufacturer performance standards. � Restoring and/or repairing all surfaces, penetrations, and finishes affected by the work, leaving the site in clean and workmanlike condition. All work shall be completed in accordance with applicable codes, manufacturer instructions, and agency standards to provide a fully operational and complete HVAC system. This acquisition is set-aside for small business concerns. The applicable North American Industry Classification Standard Code is 238220. The small business size standard is $19 Million. This acquisition is a Total Small Business Set-Aside. All responsible sources may submit a quotation which will be considered by the agency.

Closes Nov 20, 2026 · 3:00 PM
Read more →

ANF Duchesne Bunkhouse AC Replacement

Dept. of Agriculture · Usda-Fs, CSA Intermountain 6  |  Utah  |  Posted Nov 10, 2026
ConstructionCombined Synopsis/SolicitationSmall Business Set Aside - Total

Amendment 0001 posted Summary of Changes: Terms & Conditions Added bullet 8 for attachments C04 Attachment 9 � Q&A�s and Pictures Disregard questions as we are past the due date for all main questions Solicitation closing extended to November 20th, 2026 with offers due by 1500hrs MST Attachment 9 � Q&A Question and Answers from site visits and email submissions received by vendors. Statement of Work Added , 454B or R32 GWP refrigerants are also acceptable to Refrigerant requirements Updates to verbiage/requirements and information based on site visits Added Duchesne Bunkhouse floor plan and work notes, see page 20 Schedule of Items Adjusted to show correct solicitation #: 1240LR27Q0002 ****As a heads up we will be issuing an amendment for this solicitation prior to the current due date for quotes listed in the current solicitation. We will be extending the due date which will be listed in the amendment forthcoming. If you already submitted please resubmit an updated quote after the amendment has been sent out so that you can review the updates and sign the amendment form (SF30) and return it with your quote.**** This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in FAR Part 12. This announcement constitutes the only solicitation. Quotatuions are being requested and a separate written solicitation will not be issued. Solicitation number1240LR27Q0002 is issued as a Requst for Quotation (RFQ) for : BASE BID � The work under this contract includes furnishing all labor, materials, equipment, tools, transportation, and incidentals necessary to remove the existing 5?ton air?cooled refrigerant condenser unit and associated indoor coil, and to provide and install a new 2.5?ton air?cooled condenser unit and compatible indoor coil at the Duchesne Bunkhouse. Work shall include, but is not limited to: � Disconnecting, recovering, and properly disposing of all refrigerant in accordance with federal and state environmental regulations. � Disconnecting and removing the existing condenser, indoor coil, associated piping, electrical connections, mounting hardware, and any other components required for a complete system removal. � Providing and installing the new 2.5?ton condenser and coil, including all refrigerant piping, line sets, insulation, fittings, mounting pads, vibration isolation, and supports as required. � Making all necessary electrical modifications, including reconnection to existing circuits, installation of new disconnects or breakers if required, and ensuring code?compliant grounding and bonding. � Pressure?testing, evacuating, and charging the new system with the appropriate refrigerant type and quantity, following manufacturer specifications. � Verifying proper airflow, condensate drainage, thermostat compatibility, and control wiring to ensure a fully functional and balanced system. � Performing system start?up, testing, and commissioning to confirm proper operation and to meet manufacturer performance standards. � Restoring and/or repairing all surfaces, penetrations, and finishes affected by the work, leaving the site in clean and workmanlike condition. All work shall be completed in accordance with applicable codes, manufacturer instructions, and agency standards to provide a fully operational and complete HVAC system. This acquisition is set-aside for small business concerns. The applicable North American Industry Classification Standard Code is 238220. The small business size standard is $19 Million. This acquisition is a Total Small Business Set-Aside. All responsible sources may submit a quotation which will be considered by the agency.

Closes Nov 20, 2026 · 3:00 PM
Read more →

Design-Build Renovation of Building 164, Outdoor Recreation Center, Homestead Air Reserve Base, Florida

Department of Defense · FA6648 482 LSS LGC  |  Homestead, Florida  |  Posted Nov 10, 2026
ConstructionSolicitation

The Department of the Air Force intends to award a firm-fixed-price design-build construction contract for renovation of the Outdoor Recreation Facility, Building 164, at Homestead Air Reserve Base, Florida. IAW DAFMAN 64-119, NAF Contracting Procedures, Small Business programs do not apply to NAF Contracting actions. This is a non-appropriated fund purchase, and it does not obligate appropriated funds of the Unites States Government. Non-appropriated funds are generated by the military community through the sale of goods and services and the collection of fees and charges for participation in military community programs. This purchase does not involve federal tax dollars. IAW DAFMAN 64-119, NAF Contracting Procedures, Para 2.8 NAF Procurement Exemptions, Title 15 U.S.C. Section 631 et seq., also known as the Small Business Act, as amended, and Federal Acquisition Regulation guidance relative to small business along with other award-preference programs. NAF contracts are awarded to the firm whose proposal is most advantageous to the NAFI. The Contractor shall furnish all labor, supervision, materials, equipment, transportation, design and engineering services, tools, permits, testing, inspections, quality control, warranties, and closeout documentation necessary to complete the work in accordance with the solicitation, Statement of Work, drawings, specifications, and all attachments. The requirement includes design-build services for renovation and improvement of Building 164. Work includes, but is not limited to, preparation of design documents; demolition; roofing and exterior-envelope improvements; doors, windows, exterior walls, and drainage work; interior renovations; mechanical, plumbing, electrical, and lighting work; site improvements; testing; inspections; warranties; and closeout documentation. The solicitation will include a base requirement consisting of Phases 1 and 2 and a separately priced Option 1 for Phase 3. The specific requirements for the base requirement and Option 1 are identified in Section B and the Statement of Work. NAICS Code: 236220 � Commercial and Institutional Building Construction Size Standard: $45.0 Million Average Annual Receipts PSC: Y1JZ � Construction of Miscellaneous Buildings Place of Performance: Homestead Air Reserve Base Building 164 Homestead, Florida Contract Type: Firm-Fixed-Price, Design-Build Construction Magnitude of Construction: Between $250,000 and $500,000 Period of Performance: 360 calendar days after issuance of the Notice to Proceed. SITE VISIT: A site visit will be held on 10 November 2026 at 10:00 a.m. Eastern Time. Attendance is strongly encouraged but is not mandatory. Offerors planning to attend shall submit the completed base-access form no later than 5 November 2026 at 10:00 a.m. Eastern Time. At this time, Homestead Air Reserve Base is processing site-visit access requests for United States citizens only. Site-visit directions have been posted to this posting. Offerors that do not attend the site visit remain responsible for becoming familiar with existing conditions, site access restrictions, facility operations, utility conditions, material-staging limitations, and all other conditions that may affect performance. Google Maps Link: https://maps.app.goo.gl/ivLWZZMdBPCdnQMU7 Sign In Sheet has been posted as attachment to this posting. QUESTIONS: Questions concerning this solicitation shall be submitted in writing to Tahj Guilford at tahj.guilford.2@us.af.mil no later than 13 November 2026 at 10:00 a.m. Eastern Time. Questions received after the stated deadline may not be answered. The Government anticipates posting responses to timely submitted questions on or about 18 November 2026 at 3:00 p.m. Eastern Time. PROPOSAL SUBMISSION: Offerors shall submit proposals electronically to tahj.guilford.2@us.af.mil no later than 23 November 2026 at 12:00 p.m. Eastern Time. Proposals shall be submitted in the format required by Sections L and M of the solicitation. Offerors are responsible for ensuring proposals are received by the Government before the closing date and time. The Government intends to make award without discussions but reserves the right to conduct discussions if determined to be in the Government�s best interest. All amendments to this solicitation will be posted through SAM.gov. Offerors are responsible for monitoring SAM.gov for amendments and acknowledging all amendments with their proposal. The full solicitation package, including the SF 1442, Statement of Work, pricing schedule, drawings, specifications, wage determination, and other attachments, are available with this notice.

Closes Nov 23, 2026 · 12:00 PM ET
Read more →

REMEDIATION AND RESTORATION ACTIVITIES

Dept. of Transportation · SYS CNTR  |  Matawan, New Jersey  |  Posted Nov 10, 2026
ConstructionCombined Synopsis/SolicitationSmall Business Set Aside - Total

Under an Interagency Agreement, the U.S. Department of Transportation John A. Volpe National Transportation Systems Center (Volpe Center) is providing support to the Federal Aviation Administration (FAA) Facilities Environmental Cleanup (ECU) Program. As part of this effort, a Remedial Action (RA) will be conducted at one facility in the FAA Eastern Service Area (ESA) to remove identified soil contamination. The site requiring remediation for lead- and polychlorinated biphenyl (PCB)-contaminated soils is QPI RCAG � Matawan, NJ (40.370895�,-74.220954�). The FAA�s ECU Program has identified the potential for environmental and human health risks and/or liability associated with the facility above based on prior research, known historic operations and practices, and required cleanup actions. The Contractor shall conduct all work in accordance with Federal, State, and local requirements. Where inconsistencies exist, the Contractor shall follow the most stringent requirement. The Contractor shall submit a draft Remediation and Restoration work plan (Work Plan) (where applicable) within ten (10) business days of the project kick-off meeting that addresses the project requirements below. This task involves the preparation and submission of a draft and final Work Plan. The Work Plan shall detail the technical approach and schedule for conducting all contaminated soil remediation, disposal, and site restoration activities described below. To assist with preparation of the Work Plan, the contractor shall thoroughly review the Government-furnished information (GFI) for pertinent information. The removal quantities and depths in the Preliminary Assessment/Site Investigation and Remedial Investigation reports (if provided) are to be used as a guide along with the estimated total quantities listed in this SOW Section 2.2.2. The Work Plan shall describe methods and procedures for performing soil remediation, disposal, and restoration. Disposal methods must be detailed by the contractor for the site. FAA has consulted a Licensed Site Remediation Professional (LSRP), and the LSRP will select and approve all disposal facilities where waste and debris is to be shipped. Disposal sampling and paperwork is the responsibility of the contractor. Confirmatory sampling has already been conducted at the site. Additionally, the work plan shall also identify any required permits needed to perform the work. Futhermore, components required with the Work Plan are the Site Safety and Health Plan (SSHP), which shall include personnel health and safety precautions to be followed. The work plan shall also include a brief Risk Management Plan that identifies major risks and hazards on each site and discusses ways to minimize these risks. An outline summarizing the required content of the work plan is Technical Approach (Method and procedures for soil remediation, removal, disposal a. Identification of required work permits and b. Site Safety Health Plan (SSHP). Risk Management Plan a. Identification of major risks and b.Risk mitigation plan. The contractor should expect a 5-business day Volpe Center review period between submission of the Draft Work Plan and receipt of Volpe Center comments. The Volpe Center and the Contractor shall meet to discuss any comments and changes, if necessary. The contractor shall make the changes and submit a Final Work Plan within 5 business days of the receipt of comments. Contaminated Soil Remediation: Preliminary Assessment/Site Investigation (PA/SI) and Remedial Investigation (RI) activities completed between 2020 and 2025 found soils at the below site containing contamination above FAA�s action levels, which are based on U.S. Environmental Protection Agency (EPA) and/or New Jersey Residential Soil Remediation Standards. Examples include lead-in-soil concentrations above 200 mg/kg (ppm) or PCB-in-soil concentrations above 0.25 mg/kg. See SOW for greater details.

Closes Nov 23, 2026 · 1:00 PM ET
Read more →

REMEDIATION AND RESTORATION ACTIVITIES

Dept. of Transportation · SYS CNTR  |  Matawan, New Jersey  |  Posted Nov 10, 2026
ConstructionCombined Synopsis/SolicitationSmall Business Set Aside - Total

Under an Interagency Agreement, the U.S. Department of Transportation John A. Volpe National Transportation Systems Center (Volpe Center) is providing support to the Federal Aviation Administration (FAA) Facilities Environmental Cleanup (ECU) Program. As part of this effort, a Remedial Action (RA) will be conducted at one facility in the FAA Eastern Service Area (ESA) to remove identified soil contamination. The site requiring remediation for lead- and polychlorinated biphenyl (PCB)-contaminated soils is QPI RCAG � Matawan, NJ (40.370895�,-74.220954�). The FAA�s ECU Program has identified the potential for environmental and human health risks and/or liability associated with the facility above based on prior research, known historic operations and practices, and required cleanup actions. The Contractor shall conduct all work in accordance with Federal, State, and local requirements. Where inconsistencies exist, the Contractor shall follow the most stringent requirement. The Contractor shall submit a draft Remediation and Restoration work plan (Work Plan) (where applicable) within ten (10) business days of the project kick-off meeting that addresses the project requirements below. This task involves the preparation and submission of a draft and final Work Plan. The Work Plan shall detail the technical approach and schedule for conducting all contaminated soil remediation, disposal, and site restoration activities described below. To assist with preparation of the Work Plan, the contractor shall thoroughly review the Government-furnished information (GFI) for pertinent information. The removal quantities and depths in the Preliminary Assessment/Site Investigation and Remedial Investigation reports (if provided) are to be used as a guide along with the estimated total quantities listed in this SOW Section 2.2.2. The Work Plan shall describe methods and procedures for performing soil remediation, disposal, and restoration. Disposal methods must be detailed by the contractor for the site. FAA has consulted a Licensed Site Remediation Professional (LSRP), and the LSRP will select and approve all disposal facilities where waste and debris is to be shipped. Disposal sampling and paperwork is the responsibility of the contractor. Confirmatory sampling has already been conducted at the site. Additionally, the work plan shall also identify any required permits needed to perform the work. Futhermore, components required with the Work Plan are the Site Safety and Health Plan (SSHP), which shall include personnel health and safety precautions to be followed. The work plan shall also include a brief Risk Management Plan that identifies major risks and hazards on each site and discusses ways to minimize these risks. An outline summarizing the required content of the work plan is Technical Approach (Method and procedures for soil remediation, removal, disposal a. Identification of required work permits and b. Site Safety Health Plan (SSHP). Risk Management Plan a. Identification of major risks and b.Risk mitigation plan. The contractor should expect a 5-business day Volpe Center review period between submission of the Draft Work Plan and receipt of Volpe Center comments. The Volpe Center and the Contractor shall meet to discuss any comments and changes, if necessary. The contractor shall make the changes and submit a Final Work Plan within 5 business days of the receipt of comments. Contaminated Soil Remediation: Preliminary Assessment/Site Investigation (PA/SI) and Remedial Investigation (RI) activities completed between 2020 and 2025 found soils at the below site containing contamination above FAA�s action levels, which are based on U.S. Environmental Protection Agency (EPA) and/or New Jersey Residential Soil Remediation Standards. Examples include lead-in-soil concentrations above 200 mg/kg (ppm) or PCB-in-soil concentrations above 0.25 mg/kg. See SOW for greater details.

Closes Nov 23, 2026 · 1:00 PM ET
Read more →

CG Station Burlington Replacement Water Heaters

Dept. of Homeland Security · BASE CAPE COD  |  Burlington, Vermont  |  Posted Nov 10, 2026
ConstructionSolicitationNo Set aside used

U.S. Coast Guard Station Burlington requires removal and replacement of failed domestic hot-water heater equipment with new like-for-like equipment and restore reliable hot-water service to the galley, berthing spaces, and heads.see the attached statement of work. Site visits are urged and expected please contact the COR, contact information is in the statement of work. Qoutes must be submitted on company letterhead and submitted to Jessica.L.Bonham@uscg.mil and Jason.L.Williams@uscg.mil In accordance with the IPP clause; ELECTRONIC INVOICING AND PAYMENT REQUIREMENTS - INVOICE PROCESSING PLATFORM (IPP) (JAN 2016), payment requests for all new awards must be submitted electronically through the U. S. Department of the Treasury's Invoice Processing Platform System (IPP). The Contractor must use IPP for contracts and orders awarded April 11, 2016 or later. To constitute a proper invoice, the payment request must comply with the requirements identified in FAR 32.905(b), "Payment documentation and process" and the applicable Prompt Payment clause included in this contract. The IPP website address is: https:// www.ipp.gov. Contractor assistance with IPP enrollment can be obtained by contacting IPPCustomerSupport@fms.treas.gov or phone (866) 973-3131.

Closes Nov 23, 2026 · 12:00 PM ET
Read more →

Z--Security Fence and Gate Replacement

Dept. of Commerce · DEPT OF Commerce NOAA  |  Not listed  |  Posted Nov 10, 2026
ConstructionCombined Synopsis/Solicitation

Security Fence and Gate Replacement for the Automated Surface Observation System (ASOS) at the Billy Mitchell Airport (HSE) in Hatteras, NC (MHX)

Closes Nov 23, 2026 · 2:00 PM
Read more →

Atchison Storm Sewer Separation Improvements, Atchison, Kansas

Department of Defense · W071 Endist Kansas CITY  |  Not listed  |  Posted Nov 10, 2026
ConstructionSolicitationSmall Business Set Aside - Total

The purpose of this amendment is to extend the bid opening date and amend the Specifications SETION 01 30 00 Paragraph 1.5.2 (attached).The U.S. Army Corps of Engineers, Kansas City District, Intends to issue an invitation for bid (IFB) solicitation for construction activities for storm sewer separation and improvements. The work covered by this contract consists of furnishing all equipment, labor, operators, supervision/ site superintendent, quality control, supplies, materials, and incidentals necessary to satisfactorily perform related work, including pavement, sidewalk, driveway, and parkway restoration. RTA Plans and Specs have been included as separate attachments. * The Supplemental Bid Schedule Attachment has been added.

Closes Nov 24, 2026 · 1:00 PM
Read more →

Atchison Storm Sewer Separation Improvements, Atchison, Kansas

Department of Defense · W071 Endist Kansas CITY  |  Not listed  |  Posted Nov 10, 2026
ConstructionSolicitationSmall Business Set Aside - Total

The purpose of this amendment is to extend the bid opening date and amend the Specifications SETION 01 30 00 Paragraph 1.5.2 (attached).The U.S. Army Corps of Engineers, Kansas City District, Intends to issue an invitation for bid (IFB) solicitation for construction activities for storm sewer separation and improvements. The work covered by this contract consists of furnishing all equipment, labor, operators, supervision/ site superintendent, quality control, supplies, materials, and incidentals necessary to satisfactorily perform related work, including pavement, sidewalk, driveway, and parkway restoration. RTA Plans and Specs have been included as separate attachments. * The Supplemental Bid Schedule Attachment has been added.

Closes Nov 24, 2026 · 1:00 PM
Read more →

W9127827SC002 FY28 Horizontal Launch Infrastructure, SPOTFi (OTA) Progressive-Design-Build OT

Department of Defense · W074 Endist Mobile  |  Not listed  |  Posted Nov 10, 2026
ConstructionSpecial Notice

The U.S. Army Corps of Engineers (USACE) is issuing this special notice to announce an upcoming competition for a design and construction solicitation for FY28 Horizontal Launch Infrastructure, SPOTFi (OTA) using Progressive Design-Build under 10 USC 2808a Other Transaction Authority for Construction. This notice is for informational and planning purposes to allow interested parties to prepare for and provide feedback prior to the official solicitation release.

Closes Nov 24, 2026 · 2:00 PM
Read more →

ACC003 Weapons Generation Complex and Northern Flightline

Department of Defense · W2SN Endist Alaska  |  Not listed  |  Posted Nov 10, 2026
ConstructionSolicitation

The U.S. Army Corps of Engineers USACE, Alaska District, is seeking to identify a Design-Build Team or Design-Builder for ACC003 Weapons Generation Complex and Northern Flightline, a major project in support of the Fighter Town Recapitalization FTR Program at Joint Base Elmendorf-Richardson JBER, Alaska. The FTR Program is a multiphase initiative to redevelop a significant portion of JBER with modern, resilient, and expanded infrastructure while maintaining mission continuity for active base and airfield operations throughout all phases of construction and facility turnover. Within this broader program, the ACC003 project will encompass construction of the new Weapons Generation Complex and associated Northern Flightline facilities at JBER, Alaska. The scope includes approximately sixteen new facilities, comprising hangars, operations buildings, and munitions storage magazines. A key constraint is the requirement for the new WGC to be operational before the existing facility can be decommissioned, ensuring zero operational downtime for this mission. The project will be constructed on pre-excavated sites with preconstructed utilities delivered under a separate, preceding agreement.

Closes Nov 24, 2026 · 2:00 PM
Read more →

Facility Maintenance and Repair Services, APS Zutendaal, Belgium

Department of Defense · 0409 AQ HQ Contract  |  Not listed  |  Posted Nov 10, 2026
ConstructionSources SoughtNo Set aside used

The Regional Contracting Office (RCO) Benelux is issuing this Sources Sought as a means of conducting market research to identify local vendors capable of serving as the prime contractor who have an interest in the requirement for Facility Maintenance & Repair Services at APS Zutendaal in Belgium. The intention is to procure these services on a competitive basis. The contract type is anticipated to be Firm Fixed Price Indefinite Delivery/Indefinity Quantity (IDIQ) and the estimated period of performance is expected to be seven years (seven ordering periods). The performance is estimated to commence in May of 2027. Telephone inquiries will not be accepted or acknowledged, and no feedback or evaluations will be provided to companies regarding their submissions. Place of performance: APS Zutendaal, Leutsestraat 34, 3690 Zutendaal, Belgium. REQUIRED CAPABILITIES The Contractor shall perform Preventive Maintenance, Inspections, Labeling, Testing, On-call Maintenance, Repairs (to include replacement parts) of facilities, equipment, and systems which shall consist of, but not limited to: Air Conditioning systems, Exhaust Extraction system, Heating systems, Heating Pumps, Electric Heaters, Safety Emergency Lighting, including, fluorescent and streetlights, Water Lifting Stations, Boilers, Distribution lines, Heat controls, Heat Oil Storage and Delivery System, Radiators, Underground Pipes, Water and Sewer Lines, Storm Water system, Roof Drains, Roof Vents, Chimney Tower Emissions/Structure, Dehumidification Systems, Lights, Generators, Lightning Protection Systems, High/Medium Voltage Transformers and Switching Stations, POL Pumps, Leakage Protection systems and Underground Fuel Tanks, Ceiling Fan Coil Units, Manholes /Manhole Frame, ventilations, etc. If your organization has the potential capacity to perform these contract services, please provide the following information: 1) Organization name, address, email address, Web site address, telephone number, and size and type of ownership for the organization; and 2) Answers on next questions/statements: Are you interested in participating in the "Request for Quotations" (RFQ) solicitation? Are you able to provide a Firm Fixed Price for a period of performance of 7 years? (Firm fixed pricing means established firm pricing per ordering period which can reflect increases between each period. No pricing is requested at this time). Is your company familiar with working with the US Government? ADDITIONAL INFORMATION AND SUBMISSION DETAILS All responses or questions you might have under this Sources Sought must be e-mailed to both: the Contract Specialist, Sandra Van Beneden, at sandra.r.vanbeneden.ln@army.mil and the Contracting Officer, Victoria Schermerhorn, at victoria.e.schermerhorn.civ@army.mil. All data received in response to this Sources Sought that is marked or designated as corporate or proprietary will be fully protected from any release outside the Government. The Government is not committed nor obligated to pay for the information provided, and no basis for claims against the Government shall arise as a result of a response to this Sources Sought. NOTE: Only Contractors who are registered and have an active account in the System for Award Management (www.sam.gov) at the time of award may be awarded a contract as a result of a solicitation. Payments for this requirement will be made through the Wide Area Work Flow (WAWF) system. Contractors shall be registered in WAWF before they could submit an invoice. In order to create a WAWF account, the contractor must be registered on www.sam.gov DISCLAIMER �THIS SOURCES SOUGHT IS FOR INFORMATIONAL PURPOSES ONLY. THIS IS NOT A �REQUEST FOR PROPOSAL OR QUOTE (RFP/RFQ)� TO BE SUBMITTED. IT DOES NOT CONSTITUTE A SOLICITATION AND SHALL NOT BE CONSTRUED AS A COMMITMENT BY THE GOVERNMENT. RESPONSES IN ANY FORM ARE NOT OFFERS AND THE GOVERNMENT IS UNDER NO OBLIGATION TO AWARD A CONTRACT AS A RESULT OF THIS ANNOUNCEMENT. NO FUNDS ARE AVAILABLE TO PAY FOR PREPARATION OF RESPONSES TO THIS ANNOUNCEMENT. ANY INFORMATION SUBMITTED BY RESPONDENTS TO THIS TECHNICAL DESCRIPTION IS STRICTLY VOLUNTARY. RESPONSES WILL NOT BE RETURNED TO THE RESPONDER. NOT RESPONDING TO THIS NOTICE DOES NOT PRECLUDE PARTICIPATION IN ANY FUTURE REQUEST FOR QUOTE (RFQ) OR INVITATION FOR BID (IFB) OR RFP, IF ANY ISSUED.

Closes Nov 24, 2026 · 2:00 PM
Read more →

NAS WHITING FIELD AIRFIELD PAVEMENT REPAIRS

Department of Defense · Navfacsyscom Southeast  |  Milton, Florida  |  Posted Nov 10, 2026
ConstructionSpecial Notice

Project Labor Agreement (PLA) Request for Information (RFI) for Construction Project for Airfield Pavement Repairs in the State of Florida This is a request for information/market survey. This is not a request for proposal, request for quote, or an invitation for bid. There will be no solicitation, specification, or drawings available at this time. Naval Facilities Engineering System Command (NAVFAC) Southeast is soliciting comments from the public addressing the potential use of Project Labor Agreements (PLA) for the following construction project. The construction project is for the Airfield Pavement Repairs located at Naval Air Station Whiting Field, Milton, Florida. Construction may include, but is not limited to, repairing the airfield pavement by mill, overlay, and restripe pavement sections within the north airfield at NAS Whiting Field, including Runway 05-23, Runway 14-32, Taxiway A, Taxiway B, Taxiway C, Taxiway D, Taxiway E, Taxiway F, Taxiway G, Taxiway HL, Taxiway NL, Taxiway APPC, and the adjacent Parking Areas. Approximate total concrete pavement repair area is approximately 800,000 square yards. Repairs will include barricades, saw cutting, milling, asphalt overlay, sweeping and preparing pavement surfaces. Minor repairs to concrete pavement include spall repair and joint replacement. The grade adjacent to the runway shoulder pavement edges will be re-graded, compacted and sodded for positive drainage. All airfield pavement markings will be replaced and the airfield lighting removed and replaced as required, reinstalled and adjusted to enable milling and overlay in accordance with UFC 3-260-01 Airfield and Heliport Planning and Design, UFC 3-260-02 Pavement Design for Airfields, and NAVAIR 51-50AAA-2 General Requirements for Shore based Airfield Marking and Lighting. New airfield markings (striping and numbers) will be applied in accordance with current FAA criteria and UFC 3-260-04 Airfield and Heliport Marking. located in the State of Florida. Project will be design-bid-build. NAICS Code: 237310. The magnitude of construction is anticipated to be $25M � $100M. General period of performance is anticipated to be approximately 540 calendar days. A PLA is defined as a pre-hire collective bargaining agreement with one or more labor organizations that establishes the terms and conditions of employment for a specific construction project and is an agreement as described in 29 U.S.C. 158 (f). Federal Acquisition Regulation (FAR) policy states: Executive Order (E.O.) 14063, Use of Project Labor Agreements for Federal Construction Projects, requires agencies to use PLAs in large-scale construction projects (defined as a construction projects with a total estimated cost at or above $35M) to promote economy and efficiency in the administration and completion of Federal construction projects. When awarding a contract in connection with a large-scale construction project, agencies shall require use of a PLA for contractors and subcontractors engaged in construction on the project, unless an exception(s) at FAR 22.504(d) applies. Reference is made to: FAR Subpart 22.5 Use of Project Labor Agreements for Federal Construction Projects; provision, FAR 52.222-33 Notice of Requirement for Project Labor Agreement; and to clause, FAR 52.222-34 Project Labor Agreement. In consideration of the above factors, and any others which may be deemed appropriate, the public is invited to provide responses on the use of a PLA for this construction project utilizing the attached questionnaire. This is not an announcement of the availability of a solicitation nor is it a means of generating a plan holder�s list. This survey is for planning purposes only and shall not be construed as a Request for Proposal or as an obligation on the part of the Government. The Government does not intend to award a contract on the basis of this market survey or otherwise pay for the requested information. The Government will not provide a debriefing on the results of this survey. All information will be held in a confidential manner and will only be used for the purposes intended. Responses shall be submitted on the attached questionnaire via email to Cynthia McMonigle at cynthia.a.mcmonigle.civ@us.navy.mil, and cc: Aimee Johnson at aimee.n.johnson2.civ@us.navy.mil. no later than 3:00 PM Eastern Time on 11/24/2026.

Stated in the notice: The magnitude of construction is anticipated to be $25M � $100M.

Closes Nov 24, 2026 · 3:00 PM ET
Read more →

Project # 528A6-26-607 Replace Flooring for Rm. 140 B76 | Bath VAMC

Dept. of Veterans Affairs · 242-NETWORK Contract Office 02 (36C242)  |  Not listed  |  Posted Nov 10, 2026
ConstructionSolicitation

Presolicitation Notice Presolicitation Notice Page 3 of 3 Solicitation *=Required Field Presolicitation Notice Page 1 of 3 DESCRIPTION Presolicitation Notice Presolicitation Notice Page 4 of 4 *=Required Field Presolicitation Notice Page 1 of 4 Page 1 of Page 1 of This solicitation notice is to inform potential offerors that Bath, NY VA Medical Center will be posting a solicitation (36C24227B0004) on or about October 28, 2026, for Replace Flooring RM140 B76. All work is to be performed at the Bath, NY VA Medical Center. General scope of work includes: The general scope of this project is to the replace the existing flooring in Building 76, Rooms 140 and 140A, based on the design documents provided. Additionally, the project encompasses electrical modifications to support the X-ray equipment, including extending power conduits and cables, installing new power switches, providing equipment structural support, and other related work as indicated in the design drawings. As Building 76 operates as a fully functional medical center, work hours may be restricted, and off-hours work may be necessary to ensure uninterrupted hospital operations, as directed by the Contracting Officer s Representative (COR). The contractor shall complete all work within 60 days of receiving the Notice to Proceed. The Bath VAMC requires a Contractor to perform the construction work necessary to accomplish this goal. The Contractor shall provide all supervision, labor, services, tools, equipment, and materials required to perform work. Work under this effort is fully described in the project drawings and specifications. Additional administrative and management related requirements are described throughout this document. A brief overview of the construction work will be included with SOW in the solicitation.

Closes Nov 24, 2026 · 11:00 AM ET
Read more →

Clearfield Job Corps Center Design-Build (D-B) Roof & HVAC Replacement

Dept. of Labor · DOL - JCAS - AEC  |  Clearfield, Utah  |  Posted Nov 10, 2026
ConstructionSources SoughtSmall Business Set Aside - Total

TITLE: Sources Sought � Design-Build (D-B) Services for the Automotive (United Auto Workers - UAW) Building E9 Roof Replacement, HVAC Replacement and Seismic Upgrades at the Clearfield Job Corps Center The US Department of Labor, Office of Job Corps Acquisition Services, has a requirement for a qualified firm to provide design/build services that include, but are not limited to, the complete design and construction for the replacement of the existing roofing system including the roof eaves, overhangs and the roof drainage systems, roof HVAC curbs, pipe penetrations, flashings, roof edge pieces, etc. as needed to provide a weathertight roof system. THIS IS A SOURCES SOUGHT NOTICE. In accordance with Revolutionary FAR Overhaul (RFO) 10.001(b), this notice is issued for the purpose of conducting market research. Market research is being conducted to determine if there are potential small businesses with the capacity and experience to perform the required work. This Notice is not to be misconstrued as an Invitation for Bid or Request for Proposal. THERE IS NO SOLICITATION AT THIS TIME. This request for capability information does not constitute a request for proposals; submission of any information in response to this market survey is purely voluntary; the Government assumes no financial responsibility for any costs incurred. The full extent of the work will be described in the solicitation, which may follow at a later date. However, a summary of the services to be performed is provided as follows: The work includes design-build (design and construction) services for the complete design and construction for the phased replacement of the existing ballasted built-up roofing system with a new EPDM roofing system including roof eaves, overhangs, roof drainage systems, roof HVAC curbs, pipe penetrations, flashings, roof edge pieces, etc. as needed to provide a weathertight roof system for the Automotive (UAW) Building E9 which totals approximately 120,000 gross square feet (GSF). Also included is the design and construction of the replacement of roof mounted HVAC units and associated ductwork, replacement of roof mounted exhaust fans, and seismic upgrades to the building structure to bring it up to current seismic codes for Utah. The roof design shall meet current allowable wind loads for Clearfield, Utah. Work shall be in accordance with the National Roofing Contractors Association (NCRA) recommendations for the type of roofing system specified. The NAICS code for this project is 236220 with a size standard of $45 Million. The magnitude of construction for this project is more than $10 million. Firms interested in this requirement are requested to submit a statement of qualifications. Your statement of qualifications shall demonstrate the capacity of your firm to perform the services described above, and should include the following information: 1. Provide two (2) project examples where the D/B Contractor has completed (substantially or final) the design and replacement of single-ply Ethylene Propylene Diene Monomer (EPDM) roofing systems within the last five (5) years. 2. Provide two (2) project examples where the D/B Contractor has completed (substantially or final) the design and replacement of roof mounted HVAC units and associated ductwork and air devices within the last five (5) years. 3. Provide two (2) project examples where the D/B Contractor has completed (substantially or final) the design and seismic upgrades in occupied buildings within the last five (5) years. Project examples shall include the location of the project, the project owner, and a brief description of the services performed. Your synopsis should also include the date of contract award, the original and final date of contract completion. Using the previous project examples indicate the original contract price and final contract value. The Government will evaluate market information to ascertain potential market capacity to 1) provide services consistent in scope and scale with those described in this notice and otherwise anticipated; and 2) secure and apply the full range of corporate financial, human capital, and technical resources required to successfully perform similar requirements. Your submission should not exceed 10 pages. Your response to this notice, is due no later than November 24, 2026, by 2:00 PM EST, and submit it via email to Bernadette Hughes, hughes.bernadette.l@dol.gov and Martrelle Pyatt Harvin at PyattHarvin.Martrelle@dol.gov Your submission must cite the following information, at a minimum: Response to RFI 1605AE-27-N-00001; Company Name, Address, and Company Point of Contact; SAM Unique Entity Identifier (UEI); Business Size Standard/Classification, and socio-economic status, if applicable; NAICS code certifications. Acknowledgment of responses will not be made, nor will respondents be notified regarding the results of the Government�s evaluation of the information received. The determination to proceed with the acquisition is within the discretion of the Government. Telephone inquiries will not be accepted and no questions in connection with this notice will be accepted. Please be reminded that a prospective Offeror interested in obtaining a contract award with the Government must be registered in the Federal Government's System for Award Management (SAM) database. Additional information regarding contractor registration can be obtained through the following website, www.SAM.gov.

Stated in the notice: The magnitude of construction for this project is more than $10 million.

Closes Nov 24, 2026 · 2:00 PM ET
Read more →

Y--NC PEA ISLAND NWR FENCE at RED WOLF

Dept. of the Interior · FWS Contracting Activity  |  Not listed  |  Posted Nov 10, 2026
ConstructionPresolicitation

The Red Wolf Recovery Program�s Sandy Ridge Facility uses 16 holding pens to temporarily house red wolves and coyotes for treatment, acclimation, and other management needs. The facility�s 2,500-foot double-perimeter fence has deteriorated over time, reducing its effectiveness at containing wildlife and preventing outside access. The project will remove the damaged inner fence, repair the existing outer fence, and remove one deteriorated holding pen to allow a section of fence to be relocated from standing water to higher ground.

Closes Nov 24, 2026 · 1:00 PM ET
Read more →

Z--OR-FWS SHELDON NWR-INSTALL WOOD STOVE

Dept. of the Interior · FWS Contracting Activity  |  Not listed  |  Posted Nov 10, 2026
ConstructionPresolicitationSmall Business Set Aside - Total

OR-FWS SHELDON NWR-INSTALL WOOD STOVE

Closes Nov 24, 2026 · 5:00 PM
Read more →
← NewerPage 6 of 24Older →
Scroll to Top